مجموع سنوات الخبرة: 9 سنوات, 2 أشهر
فبراير 2007
إلى مارس 2016
Sudan
في Araak Group
البلد :
السودان - الخرطوم
Responsible of panel installation .1
2- Responsible of Cable (power and control)
installation.
3-Responsible of L.V power station installation,
operation and maintenance.
5- Responsible of capacitor bank installation and
maintenance.
6-Production machines and utilities installation.
7-High voltage panels connection and installation.
8-Production machines interface connection.
9-Production machines operation and periodic
maintenance (KRONES, SIG SIMONAZZI, KHS,
SIDEL, SMI, VIDEO JET, HITACHI, DOMINO
LASER CODING MACHIE AND NTS CONVEYORS)
2- Responsible of Cable (power and control)
installation.
3-Responsible of L.V power station installation,
operation and maintenance.
5- Responsible of capacitor bank installation and
maintenance.
6-Production machines and utilities installation.
7-High voltage panels connection and installation.
8-Production machines interface connection.
9-Production machines operation and periodic
maintenance (KRONES, SIG SIMONAZZI, KHS,
SIDEL, SMI, VIDEO JET, HITACHI, DOMINO
LASER CODING MACHIE AND NTS CONVEYORS)
انشر على فيسبوك
انشر على تويتر
مشاركة عبر البريد الإلكتروني