Sudan
Araak Group
Total years of experience :9 years, 2 Months
Responsible of panel installation .1
2- Responsible of Cable (power and control)
installation.
3-Responsible of L.V power station installation,
operation and maintenance.
5- Responsible of capacitor bank installation and
maintenance.
6-Production machines and utilities installation.
7-High voltage panels connection and installation.
8-Production machines interface connection.
9-Production machines operation and periodic
maintenance (KRONES, SIG SIMONAZZI, KHS,
SIDEL, SMI, VIDEO JET, HITACHI, DOMINO
LASER CODING MACHIE AND NTS CONVEYORS)
بكلاريوس هندسة كهربية من جامعة الزعيم الازهرى -السودان دبلوم اوتوكاد دبلوم تطبيقات حاسوب دورة فى مكافحة الحريق دورة فى دوائر التحكم