مجموع سنوات الخبرة :30 years, 2 أشهر

Operation Construction Manager في Construction
  • مصر - القاهرة
  • فبراير 2019 إلى فبراير 2020

worked as Operation Manager for the company, the project was with SODIC

Construction Manager في Concord for Engineering
  • يناير 2017 إلى يناير 2019
Construction Project Manager في Hassan Allam Construction
  • مصر - القاهرة
  • يناير 2009 إلى أبريل 2017

Following are samples of projects which I participated in different positions; as Project Manager,
Construction Manager and Quality Control Manager;
* Project Manager: Palm Hills - Golf Views, the project is Residential
Development, of Luxurious Villas, Consultant AAW
* QA/QC Manager: CHLEF Cement Plant (Algeria), the Project is for
production of Cement 6000 ton/day, which includes all Civil works required,
main Contractor FCB
* Construction Manager: Gulsan Project; the Project is for manufacturing
hygienic materials, which includes steel structure & Concrete works,
Consultant ECG
* Project Manager: L’Oreal Project; the project is a cosmetic plant owned by
L’Oreal and managed by SNC LAVALIN, a main building including the
production, storage, control units together with all the facility buildings which
includes different kinds of work activities; Concrete, Steel structure, finishes
and the accompanying Infrastructure works, includes steel structure &
Concrete works
* Project Manager (Part of the Project): SODIC Project; the project is
Residential development; Consisting of Luxurious residential buildings,
underground basement over the whole building area to be used as an
underground parking, recreational areas. Located at the Sixth of October city
within a unique luxurious compound, Consultant ECG
* QA/QC Manager: Al-Shabab Power Plant (1000 MW); the project is a power
plant consisting of 8 power islands with 8 generator pedestals and turbines,
auxiliary skids and buildings from lube oils, tanks and washing water. The
MOHAMEDRAAFAT
raafat.mohmd@yahoo.com C: +2(012) 820-54542
2/4
challenge was achieving the project in 6 months, Main Contractor KHARAFI
National and managed by PGESCO
* QA/QC Manager: Arabian Cement Company; the project is industrial
constructed over an area of 13.4 hectare intended to produce cement bagged
and bulk, Managed by RHI and designed by FL SCHMIDTH

Senior Project Manager في LV SALAMANCA INGENIEROS
  • يناير 2007 إلى يناير 2009

Project Manager to develop a mix-use real estate development, comprising of a total
site area of 19 Hectares in Tripoli, consists of 3, 4 and 5 stars hotels, high rise buildings
from 30 - 45 floors buildings, residential, retails and office buildings and shopping mall.
Head Office in Spain and Dubai
* Scope of work in the project:
- Executed local market research for the project
- Prepared and assisted in the project’s building permit preparation and approach
- Reviewed project plans, schedules, and execution preparation
- Coordinated work between contractors according to specifications and client
requirements
- Participated in preparation of the project plan manual according to the projects’
environment and location
- Participated in preparation of the sustainability development and approach outline
reports and follow-up plans
- Assisted in the preparation of the energy consumption saving plans and reports
- Attended meetings with the client for follow-up reasons
- Assisted the LDM team by identifying the feedback from the different parties
- Assisted the LPM by following the responsibilities matrix and completing the
different tasks assigned in relation to the different activities in the project
- Prepared the monthly report submitted to the LPM

Project Manager في Array International - Assaf Group
  • مصر - القاهرة
  • يناير 2002 إلى يناير 2007
Resident Engineer في SABBOUR ASSOCIATES
  • مصر
  • يناير 1998 إلى يناير 2002

requirements achievement. Reviewed integration of project phases ensuring successful
completion of project

Partner في ROCKET CONTRACTING COMPANY
  • يناير 1995 إلى يناير 1998

Bidsattendance, employeeshiring, project’scontractsreview,
appointingsubcontractors and workersfordifferentactivities

Project Manager في VARCO PRUDEN
  • مصر - القاهرة
  • يناير 1990 إلى يناير 1995

(ISO 9001)
Site Eng.
Nestlestores - Nissan Factory - El Ezzforporcelain -NahdetMisrpress - El Ahly
Gymnesticcovered hall - West Cairo powerplant - MerlinGerin (EMG) All Steel StructureProjects
Site Engineer: reviewed drawings, directing subcontractors during execution, coordinated the work between different activities
Project Manager: promoted to project manager reviewing time schedule compliance with work progress, review of the procurement process and materials required

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في Banha University - Shoubra Branch
  • مايو 1989

Bachelor of Science of Engineering Civil Engineering Branch Grade Excellent in Project which was Railway with distance of 600 km from Cairo to Hammam City going through Ancient Areas which needed special design

Specialties & Skills

Management Practices
Goal Orientation
Team Motivator
Quality Management
Analytic Thinking
CONSULTING
MATERIALS MANAGEMENT
MICROSOFT WORKS
QUALITY CONTROL
APPROACH
CUSTOMER RELATIONS
DIRECTING

اللغات

العربية
متمرّس
الانجليزية
متمرّس

التدريب و الشهادات

Geo-technical Engineering (تدريب)
معهد التدريب:
EPIC - Ontario - Canada
تاريخ الدورة:
April 2004
المدة:
45 ساعة
Ontario Building Code (تدريب)
معهد التدريب:
George Brown College - Ontario - Canada
تاريخ الدورة:
July 2004
المدة:
45 ساعة
Auto Cad (تدريب)
معهد التدريب:
AMAC (Al Ahram)
تاريخ الدورة:
October 2002
المدة:
45 ساعة
Municipal Engineering (تدريب)
معهد التدريب:
EPIC in Canada Ontario
تاريخ الدورة:
January 2004
المدة:
40 ساعة
Primavera (تدريب)
معهد التدريب:
AMAC (Al Ahram)
تاريخ الدورة:
May 2002
المدة:
45 ساعة

الهوايات

  • Applying Codes to actual projects
    Developed the data entry system and the Quality system, for easier follow up and compliance with the ISO System, where all the detailed activities and the different departments are included and connected for better professional communication