Accomplished project manager with over 13 years of experience in energy field projects with proven success and contribution in many Extra High Voltage turn key substations. Widely exposed to clients in gulf area (KSA, UAE and Qatar) with major achievements at market leading EPC multinationals like General Electric, Alstom, Siemens and Al Fanar. Deep domain expertise in Project management, product management, construction and sales.
COC Engineer (for MV Substations and MV GIS/Switchgear)
Working as Product Project Manager and design coordinator for tendering as well as execution of different Projects for local utilities as well as private customers │ expertise in Siemens MV Switchgears (8DA10, 8DB10, NXPlus C, NXAir) │ studying tender documents/SOW and propose competitive solution and tender risk analysis │ develop technical and commercial proposal for MV switchgear and generate BOQ for external material │ Follow of MR-material Requisition, TBA- Technical Bid Evaluation, Drawing Review and approvals, Internal Procedures, Method Statements, etc.
Contributed in execution of:
•Al Masdar City Development (5 new 22/0.4KV Substations distributed in Masdar City) (37M AED)
•Two New Mobile Package Unit Substations at Corniche 33/11KV S/Sn (10M AED)
•Two New Mobile Package Unit Substations at Al Markaz Project. (14M AED)
Contributed in Technical and financial proposal of (Tender):
•RAK White Cement Factory Upgradation, UAE (RAK White Cement Specs).
•Construction of multipurpose complex
for Extension of 380/110/13.8kV KMT Substation - Jeddah
Development of site management plan in line with overall project time line │ Responsible for verification of all equipment’s and site fronts for equipment installations │ Coordination for internal and external resources, suppliers, agencies, with SEC engineers for site execution, testing-commissioning witness activities │ resources optimization for cost reduction │ raise NCRs and follow for correction │ maintaining HSE and quality during execution and testing │ as built documentation and punch list clearance.
Key Achievements
•Study, Plan and supervise working under life conditions to achieve replacement of substation complete auxiliary system (Aux Transformer, AC DB, DC DB, HVAC) with minimal interruption to substation major systems.
•Nearly 30, 000 Man-hours (work under life conditions) with zero accidents
Sr. Project Engineer for 380/110/13.8kV new Kandarah Substation - Jeddah (495M SAR)
Preparation of project master time schedule with planning engineer and monthly update it │ raise request for quotation for all project equipment and coordinate between procurement department and engineering for technical evaluation and purchase orders issuance │ coordination with various stakeholders till completion of project design phase │ follow for equipment deliveries and clear any material related non-conformity │ coordinate for site mobilization and setup │ follow for punch list clearance and successful energization and spare parts handing over in client stores │ coordinate for sending client representatives for training at vendors’ according to contract │ support in monthly project invoicing and budget update.
Key Achievements
•Played important role in completion of first pilot project (New Kandarah) in SEC-WOA 380kV network using one-and-half 380kV bus bar configuration.
•On time energization for Al Kandarah substation with only two snag points.
Project Engineer for Al Misfalah 110/13.8kV Substation - Makkah (77M SAR) &Extension of Al Shafa 110/13.8kV outdoor Substation - Taief (17 M SAR)
Key Achievements:
•Contributed in completion of one of the most complicated projects in SEC-WR (Al Misfalah) where the substation located in 4th &5th floor of multi-story industrial building constructed by Bin Laden to serve Haram towers chillers. Including coordination for out-of-the-box solution to shift the power transformers to 5th floor.
for Switchgear primary and secondary)
Key Achievements
•Support in Optimization of standard control schemes to achieve cost and size reduction.
for Al
.