محمد Sayyaf, mechanical engineer

محمد Sayyaf

mechanical engineer

PORR QATAR CONSTRUCTION

البلد
الإمارات العربية المتحدة - دبي
التعليم
بكالوريوس, Mechanical Engineering
الخبرات
2 years, 11 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :2 years, 11 أشهر

mechanical engineer في PORR QATAR CONSTRUCTION
  • قطر - الدوحة
  • سبتمبر 2018 إلى مايو 2019

• Read the drawing, material submittals, method of statement and take off for material as per
the drawing.
• Check the work accessibility.
• Pre task briefing to worker and foreman.
• Explain the foreman updated drawing, work plan and work sequence of work as per the site
superintendent advice.
• Arrange the material and manpower as per the plan requirement.
• To ensure the work completion as per the plan
• Coordination with the technical team to resolve the site technical issue
• Daily TQR checking, planning and progress update
• Raise IRWs and attend QC inspection to obtain the approval from consultant
• Keep the record inspection status, duct order and delivery details and drawing update
• Witnessing Water and Air Balancing activities, inspection with TAB team Third party
commissioning team (AJB) & with Site Consultant (AECOM)
• Prepare and Raise IRW on BIM 360 software for start up’s, Pre-commissioning and
commissioning activities
• Coordinate with all site commissioning team, TAB team, and Site Construction team for
smooth progress of T&C activities
• Prepare Daily tracker and week look ahead program and submit to Commissioning manager
and also attend meeting with commissioning team.

mechanical engineer في PORR QATAR CONSTRUCTION
  • قطر - الدوحة
  • سبتمبر 2018 إلى مايو 2019

• Read the drawing, material submittals, method of statement and take off for material as per
the drawing.
• Check the work accessibility.
• Pre task briefing to worker and foreman.
• Explain the foreman updated drawing, work plan and work sequence of work as per the site
superintendent advice.
• Arrange the material and manpower as per the plan requirement.
• To ensure the work completion as per the plan
• Coordination with the technical team to resolve the site technical issue
• Daily TQR checking, planning and progress update
• Raise IRWs and attend QC inspection to obtain the approval from consultant
• Keep the record inspection status, duct order and delivery details and drawing update
• Witnessing Water and Air Balancing activities, inspection with TAB team Third party
commissioning team (AJB) & with Site Consultant (AECOM)
• Prepare and Raise IRW on BIM 360 software for start up’s, Pre-commissioning and
commissioning activities
• Coordinate with all site commissioning team, TAB team, and Site Construction team for
smooth progress of T&C activities
• Prepare Daily tracker and week look ahead program and submit to Commissioning manager
and also attend meeting with commissioning team.

mechanical engineer في qatar building engineering company
  • قطر - الدوحة
  • أغسطس 2017 إلى يوليو 2018

• Coordinate all the MEP activities according to the progress of civil works
• Arrange site walk with all MEP contractors/Civil team/Management to avoid clashes
• Make daily report & planning for schedule works/ arrange site materials and report to senior
mechanical engineer.
• Coordinate/ follow up with site supervisors & foremen for all works daily basis.
• Monitor and coordinate the work of the sub-contractor.
• Make As-built as per site condition along with the help of a draftsman

mechanical engineer في jobby engineers
  • الهند - بنغالورو
  • يونيو 2016 إلى يوليو 2017

• Responsible of Plan, Organize, Execution of piping fabrication and erection
Works
• Allocation of material, manpower and equipment for daily work activities
• Checking pipe fit up and pipe support as per isometric drawings.
• Raising MTO(s) for all materials required to additional materials for piping
Erection.
• Coordination of different site supervisors assigned to the project.
• Monitor and coordinate the work of the sub-contractor.
• Ensure the compliance with schedule, quality and safety of completion of works.
• Assume responsibility for direct communication with the client during the project
implementation and to final delivery.
• Help supervisors to solve problems and conflicts on site, Plan and monitor
Weekly team work.

الخلفية التعليمية

بكالوريوس, Mechanical Engineering
  • في Visvesvaraya Technological University,
  • يونيو 2016

Specialties & Skills

Logistics
Shop Drawing
AutoCAD
Site Engineering
autocadd
shop drawing
logistics
procurement
construction
science
numerical ability
versatile
maintenance engineering
teamwork
ms project
communication
materials
planning
flexible
engineering

اللغات

الانجليزية
متمرّس
الهندية
متمرّس
الأوردو
متمرّس
الكانادا
متوسط
الملايام
مبتدئ