mohamed Siddiq, Engineer

mohamed Siddiq

Engineer

Babcock Borsig Service

Location
Kuwait - Al Jahra
Education
Bachelor's degree, Mechanical Engineering
Experience
5 years, 1 Months

Share My Profile

Block User


Work Experience

Total years of experience :5 years, 1 Months

Engineer at Babcock Borsig Service
  • Kuwait
  • October 2012 to October 2017

Piping engineer:
 Review ISO and P&ID drawings for execution.
 Having knowledge on monitoring of progress, cost and controlling of project budget
 Knowledge in Bill of Quantity and Estimation.
 Execution of Piping Fabrication, Erection as per Drawings and Standards.
 Erection of equipments as per Drawing and site conditions.
 Review of daily progress and prepare action plan removing backlogs.
 Preparation of Daily / Weekly / Monthly reports.
 Coordination with Clients and site personnel.
 Co ordination with Contractor and Client for any technical issues
 Co ordination with QC personal for stage wise inspection as per ITP
 Preparation of Piping Hydro Test package for the piping system battery limits
 Preparation of punch list.
 Executing Hydro Test, Pneumatic Testing for piping & RF pads
 Preparation of AS BUILT drawing.

Equipment installation and maintenance engineer:

 Installation and commissioning of vertical turbine pumps, strainer and valves.
 Installation and commissioning of 16 nos of Travelling Band Screen and coarse bar screen supplied by M/s.Geiger.
 Installation and commissioning 2 nos of curved bar screen and mobile cleaner supplied by M/s.Geiger .

 Maintenance of Heat Exchangers and Condensers.
 Overhauling of regenerative feed heaters
 Overhauling of Main steam stop valves(MSV) and Control valves(MCV).
 Maintenance of various valves such as butterfly valve, ball valve and relief valves.
 Overhauling activities of sea water intake pumps, Distillation water intake pumps, travelling band screens, Auxiliary pumps, Discharge valves, curved bar screens, Bar screens and stoplogs.
 Maintenance of main fuel oil pumps and lifting station pumps and blowers and its auxiliaries.
 Overhauling works of Hydraulic and Electrical Actuator.

 Checking of specifications, DBR’s, P&ID’s, layouts, GA drawings, vendor drawings etc.,
 Rising of indents, checking of offers, comparison & technical evaluation of bids.
 Preparation of Billing schedules & billing to client.
 Identifying & resolving the short comings in design, drawings & materials well in advance.
 Approval of vendor’s billing schedules & certification of Bills.
 Co-ordination with inter department, vendor, consultants & project sites.
 Expediting timely releasing of drawings & supplying of materials at project site in time.

 Review of Basic & Detailed Engineering of lay out design and drawings pertaining to BTG Equipment for approval
 Review of technical tender documents submitted by bidders for BOP systems.
 Preparation of contract document for BOP Systems for awarding the contract.

 Experience in inspection of BTG equipment’s performance tests conducted at Harbin Power Engineering, China and BOP equipments in India.
 Detailed study and analysis of Erection schedule with respect to BTG supply schedule
 Project planning, scheduling, contract finalization, execution, monitoring, coordination and timely completion of project.
 Technical analysis of various systems like NDCT Vs IDCT, Dry bottom Vs Wet Bottom etc., with respect to cost effective and also ease of operation
 Installation and alignment work of Blowers.
 Interpretation of key Plan, P&ID, GAD’s and Isometric drawings and delivering it for fabrication to the sub contractors
 Handled Fabrication of Steel structures to the tune of 20, 000 MT.
 Fit-up and dimensional check inspection of the conveyor Galleries of Material handling system with special emphasis to quality and accuracy.
 Responsible for Fabrication of LP Piping.
 Conducting daily and weekly meeting with contractors, site engineers.

 Erection of Junction towers and conveyor galleries and respective auxiliary pipings of Material handling system.
 Responsible for Erection and Alignment of LP Piping and its Supports.

 Handled Erection work (FRP portals, Internal fills, distribution pipes, spray nozzle, motor, gear box, fan assembly and its alignment, cooling tower related pipe line) for Cooling tower

Education

Bachelor's degree, Mechanical Engineering
  • at Srisairam Engineering college
  • May 2008

Specialties & Skills

Design Review
Global Manufacturing
Pump Stations
Water Management
Undergone Operation and Maintenance training of 600MW thermal power plant at CHD corporation, Guigan

Languages

Tamil
Expert
English
Expert
Hindi
Intermediate

Memberships

kuwait society of engineers
  • Engineer role
  • November 2018