Mohamed Sulthan Raja, Project Engineer

Mohamed Sulthan Raja

Project Engineer

Saudi Electricity Company (SEC)

البلد
المملكة العربية السعودية - الخبر
التعليم
دبلوم, Industrial Safety
الخبرات
15 years, 11 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :15 years, 11 أشهر

Project Engineer في Saudi Electricity Company (SEC)
  • المملكة العربية السعودية
  • أشغل هذه الوظيفة منذ يوليو 2011

Saudi Electricity Company (SEC), involved in the Power
Generation, EHV & HV Substation, Transmission and Distribution. Saudi
Technologists Consulting Engineers (SATECH) providing consulting services for

Project Engineer في M/s Neelam Power Plan
  • الهند
  • يونيو 2010 إلى يونيو 2011
Electrical Engineer في M/s Jagadamba Power Ltd
  • الهند
  • يونيو 2008 إلى يونيو 2010
  • إلى

Projects Handled
* Hajr Power Generation Project - QIPP (380 kV)
Saudi Electricity Company Substation

  • إلى

752 MVA Power Transformer
* Saudi Aramco Berri Gas Separation Plant
* 115kV Power Supply to Booster Gas Compression Station - 1
(ARAMCO)
* 115kV Power Supply to Satellite GOSP Mazalij S/s (ARAMCO)
* Southern Area Oil Operation (SAOO) Power Supply Reliability
Improvement Project
(Aindar, Hawiyah, Shedgum & Uthmaniyah Areas)
* Al Nada & Al Mubarakiyah 115 kV S/s
* Integration of Al Uqair A & B 115/13.8 kV S/s
* Construction of Support Industries 115/33 kV S/s
* Retrofitting of Protection & Modification for Umm Al Ara’d & Urayirah S/s
* Construction of Abqaiq # 3 115 kV S/s
* Neelam Power Plant - Maharastra, India
* Jagadamba Power and Alloys - Chattisgarh, India
132 kV Power Plant Substation
Certificate course
* OSHA 30 Hrs in General Industry Safety Training
* 35 PDU’s Project Management Professional (PMP) Training
* Primavera p6
* MS Project
* Auto CADD
* Indian Railways -Transmission and Distribution in Southern Region
Testing and Commissioning
* 380 kV GIS, Cable Hipot Test
* Tan Delta
* Power Transformer
* SF6 Circuit Breakers
* Material Inspection
* Witnessing for FAT/SAT
Responsibilities
* Construction Management of electrical activities for Substation and
Power Plant projects, Erection & Commissioning of Indoor GIS
&outdoor Substations, Power Cables, Power Transformers upto 380 kV.
* Conduct Kickoff Meeting (KOM), Base Design review Meeting
(BDRM) presentation of project scope
* As per PMO requirements, Collecting Risk Assessments from all NG
internal departments and preparing control plan.
* Project follow up & Updating outages through Nebras SAP - PM system
* Preparation & Processing of LOA, STW, HLW requests and follow up
with AMD, PCC & ARAMCO for the approval
* Review of Change Order request, QA/QC plan, Loss Prevention
Program, Method of Statement, Job Safety Analysis
* Coordination with Client, Contractor and Sub Contractor for
Engineering, Material and manpower.
* Review of Planning schedules, Drawings, Calculations, RFI for materials
delivery and works.
* Taking proper safety precautions, Issuing Site Instructions, Near Miss
Incident and supervise the site construction as per standards and IFC
drawings.
* Updating Group Leader with Daily, Bi Weekly, Monthly progress
reports and conducting Bi Weekly meeting with contractors for progress.
* Implementing PMP standards in construction, reviewing the
deliverables. Supporting PMO audits.
* Experienced in EHV substation, Cable Projects execution with good
technical knowledge of systems, dealing with multi-disciplinary team.
* Coordinating with inter related Mechanical, Instrumentation departments
for the progress. Reviewing of P&ID and Isometric drawings
* Responsible for verifying efficient utilization of manpower and
equipment.
* Erection & Commissioning of 380, 115, 13.8 kV Power Transformers,
GIS, PT’s & CT’s.
* Reviewing the Base design, Detailed design, and Preparing Markup
Drawings as per site conditions.
* Preparation of method of statement and follow up of Cable tray/ Ladder
routing, High Voltage Cable pulling and Cable termination to ensure
proper installation at site.
* Knowledge of design and calculation of electrical installations like load
flow, voltage drop, fill ratio, short circuit, motor starting, Earthing,
Lightning, cable sizing, protection coordination.
* Review of all technical documents required for electrical works at site.
* Preparations of BOQ, Conducting meeting with Contractors and
submitting reports to Project Manager.
* Responsible for Preparing Baseline schedules of a Project.
* Responsible for verifying detailed schedule, Monitor and update the
actual progress.
* Verifying 3 weeks look ahead schedule, manpower histogram &
S - curve.
* Having work experience with Primavera p6, MS Project, Auto Cadd,
Microstation.
* Preparations of Punch/Snag list and verifying the completion, on daily
basis.
Activities and Honors
* Witnessing Factory Acceptance Testing (FAT) of Power Cables at M/s Riyadh
Cable Factory, KSA
* Witnessing Factory Acceptance Testing (FAT) of Protection & Control Panels,
Communication Panels at M/s ABB and M/s Alfanar Factory, Riaydh, KSA
* Witnessing Factory Acceptance Testing (FAT) and New Tower Design batch of

الخلفية التعليمية

دبلوم, Industrial Safety
  • في Annamalai University
  • ديسمبر 2008

with First Class

بكالوريوس, Electrical and Electronics Engineering
  • في Anna University
  • أبريل 2008

First Class

Specialties & Skills

Planning
Project Management
Electrical Engineering
Power Plants
Power Plant Operations
BUSINESS INTELLIGENCE
CABLING
CONSULTING
CUSTOMER RELATIONS
DELIVERY
LANGUAGES
LOSS PREVENTION
MATERIALS MANAGEMENT

اللغات

العربية
متمرّس
الانجليزية
متمرّس
الهندية
متمرّس