BIM manager
Shaker Consultancy Group
Total years of experience :13 years, 5 Months
As a BIM manager, oversees BIM engineers and coordinators, working directly with the project team in developing and updating a 3D model throughout the project's life cycle. When converting building specifications to a 3D model, detecting and identifying any challenges before they become an issue and participating in problem solving for the projects through the use of BIM applications.
Make sure all elements of the model are in accordance with the BIM project execution plan, including project set-up and development. Communicate with various departments and managers on how to implement any changes or customization, providing leadership and oversight for the flow of data with designers, contractors, and various other personnel. Responsible for project set-up and technical administration, as well as for performing project work
As a BIM manager, oversees BIM engineers and coordinators, working directly with the project team in developing and updating a 3D model throughout the project's life cycle. When converting building specifications to a 3D model, detecting and identifying any challenges before they become an issue and participating in problem solving for the projects through the use of BIM applications.
Make sure all elements of the model are in accordance with the BIM project execution plan, including project set-up and development. Communicate with various departments and managers on how to implement any changes or customization, providing leadership and oversight for the flow of data with designers, contractors, and various other personnel. Responsible for project set-up and technical administration, as well as for performing project work
❖ Kemet Corp. (Autodesk main distributor): From 1/4/2009 - till now
Job Title: BIM MEP Team leader
Address: 39 Beirut Street, MasrElgdida, Cairo, Egypt
Web Page Address: http://www.Kemet.com.eg
Job description: • BIM modeling team leader who is responsible for a team creates BIM models for coordination and Q.S.
• Member of support team for Autodesk BIM solutions.
• Conducting best solution for workflow and implementation.
• Conducting training and support for wide range of BIM software.
• Certified AUTODESK Revit MEP Pro 2015
• Certified AUTODESK Revit MEP Instructor (ACT)
For Different Level (Basic & Advanced &Case Study)
• Certified Navisworks Instructor
For Different Level (Basic &Advanced &Case Study)
• Certified AutoCAD Plant 3D Instructor
For Different Level (Basic&Advanced&Case Study)
• Attended Autodesk University (AU 2014) Las Vegas, USA.
Projects
Projects participate at Kemet - BIM Projects:
• Lusail City (CP07B):
Work as BIM Manger
Prooject Management: PARSONS
Consultant: Dorsch Qatar
Contractor: QD-SBG
Designer: Dar Al-Handasah
Location: Doha-Qatar
*Leading the team responsible for: - Making MEP Coordination by providing Clash-Free BIM models for MEP services & achieve highest accessibility and maintenance and create shop drawings.
• Service Building (Harram Extension):
Work as MEP Project Manger
Customer: ABCD (Bin Ladin Group)
Location: Makah-KSA
*Leading the team responsible for: - Making MEP Coordination by providing Clash-Free BIM models for MEP services & achieve highest accessibility and maintenance and create shop drawings through 2D design drawings.
• Louvre Abu Dhabi museum:
Work as MEP coordination team leader
Owner: TDIC
Consultant: Buro Happold
Main contractor: Arabtec, Sanjose & Oger Abu Dhabi.
Sub contractor: Drake & Skull.
Location: Abu Dhabi-UAE
*Leading a team responsible for: - Making MEP Coordination by providing Clash-Free BIM models for MEP services &achieves highest accessibility and following the site requests (supports, builderswork, coordinated sections .etc)
• KAPSARC (King Abdullah Petroleum Studies and Research Center): Customer: o Zaha Hadid -Architects
o Aramco (Owner)
o ARUP (MEP consultant)
o Drake & Scull (MEP contractor)
Location: Riyadh-KSA
Our role was to make MEP Coordination by providing Clash-Free BIM models for MEP services & achieve highest accessibility and maintenance and create shop drawings.
• Shamiya Project (Harram Extension): Customer: ABCD (Bin Ladin Group)
Location: Makah-KSA
Our role was to create BIM coordinated model from design 2D drawings for the basement and the three levels above in 2 months before Hij season.
• IMC (Increasing Mataf Capacity): Customer: PBAD (Bin Ladin Group)
Location: Makah-KSA
Our role was to create BIM coordinated model from 2D design drawings to the New Mataf design. Duration of the project 3 years (in progress)
• PBAD (Bin Ladin Group) BIM Implementation: Location: Jeddah-KSA
Our role was to implement Autodesk BIM software (Revit, Navis, .) into the company by giving training courses to the engineers and draftsmen and help them in a pilot project until going on through Mataaf project which will be done by BIM.
• Credit Agricole Bank HQ - Cairo: Customer: Orascom - contractor
ECG - consultant
Location: Cairo - Egypt
Our role was to create BIM model, make construction simulation, quantity take-off, cost estimate and MEP coordination.
• Zuher Fayez BIM Implementation: Worked with them for 1 year to implement BIM environment through learning their stuff Autodesk products (Revit, Navisworks, ..)
Worked with them to produce their first project with Revit (Haramain High Speed Rail - Makkah Station)
• Cairo Festival City (CFC) with ECG using AutoCAD MEP 2010: Customer: ECG consultancy
Total built up area is 200, 000 sq.m.
Disciplines: Structure, Architecture, and MEP.
Scope: Manage and build BIM models for CFC and use models to generate design drawings, quantities, and coordinated models.
• Giza Systems Buildings: Customer: Giza Systems for IT solutions
Total built up area is 12, 000 sq.m.
Disciplines: Structure, Architecture, and MEP.
Scope: Manage BIM team build and coordinate BIM models
• Petrojet Office Buildings: Customer: Petrojet Petroleum Company
Total built up area is 78, 000 sq.m.
Disciplines: Structure, Architecture, and MEP.
Scope: Manage BIM team to build and coordinate BIM models
• Aerotel Hotel - Cairo: Customer: Al Marasem (Bin Ladin Egypt)
Total built up area is 32, 000 sq.m.
Disciplines: Structure, Architecture, and MEP.
Scope: Manage BIM team to build and coordinate BIM models and generate clash reports from Navisworks
• Mansheit Nasr Hospital: Customer: Arab Contractors
Desplines: Structure, Architecture, and MEP.
Scope: Manage BIM team to build and coordinate BIM models and generate clash reports from Navisworks
• Bab El sharia underground metro station: Customer: Venci
Desplines: Structure, Architecture, and MEP.
Scope: Manage BIM team to build and coordinate BIM models and generate clash reports from Navisworks
❖ EDC (Egyption Drilling Company): From 3/2008 to 2/2009
Job Title: Onsite Mechanical Maintenance engineer
Address: Km 17.5, Cairo Suez Desert Rd
Web Page Address: http://www.egyptian-drilling.com
❖ El Sewedy for Cables: From 2/2007 to 3/2008
Job Title: Production Shift Engineer
Address: 10th of Ramadan City Industrial Zone A-3
Web Page Address: http://www.elsewedy.com