Mohamed Yehia Abdien, Freelancer

Mohamed Yehia Abdien

Freelancer

Private

Location
United Arab Emirates
Education
Bachelor's degree, Construction Management
Experience
28 years, 1 Months

Share My Profile

Block User


Work Experience

Total years of experience :28 years, 1 Months

Freelancer at Private
  • Egypt - Cairo
  • My current job since March 2021

As per my attached CV

Director at Concord for Engineering & Contracting
  • Egypt
  • May 2015 to February 2019

Reporting Line: CEO & Bored Members Direct reporting: 14 Company resource: 2000+
•Company Representative and Project Manager for the Works awarded to Concord in Ismaila Road Tunnels within the Consortium of Petrojet - Concord to Execute 2 road tunnels with slurry TBM Dia. 13.01 M.
•Study tenders & bidding documents to get the maximum optimization for the Project cost.
•Working with local & international Subcontractors, lead all contract negotiation for newly awarded contracts to all Subcontractor including planning, Cost & technical aspects.
•Optimizing team works to improve and modify project schedule, quality and monitor them to ensure being within budget and meeting project milestones.
•Supervise Teams to ensure the quality of works including all TBM activities starting from Machine assembly then operation activities such as injection, Slurry Treatment and Power supply, Pipe & Segment feeding.
•Verifying details with all Head Sectors including Finance, Administration and Technical to ensure regular cash flow, improving Company P & L, Compliance with labour law Projects schedules, quality and millstones.
•Initiating company policy that matches HQ Policy & applied labour law in the region complying with the project type and needs to be applied within the project.
•Leading all Technical Discussion for Soil Freezing, methods, proto type and modelling to Execute 4 Cross Passage, Diameter 5 m in Between the 2 main Tunnels Under more than 5.5 bars at a depth of almost 70m.
•Maintaining relationship with client & Consultant at all stages starting from tendering, pricing stage, execution period till Delivery stage.
Achievements:
•Leading the first Egyptian Team to execute Tunnelling works ranked 3 times as No. 1 worldwide at 13m Dia. within the execution of Ismailia Tunnels.
•Identified points of extra cost and obtaining new ideas to minimize the cost & losses ensuring the required quality.
•Fine selection for resources (manpower and equipment’s) to ensure the plan and quality of the executed works respecting the milestones till the project delivery.
•Effectively revised all contract, subcontractor agreements to meet the exact milestones.
•Manoeuvring over initial budget applied on tender stage, Adding more cost centres to improve and deduct the maximum on cost.

Regional General Manager at TAQA Arabi
  • Egypt
  • February 2010 to February 2015

Reporting Line: CEO; Direct reporting: 11; Company resource: 1500+

•Delegating as

Regional General Manager at Alkan CIT
  • Burkina Faso - Ouagadougou
  • May 2008 to February 2009

West Africa Region" to ensure seamless execution of contract.
•Conducted cost analysis and monitored project progress.
•Attend technical & commercial meetings with the client’s senior management and Alkan CIT Board.
•Tender study, bidding and contract negotiation for newly awarded contracts.
•Follow up on the procurement process for all projects using all the available materials and manpower to match the execution peaks within the region.
•Study, Apply and Implement labour work law related to the region during execution of company projects.
•Create company policy for the region to ensure compliance with HQ main policy and labour work law within the region of works.

General Manager at Alkan Burkina SA
  • February 2005 to May 2008

and Official Representative for Alkan Burkina SA. Reporting to the client & Alkan Group HQ.
•Supervise and manage teams for executing projects in GSM field “Guyed & Self Support Towers”.
•Identify new areas of business opportunities for Alkan Group in West Africa zone.
•Establish local company in adherence to Govt. procedure in West Africa.
•Prepare budgets, Cost analysis then to follow it up ensuring positive cash flow.
•Develop training programs for local subcontractor to match the Group quality plan & safety procedures
•Monitor local & expatriate teams to execute current contracts.
•Follow up on logistic & materials procurement process.
•Follow up on administrative process for hiring and taxation in West Africa.

Achievements:
•Study & Identify items to be executed by the company team members and other items to be subcontracted to improve Profit & loss for the initiated local Company.
•Minimize expiate teams and replace it by local teams after conducting effective training to meet the international skills which has a great impact on cost deduction improving the profit of the company.
•Maintain professional relationship with the client which leads to increasing the annual target by 13 times within 3 years.

Assistant Area Manager at Vinci Construction Grands Projets
  • France
  • December 2003 to February 2005

LinkedIn: https://www.linkedin.com/in/mohamed-yehia-a721b528/


CANDIDATE: Seeking Senior Managerial positions CEO, COO, General Manager, Country Manager, Branch Manager, Project Director, Project Manager, Operation Head, Traffic Tunnel for Cars & Metro, Rail Projects - Engineering /Construction Industries. In a progressive and vibrant organization by utilizing management skills to achieve project objectives and enhance company profitability.

Proven credentials in executing different construction works like Greater Cairo Metro line 2, Phase A, B & C, AlAzhar Road Tunnel, Ismailia Road Tunnels under Suez Canal with its Cross passages in Ismailia & Portsaid, LPG &Natural Gas infrastructure Networks In UAE & Qatar, Telecommunication GSM Network Construction, Installation &expansion in West Africa, Sewage Treatment Facilities Contract 16 in Egypt, Water Treatment Reservoir& pump stations in Libya, and Industrial Buildings In Egypt.
Excels in Engineering, Management & Supervision of prestigious projects (worth US$ 2+ billion) with 2500+ personnel in all Construction intervals from the start up till the completion stage including all Civil works phase from earthworks till finishing and even for operation and maintenance including planning and monitoring for P& L.

Procurement Manager
  • Libya
  • August 2002 to July 2003

VCGP Libya

•Registered the company official branch at Govt. Authorities and inspected new materials for the project.
•Coordinated with the client, Technical and Quality Control dept. to execute work as per specification.
•Checked required quantity for each material, technical files and acquired approvals.
•Collected related quotation and check prices for the requested materials and equipment’s.


Al-Nasr for Building and Construction Co. (EGYCO), Egypt

Assistance at Vinci Construction Grands Projets
  • Egypt
  • January 2001 to August 2002

new opportunities for VCGP and prepared company profile for submission within pre-qualification stage.
•Surveyed market & coordinated with potential local companies for creating Joint Venture agreements.
•Updated senior management on all available & applied tenders within the market.

Achievements:
•Successfully optimized manpower resources to ensure seamless project delivery.
•Identified items to be managed in house including other items to be subcontracted.
•Optimize subcontractor's numbers and field of activities to meet project plan and budget.
•Pivotal role in identifying new sources for fabrication.
•Effectively utilized alternative logistic to ensure effective cost reduction.

Assistant Works Manager at Vinci Construction Grands Projets
  • Egypt
  • June 1998 to December 2001

onsite activities of 11 Subcontractors working simultaneously.
•Identified new Subcontractors to apply for the subcontracting tenders within the project.
•Analyzed pre-qualification documents supplied by the potential and new

Shift Manager
  • June 1994 to June 1998

Reporting Line: Project Manager; Direct reporting: 18; Company resource: 2500+
Assistance Works Manager
El Azhar Road Tunnel Project

Site Engineer
  • November 1992 to June 1994

Reporting Line: Resident Engineer / Project Manager; Direct reporting: 5; Company resource: 1200

Education

Bachelor's degree, Construction Management
  • at American University
  • January 1998

in

Bachelor's degree, Civil Engineering
  • at Cairo University
  • January 1992

Graduation Project: Reinforcement Concrete Works. 84%

Specialties & Skills

MARKETING
REPORTS
SPECIFICATION
BUDGETING
CUSTOMER RELATIONS
DELIVERY
MICROSOFT WORKS
QUALITY
CASH FLOW

Languages

Arabic
Expert
English
Expert
French
Expert

Training and Certifications

TBM Design & Operation (Training)
Training Institute:
Herrenkncht
Date Attended:
December 2015
Duration:
350 hours