Resident Engineer
The Arab Contractors (Osman Ahmed Osman)
Total years of experience :32 years, 9 Months
- Follow-up Device of Water & Sewer Projects for Down Egypt Projects.
- Preparation of Egyptian Code in National Center for Research for Water Pump Stations.
- Lecturing at the Institute of Productive Training - Arab Contractors Company.
Abu Rawash - El-Lagoon Sludge Line, D.I. diameter 800mm
Abu Rawash Sewage Pump Station
Main Water Pipeline, 6th of October City, diameters 900mm &1000mm G.R.P. pipes.
Cairo Airport Project
Storm Water System, Long Park, and Water Tank
1) Gulf Suez Development Project:
a) Pressure pipeline ( Ductile pipes - Concrete pipes )
b) Water pressure pipeline, G.R.P various diameter.
c) Drainage Gravity Pipeline, G.R.P various diameter.
2) Pipeline Project, El-Katamia - Zahraa Nasr City pressure pipeline diameter 1000mm.
3) Contract 19 as follows :
Sludge Drain Construction, potable, service, water, grease network (Ductile Iron, pre-stressed & polyethylene pipes).
Construction of Otaco City, Nigeria, Drainage Network
a) P.V.C. Drainage Pipeline
b) Rain Water Drainage, concrete pipe in various diameter including Manholes.
1. Construction of Darb El-Aghwat Drainage Network in various diameters, V.C. Pipes.
2. Construction of El-Mokattam Water Pipeline Network, D.I. Pipes, diameters 600mm & 1000 mm.
3. Construction of El-Maasara Drainage Network, D.I. Pipes, gravity & pressure lines.
1. Construction of 7km-long Tanta - Mohalet Marhoum Road, El-Gharbia City.
2. Construction of 5km-long Abosenatya - El-Bagour Road, El-Menoufiya City.
3. Construction of 12km-long El-Arryesh - El-Shaykh Zaid pressure pipeline.
BA in civil engineering from Cairo University in 1991