Total Years of Experience: 16 Years, 5 Months
February 2013
To Present
Civil Engineer
at Saudi Diyar Consultants
Location :
Saudi Arabia - Riyadh
TADAWUL TOWER
43 floors, 200 m height state-of-the-art, world-class, intelligent, recognizable
And sustainable high rise tower for Tadawul real estate headquarters, containing creative and smart
Offices, high avail-ably data center, training facilities, supporting services and amenities.
Project located in King Abdullah Financial district KAFD with gross floor area 138, 834 m2.
-PROJECT MANAGEMENT: Mace International limited
- CLIENT : Tadawul Real Estate
- LEAD Consultant and Engineer : Nikken Sekkei Ltd, Japan.
- Compliance Consultant: Saudi Diyar Consultants.
- Contractor : SAMSUNG -CCE JV
Key Responsibilities:
- Analyzing documentation, detailed instructions, and drawings and evaluating results to choose the best solution as per project specifications and design.
- Inspecting and analyzing the proposed construction project and paying attention to detail and technical accuracy for excavation, dewatering, foundation work (raft-pile caps), piles head trimming and treatment, water proofing, super structural elements (slab-columns- beams-shear wall).
- Monitoring, managing and directing the assigned project resources to overcome “triple constraints”—project scope, time and cost. Approved submittale and quality control inspections instruction.
- Controlling the project life-cycle, pro-actively monitoring project schedule to enforce adherence to envisaged time-frames.
- Collecting metrics data (such as baseline, actual values for costs, schedule, work in progress, and work completed) and reports on project progress and other project specific information, to take curative actions in case of variance. -Establishing, developing stable and reliable business connections with general contractor, sub-contractors and other project team members to determine and optimize progress and plan future activities.
- Coordinating with the contractors and client, observing a policy of open communication to reduce risk
43 floors, 200 m height state-of-the-art, world-class, intelligent, recognizable
And sustainable high rise tower for Tadawul real estate headquarters, containing creative and smart
Offices, high avail-ably data center, training facilities, supporting services and amenities.
Project located in King Abdullah Financial district KAFD with gross floor area 138, 834 m2.
-PROJECT MANAGEMENT: Mace International limited
- CLIENT : Tadawul Real Estate
- LEAD Consultant and Engineer : Nikken Sekkei Ltd, Japan.
- Compliance Consultant: Saudi Diyar Consultants.
- Contractor : SAMSUNG -CCE JV
Key Responsibilities:
- Analyzing documentation, detailed instructions, and drawings and evaluating results to choose the best solution as per project specifications and design.
- Inspecting and analyzing the proposed construction project and paying attention to detail and technical accuracy for excavation, dewatering, foundation work (raft-pile caps), piles head trimming and treatment, water proofing, super structural elements (slab-columns- beams-shear wall).
- Monitoring, managing and directing the assigned project resources to overcome “triple constraints”—project scope, time and cost. Approved submittale and quality control inspections instruction.
- Controlling the project life-cycle, pro-actively monitoring project schedule to enforce adherence to envisaged time-frames.
- Collecting metrics data (such as baseline, actual values for costs, schedule, work in progress, and work completed) and reports on project progress and other project specific information, to take curative actions in case of variance. -Establishing, developing stable and reliable business connections with general contractor, sub-contractors and other project team members to determine and optimize progress and plan future activities.
- Coordinating with the contractors and client, observing a policy of open communication to reduce risk
February 2015
To Present
QA/QC Engineer
at Parsons(SAPL)
Location :
Saudi Arabia - Riyadh
Monitor quality status is 21 MOH projects (Medinah & Tabouk areas) through regular monthly reports enhance quality of projects by pointing out to possible ways of improvement & submit officially to MOH.
Regular site visits and audits for MOH projects showing current progress status and areas where corrective actions is needed.
Monthly Technical presentation to MOH Staff.
Evaluation of bidder’s quality management system with respect to their prequalification of similar projects, quality manuals and required quality team for each project through their organization chart.
Prequalification process for building’s developers.
Develop procedures manual for MOH supervision discipline.
Develop Field and Source Testing manual for related infrastructure activities in MOH projects.
Work with MOH engineers and supervision department to develop project standard quality plan and control process.
Evaluation of acceptance and rejection criteria for factories producing GRP, RC, VC and HDPE pipes before giving final recommendation to Client (MOH).
Pre-delivery inspection to quality process in factories delivering materials to be used in site varies from MEP work to concrete batching plants.
Regular site visits and audits for MOH projects showing current progress status and areas where corrective actions is needed.
Monthly Technical presentation to MOH Staff.
Evaluation of bidder’s quality management system with respect to their prequalification of similar projects, quality manuals and required quality team for each project through their organization chart.
Prequalification process for building’s developers.
Develop procedures manual for MOH supervision discipline.
Develop Field and Source Testing manual for related infrastructure activities in MOH projects.
Work with MOH engineers and supervision department to develop project standard quality plan and control process.
Evaluation of acceptance and rejection criteria for factories producing GRP, RC, VC and HDPE pipes before giving final recommendation to Client (MOH).
Pre-delivery inspection to quality process in factories delivering materials to be used in site varies from MEP work to concrete batching plants.
March 2012
To January 2013
Civil Engineer
at Saudi Diyar Cosultants
Location :
Saudi Arabia - Riyadh
Key Project to Credit:
●Layaly Compound, with 15, 000 m2 total area, consists of 56 villas (3 types), Gym (multi purpose) & driver's quarters
Each villa is 3 levels.
CLIENT : Cayan Real estate development & investment.
Designer : Saudi Diyar Consultants (SDC).
Key Responsibilities:
Analyzing documentation, detailed instructions, and drawings and evaluating results to choose the best solution as per project specifications and design.
Inspecting and analyzing the proposed construction project and paying attention to detail and technical accuracy for excavation, dewatering, foundation work, water proofing, super structural elements (slab-columns- beams-shear wall).
Monitoring, managing and directing the assigned project resources to overcome “triple constraints”—project scope, time and cost. Approved submittals and quality control inspections instruction.
Controlling the project life-cycle, pro-actively monitoring project schedule to enforce adherence to envisaged time-frames.
Collecting metrics data (such as baseline, actual values for costs, schedule, work in progress, and work completed) and reports on project progress and other project specific information, to take curative actions in case of variance.
Establishing, developing stable and reliable business connections with general contractor, sub-contractors and other project team members to determine and optimize progress and plan future activities.
Coordinating with the contractors and client, observing a policy of open communication to reduce risk significantly
●Layaly Compound, with 15, 000 m2 total area, consists of 56 villas (3 types), Gym (multi purpose) & driver's quarters
Each villa is 3 levels.
CLIENT : Cayan Real estate development & investment.
Designer : Saudi Diyar Consultants (SDC).
Key Responsibilities:
Analyzing documentation, detailed instructions, and drawings and evaluating results to choose the best solution as per project specifications and design.
Inspecting and analyzing the proposed construction project and paying attention to detail and technical accuracy for excavation, dewatering, foundation work, water proofing, super structural elements (slab-columns- beams-shear wall).
Monitoring, managing and directing the assigned project resources to overcome “triple constraints”—project scope, time and cost. Approved submittals and quality control inspections instruction.
Controlling the project life-cycle, pro-actively monitoring project schedule to enforce adherence to envisaged time-frames.
Collecting metrics data (such as baseline, actual values for costs, schedule, work in progress, and work completed) and reports on project progress and other project specific information, to take curative actions in case of variance.
Establishing, developing stable and reliable business connections with general contractor, sub-contractors and other project team members to determine and optimize progress and plan future activities.
Coordinating with the contractors and client, observing a policy of open communication to reduce risk significantly
August 2010
To February 2012
civil engineer
at Saudi Diyar Consultants
Location :
Saudi Arabia - Jeddah
Project: Lamar Towers Jeddah-Saudia Arabia
Description: The project encompasses 2 residential towers with
Heights of 70 (elv.+321.64 m) and 63 (elv.+292.66m)
Floor respectively, with 13 levels podium and 2 basement
Levels, with 12 levels of parking
.
Project cost: 2.5 billion SR
Project Manager: Turner
Contractors: Kaskatas Arabia LTD., ACC, Arabtec &Tarouk
Key responsibilities:
Supervising and performing inspections for all
Construction/Civil activities (reinforcement, formwork
, fresh/hardened concrete tests, curing, placing fresh
Concrete, embedments, waterproofing, FRP
Installation &finishing architectural concrete.
as per ACI specification for each activity
Description: The project encompasses 2 residential towers with
Heights of 70 (elv.+321.64 m) and 63 (elv.+292.66m)
Floor respectively, with 13 levels podium and 2 basement
Levels, with 12 levels of parking
.
Project cost: 2.5 billion SR
Project Manager: Turner
Contractors: Kaskatas Arabia LTD., ACC, Arabtec &Tarouk
Key responsibilities:
Supervising and performing inspections for all
Construction/Civil activities (reinforcement, formwork
, fresh/hardened concrete tests, curing, placing fresh
Concrete, embedments, waterproofing, FRP
Installation &finishing architectural concrete.
as per ACI specification for each activity
March 2008
To July 2010
site engineer
at arab contractor o.a.o &co.
Location :
Egypt - Cairo
Project; contract NO:5 (Helwan waste water treatment plant)
Helwan/Egypt
Description: Extension for waste water treatment plant to produce
550, 000 m3/day of treated water
Total cost 1 billion LE.
Main contractor: Arab Contractors O.A.O & CO. with its branches
Consultant Envirosivic & Dorch GMBH.
Key responsibilities
been responsible for construction and civil work for
-Drying beds area I and II with total area of 64 Feds.
-fence round area 2&3 about 3 kilometers length
-Landscapes for aeration tanks, chlorotion building&
Electrical transformer rooms
-pump stations for drying beds area 1&3
-rehabilitation of northern grait removal tank
-pipe lines connecting drying beds with thickener
Tanks.
-rehabilitation of drying beds area 1
Also as Q/C engineer for the previous work ..
Helwan/Egypt
Description: Extension for waste water treatment plant to produce
550, 000 m3/day of treated water
Total cost 1 billion LE.
Main contractor: Arab Contractors O.A.O & CO. with its branches
Consultant Envirosivic & Dorch GMBH.
Key responsibilities
been responsible for construction and civil work for
-Drying beds area I and II with total area of 64 Feds.
-fence round area 2&3 about 3 kilometers length
-Landscapes for aeration tanks, chlorotion building&
Electrical transformer rooms
-pump stations for drying beds area 1&3
-rehabilitation of northern grait removal tank
-pipe lines connecting drying beds with thickener
Tanks.
-rehabilitation of drying beds area 1
Also as Q/C engineer for the previous work ..
October 2007
To February 2008
site enineer
at Future contractors
Location :
Egypt - Cairo
specialized in construction of gas stations been responsible for civil work of gas station in 10th of Ramadan city