Mohamed Aly Agha, Electrical Superintendent

Mohamed Aly Agha

Electrical Superintendent

Maire Tecnimont

Lieu
Egypte - Alexandrie
Éducation
Baccalauréat, BA of Electrical Engineering
Expérience
27 years, 5 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :27 years, 5 Mois

Electrical Superintendent à Maire Tecnimont
  • Egypte - Assouan
  • Je travaille ici depuis novembre 2017

As Electrical superintendent for (New Ammonia & Urea Plant)
Responsible for Electrical activities related to the construction & pre-commissioning phase.

Electrical Section Engineer à Consolidated Contractors Company - Saudi Arabia
  • Arabie Saoudite - Jizan
  • juin 2015 à avril 2017

As E & I Section Engineer for JRUP (Jizan Refinery Utilities Project.).
Responsible for Electrical activities related to the construction & pre-commissioning phase

Electrical Section Engineer à Consolidated Contractors Company - Saudi Arabia
  • Arabie Saoudite - AlJubail
  • décembre 2013 à mai 2015

As E & I Section Engineer for Wasit Gas Project (Inlet Area, Flare Gas
Recovery Unit)
Responsible for Electrical activities related the construction & pre-commissioning phase.

E & I Section Engineer à Consolidated Contractors Company
  • Papouasie-Nouvelle-Guinée
  • avril 2012 à septembre 2013

As E & I Section Engineer for PNGLNG Plant Project Responsible for Electrical activities related to the construction, pre commissioning and commissioning phases at utility and offsite facilities, which includes.
7 Gas turbine generators.11.474 MW at 11 KV
3 Emergency diesel generators
Step up 33/11 KV Transforms
Step down 33/11KV, 33/6.6KV and 6.6KV/420V
Main Substation (Main Incomers)
7 Substations
Feeders to the process area substations

Water treatment plant
Cryogenic plant
Flare and lock out drum areas.

Senior Electrical & Instrumentation Engineer à ENPPI (Engineering for the Petroleum and Process Industries)
  • Egypte - Alexandrie
  • novembre 2011 à avril 2012

As Senior E & I Engineer for (Maximization of C2 & C3 (Ethan & Propane) From West Desert Gas Fields Project & New Feed For 300MMSCFD (300 Million Meter Specific Cubic Feed per Day) Process Area).
Responsible for Electrical & Instrumentation pre commissioning and commissioning activities of Refrigeration Plant (consists of 3 compressors to produce C2, C3) in addition Gas Turbine feeding the national gas grid with 300MMSCFD (300 Million Meter Specific Cubic Feet per Day).

Electrical Section Engineer à Consolidated Contractors Company
  • Yémen - Aden
  • août 2010 à mars 2011

As Electrical Section Head for Aden Hotel Renovation Project.
Responsible for Electrical activities related the construction phase.

E & I Site Manager à Carlo Gavazzi Egypt
  • Egypte - Le Caire
  • mai 2009 à mai 2010

As E & I Site Manager for El Tebbin Thermal Power Plant Project (2 x 350 MW Gas/Oil Fired Units.
Responsible for Electrical & Instrument activities related the construction phase.

Electrical Section Engineer à Consolidated Contractors Company - Saudi Arabia
  • Arabie Saoudite - AlJubail
  • août 2006 à février 2009

As E & I Section Engineer for KGP Project (Khurasania Gas Plant), (Technip Scope, ” Inlet facilities & NGL Recovery Plants).
Responsible for Electrical activities related the construction phase.

E & I Superintendent à Bentini
  • Libye - Zaouïa
  • janvier 2005 à mars 2006

As E & I Superintendent for Sulphur Solidification & Storage (Mellitah Plant), Responsible for Electrical & Instrumentation installation (Instrument installation - Cable trays - Cable pulling - Cable termination - Grounding - Cathodic protection - lighting - fire & gas system - All Loop Checks & Testes for LV, MV cables)

Senior Electrical Engineer à ABB Installation Products - Other locations
  • Egypte - Marsa Matruh
  • octobre 2002 à décembre 2004

ABB representative for installing and commissioning for Electrical and HVAC systems for oil and gas Field

Installed Equipments:

• MV, LV & control systems supplied by ABB
• MV, LV & control systems for 3 gas turbine supplied by "Solar Turbine".
• Lighting Systems supplied by ABB
• HVAC system supplied by ABB
The above systems installed with its all integrated activities
• E.g. Cable routing, pulling & connections
• Bus bar installation
• Earting systems

Electrical engineer à EDF (Electrisite' de France)
  • Egypte - Suez
  • février 2001 à octobre 2002

• Electrical engineer for the (2 x 341 M Watt Gas - Fuel fired power plant). This part of time expresses the field follow up, implementation with Quality assurance and Quality control for the Electrical Installation & Construction Work (LV & MV switchboard erection - Transformers installation - Cable Routing, Laying & Connection - Lighting, Earthing & Fire Alarm systems - MV bus duct with sf6 injection.

• Coordination between different vendors to install their equipments ( Packages) sequentially to achieve the integrity of the system.

• Pre commissioning and preparation work for the commissioning team
• As a witness for the commissioning work during the cold, hot and performance tests for the plant

Field Instrument engineer à Carlo Gavazzi Egypt
  • Egypte - Alexandrie
  • mars 2000 à février 2001

Supervising of Instrument activities and its related testes ( Instruments installation, tubing, tubing pressure tests and loop check.)

E & I Supervisor à Posco Engineering & Construction Co., LTD
  • Egypte - Menoufia
  • mars 1997 à février 2000

Supervising and approving the construction, cold, hot and performance work for instrumentation, automation and electrical power systems related to the utility department which include
• Water Treatment plant designed by WTD company (Italy)
• Air Separation plant designed by LINDE AG company (Germany)
• Boiler plant designed by Kon Won company ( Korea)

chief technical officer à Egyptian Army Force
  • Egypte - Marsa Matruh
  • janvier 1995 à février 1997

Operation, Maintenance, Maintenance Planning and spare parts for electrical power units based on diesel generators.

Éducation

Baccalauréat, BA of Electrical Engineering
  • à Faculty of Engineering
  • novembre 1994

Specialties & Skills

Project Work
Project Plans
Electrical Engineering
Electrical Testing
AutoCAD
Microsoft Word
Microsoft Excel
AutoCad

Langues

Anglais
Expert

Adhésions

Egyptian Concil of Engineers
  • Engineer
  • January 1995
Saudi Concil Of Engineers
  • Electrical Engineer
  • January 2014

Formation et Diplômes

Planninig using primavera (Formation)
Institut de formation:
Arab Academy for science and Technology
Date de la formation:
June 2002
Durée:
120 heures