manage project within budget & supervise /control work team & ensure for HSE manage resources and equipment .
working as a senior engineer at the project (( Establishing, Executing and Maintaining No. of (290 Flats) in Sectors (N1&N3)+(350 Flats), Public Buildings and Main Services works and Infrastructure in Service Center in Jaber Al Ahmad City Project of (58, 370, 000.00 KD).))
Supervise all the construction works & architectural works for all finishing and landscape works.
assists in reviewing all submittasl and issues related to construction & preparing RFIs and shop drawings and Reviews and evaluates Variation Orders from construction sites in 3 projects which i work (( Trio Mall (khaitan) & American University of The Middle East (BP1- Extension Of AUM Main Building) At AQEALA AREA, KUAWIT & Homaizi Group Offices, Shuwaikh, KUAWIT & Municipal Car Parking ( NBK ), Sharak, KUAWIT ))
- Supervision and Inspect all Items .
- Reviewing Monthly Pills Of Quantities (for Client)
- Reviewing RFI's & Shop Drawings & Submittals
Inspect All Items of gravity sewer lines in Project : (Gravity Sewer Project At KmOmbo City- EGYPT)
Supervise all the construction works & architectural works for all finishing and landscape works for 10 Residential Buildings and Reviewing Monthly Pills Of Quantities (for Client & Sub Contractors
Supervise All Items Which Include:-
- Installation RC Pipes (Ø 1000 mm to 1400 mm ) and its Related Work (Exfiltration &Infiltration Water Test For RCP's & RCP Finishing (Grouting, Injection, PVC Liner )
- Manhole Installation (Pre-cast &Cast in place) and its Related Work
- (Exfiltration &Infiltration Water Test For Manhole & Manhole Finishing (Benching, Rungs, Grouting, Blue Brick Courses, C.I.”Frame &Cover”, Lining with Blue Brick & Painting ).
- Installation and Finishing for Concrete Valve Houses of Water Lines
- Supervise of installation of 450 mm Ductile Iron Pipe Force Main (4.50 km ) and its related work which include Installation & Test .
- Supervise of installation of New Sewer Network At Luxur City and its related work which include :- (Excavation, Wood Shoring, Installation PVC Pipes (Ø 160mm to 600mm ), Manhole Installation & Finishing, Water Test For Manhole, Low Pressure Air Test & Deflection Test “Mandrill” For PVCP
- Supervise of installation of New Sewer Network At Aswan Cities and its related work which include (Excavation, Wood Shoring, Installation PVC Pipes (Ø 160mm to 600mm ), Manhole Installation & Finishing, Water Test For Manhole, Low Pressure Air Test & Deflection Test “Mandrill” For PVCP
- Supervise of Installation RC Pipes (Ø 1000mm to 1200mm )& Manholes (Type 1, 2, 3&4) Pre-cast & Cast in place at K/D Line and its related work which include (Excavation, Wood Shoring, Exfiltration &Infiltration Water Test For Manhole & RCP., Low Pressure Air Test & Deflection Test “Mandrill” For PVCP&VCP., Manhole Finishing & RCP Finishing.
: Inspect all Items Which Include Surveying Works, Concrete Works, Reviewing & Preparing Monthly Pills
- Supervising Of all Items Which Include Surveying Works, Excavation Works, Form Work & Reinforcement Work,
- Preparing Monthly Pills For Sub-contractor & Client.
- Inspect all Items Which Include : Excavation, Piles (Continues Flight Auger., …), Foundation, Concrete Works, Concrete Tanks (Circler, Rectangular), Loading Test For Piles, Preparing monthly Pills. ((PROJECT :- Sugar & Integrated Industrial Company At KomOmbo City &Misr-Edfu Company for Pulp, Writing and Printing Paper ))