محمد  محرز, Civil Engineering manager

محمد محرز

Civil Engineering manager

PGESCo

البلد
مصر - القاهرة
التعليم
بكالوريوس, civil engineering
الخبرات
22 years, 4 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :22 years, 4 أشهر

Civil Engineering manager في PGESCo
  • مصر - القاهرة
  • أشغل هذه الوظيفة منذ أغسطس 2008

Combined Cycle Power Plant
(Detailed design for Siemens / Orascom Consortium )
•New administrative capital 4 x 1200 Mw.
•AL Burullus 4 x 1200 Mw.
Supercritical thermal Power Plant.
•South helwan 3 x 650 Mw
Simple Cycle Power Plants 2150 Mw.
•Lamlouda 2x50 Mw
•Samnu 1x50 Mw
•Susah 2*300 Mw
•Al Shabab 1000 Mw
•Damietta 500 Mw
•West Damietta 500 Mw.
Substation.
•Naga Hamadi 500/220/66/11 GIS
•East Qena 500/220/66/22 GIS
Responsible Engineer
Combined Cycle Power Plants.
•Al Atf 750 Mw
•Sidi krir (5 & 6) 750 Mw
Thermal Power Plant.
•Abu Qir 1300 Mw
Prepare Contract technical document, prepare specification, Material quantities estimate, pricing schedules, estimate preliminary contract value, and prepare conceptual drawing, basic design, and detailed design document for tender and evaluation offers during the bid. Provide schedule, prepare storm drainage system conceptual/ detailed, site development preparation for construction phase and final phase, fully awareness about power generation cooling water Offshore work and budget for civil engineering activity; Also including internal/external Coordination between contractors and engineering design scope, reviews the vendor contracts, drawing including civil design, solving clashes, intersections, reply the RFI evaluate NCR issue DCN, site support and follow up the detailed design drawing.

Structural Engineer في Al Jawda Engineering
  • يونيو 2007 إلى أغسطس 2008

Assigned By PGESCo to ACESCo. Libyan consultant for power project. Scopes include Design Document Review and site support.
Power Substation Projects phase (II, III) 220 / 400 Kv
•Zawia, Benghazi North, Ras lanuf, Sirte, Bir Alsta Milad, Janzour& Agdabia.
Power Transmission line Projects
•Zawia to Janzour, Janzour to Bir Alsta Milad, Agdabia to Ras lanuf and Sirte to benghazi North 400 kv S/S O.H.T.L
Desalination Plants.
•Zawia 80, 000 m3 / day, Derna 40, 000 m3 / day and Sussa 40, 000 m3 / day.
Power Plants.
•Benghazi Combined Cycle Power Plant 2x2x1 3x250 Mw.
•Miusirta Combined Cycle Power Plant 2x2x1 3x250 Mw.

Structural Engineer في AL JAWDA
  • مصر
  • أكتوبر 2006 إلى يونيو 2007

Perform structural design for power substation .
Base design for power substation 110/13.8 kv KSA western operating area.
•Substation Al haramain
•Substation Al quimaria

Structural Engineer في AL ETQAUINE ENGINEERS
  • مصر
  • فبراير 2006 إلى أكتوبر 2006

Perform structural design for residential building.
•Work shop drawing for educational building brida KSA
•Design 3 mosque in southern area KSA
•Gas station on high ways KSA 4 types
•Check point at boarder line between KSA & UAE.

Structural Engineer في Al-Jazirah Engineers And Consultants
  • المملكة العربية السعودية
  • يوليو 2004 إلى سبتمبر 2005

Perform structural design for Power project.Base and detailed design for Power Substations and Power Plant.
•Substation 8097 - 132/13.8 kv 3x115 MVA GIS KSA central operating area
•Substation DAMMAM BSP - 13.8 kv 3x65 MVA KSA eastern operating area
•Substation SAKAKA & EL JOUF - 132/13.8 kv 3x115 MVA GIS KSA eastern operating area.
•Extension of sharoura Power Plant diesel generator. Design( fuel tanks, water tank, radiator and control building) KSA southern operating area.
Egyptian Geotechnical
&
Structural Consultant Office

Structural Engineer
  • مصر
  • يناير 2002 إلى يوليو 2004

Perform structural design for residential and industrial project.
Concrete
•Hotel building ( main building of Hilton ouion sharm )
•Hotel building ( cluster 1 of hilton ouion sharm )
•Mechanical building (equipment room of hilton ouion sharm )
•Training hall ( extension of fasel club damitta )
•Educational building ( lab building for university 10 th Ramadan
•Industrial building (nouval magdy afifi )
•Industrial building (nasr habib company )
•Many private villas and residential building.
STEEL
•Entertainment building (golden resorts sharm )
•Industrial building (refetruck egypt )
•Industrial building (egyption media production city)
•Building extension (egypt for sound, light and cinema )
•Multi purpose building (el nakheel shoping center el riyadh k.s.a )
•Main building (golden resorts sharm extension of resturant )
•Multi purpose building (roxy mall )
REPAIR
Reinforcement
•Abo dawod el zaherey residential building col &beams
•Wael fahmy tower residential building col & beams
•Ahmed abd el maksod tower residential building col & beams.
•Private villa at katamya hight residential building col & beams
WORK SHOP
•Moveinpeak Al Khober bar bending schedule for building
•Guest villas, employs accommodation, banquet hall
ROADS & SLOPE PROTECTION
Work in Bill of quantity works, technical specifications & planning
•EL Mokattem edge protection stage 1, 2, 3, 4, 5, 6
•El maerage city ( high way connection)


Egyptian Electricity Transmission
Company.
(Cairo, Egypt) E.E.T.C. (from 1/

Structural Engineer في El SHIBEL
  • مصر
  • يوليو 2001 إلى أكتوبر 2001

Perform conceptual Design for bridges.
Number: 14 bridges in western region KSA (high way upgrade tender drawing to ministry of public work).

الخلفية التعليمية

بكالوريوس, civil engineering
  • في Ain Shams University
  • مايو 2001

GRADUATION PROJECT Geotechnical project Project consists of : Underground station, Dams, Geotextile report & Piles report

Specialties & Skills

Desalination
Power Generation
Event Co ordination
Substation design
ADMINISTRATION
BUDGETING
CONTRACT MANAGEMENT
ENGINEERING
GRAPHIC DESIGN
PRICING
SIEMENS NIXDORF HARDWARE

اللغات

العربية
متمرّس
الهولندية
متمرّس
الانجليزية
متمرّس

الهوايات

  • reading technical document