mohamed gani mohamed arif, Mechanical Engineer

mohamed gani mohamed arif

Mechanical Engineer

Doosan Heavy Industries & Construction

Lieu
Arabie Saoudite - Jeddah
Éducation
Baccalauréat, Mechanical
Expérience
18 years, 3 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :18 years, 3 Mois

Mechanical Engineer à Doosan Heavy Industries & Construction
  • Arabie Saoudite - Jeddah
  • Je travaille ici depuis septembre 2011

. Monitoring Boiler Pipe Erection & installation on site
. supervision and monitoring Hydro HP & MP pneumatic & hydro static Test
• Monitoring of structural members fabrication & installation
• Verify dimensions as per drawings/standards
• Prepare trace-ability records, weld summary & compile necessary documents
• Prepare punch list for structural members Erection
• Check & verify the structure/hull meet the contract specification, procedure & applicable standards Check & verify the structure/hull meet the contract specification,

Piping Engineer à Samsung Engineering
  • Inde - Ahmedabad
  • janvier 2011 à septembre 2011

• Test package preparation.
• Represent our company in management and technical meeting in project assigned
• Monitoring daily workloads and activities.
• Updating project reports on work accomplishments / percentage based on project completion.
• Responsible of fabrication of piping works per codes and specification.
• Studying drawing and accessing work to the workers.
• Line check with client & sub contactor
• Test package and Punch list making related piping and Fabrication & insulation erection
• Test package to be released for pressure testing
• Drawing to be revised as per site build
• Studied ISO, GAD, P&ID & Assembly drawing
• Monitoring the work activity as per drawing and standards
• Review 3D smart preview drawing for some critical erection

Piping Engineer à Samsung Engineering
  • Bahreïn
  • février 2010 à décembre 2010

• Represent our company in management and technical meeting in project assigned
• Monitoring daily workloads and activities.
• Updating project reports on work accomplishments / percentage based on project completion.
• Responsible of fabrication of piping works per codes and specification.
• Studying drawing and accessing work to the workers.
• Arranging raw materials for the monthly by monthly process.
• Monitoring daily pipe & pipe supports erection activity
• Line check with client & sub contactor
• Test package and Punch list making related piping and Fabrication & insulation erection
• Test package to be released for pressure testing
• Drawing to be revised as per site build
• Studied ISO, GAD, PNID & Assembly drawing
• Monitoring the work activity as per drawing and standards
• Weekly once attend meeting with subcontractor and discus about pipe fabrication, pipe support erection & welding activity
• Review 3D smart preview drawing for some critical erection
• Monitoring LBOP PROJECT fabrication Activity on Fabrication shop

piping Engineer à Mitsui Engineering & shipbuilding Pvt Ltd
  • Autre
  • mai 2007 à octobre 2009

• Represent our company in management and Technical meeting in project assigned
• Monitoring daily workloads and activities.
• Updating project reports on work accomplishments / percentage based on project completion. Conduct site survey prior to hauling of equipments, materials, tools prior to work.
• Responsible of fabrication of piping works per codes and specification.
• Studying drawing and accessing work to the workers.
• Arranging Fabrication materials for the day to day process.
• Daily Monitoring pipe & supports erection activity
• Line check with client & sub contactor
• piping and insulation Punch list making for Test package clearance.
• Test package to be released for pressure testing & visual testing
• Drawing to be modified as per site condition
• Studied ISO, GAD, P&ID & Assembly drawing
• Monitoring the work activity as per drawing and standards
• Supervision & Monitoring for Flushing & OATT activities
• Supervision & Monitoring the insulation Activity
• Weekly once attend meeting with subcontractor and discus about pipe, pipe support erection & welding activity
• Preparing 3D smart preview drawing for some critical erection

piping & welding Engineer à southern pressing & Fabrication industry
  • Autre
  • novembre 2005 à mai 2007

• Studying drawing and accessing work to the workers.
• Preparing bill of materials.
• Planning Manpower.
• Monitoring 5S principle
• Arranging raw materials for the day to day process.
• Supervising the fabrication of piping, and welding works
• Giving part to the designing and developing process.
• Preparing the daily reports and submission of this to top level.
• Fabrication and erection of circuit piping for all the supplied places.
• Monitoring & maintain Quality of fabrication.
• Intensify the problem for fabrication work place and solve the problem
• Supervising the work through out and releasing bills for done by final measurements.

Éducation

Baccalauréat, Mechanical
  • à Mohamed sathak Engineering college, Anna university
  • novembre 2005

Bachelor of Mechanical Engineering. First Class

Specialties & Skills

Project Management
Work Planning
Steel Structures
Piping Engineer

Langues

Anglais
Expert
Hindi
Débutant
Malayala
Moyen
Tamil
Expert