مجموع سنوات الخبرة: 17 سنوات, 8 أشهر
يوليو 2019
إلى حتى الآن
Construction Manager
في Civil & Electrical Projects Company (CEPCO)
البلد :
المملكة العربية السعودية - جدة
PROJECT : Jeddah Storm Water and Master-plan (JSWM)
CONSULTANT : Louis Berger, LTD
PROJECT DURATION : 12 MONTHS
CAST : 109 MILLION SAUDI RIYALS
DESCRIPTION OF THE PROJECT :
1- Internal network 24 km RC Pipes with different diameters from ( 600 mm to 2400 mm)
2- More than 500 peace of Catch Basin and PRD's
Responsibility:
- Oversee and direct construction projects from conception to completion
- Review the project in-depth to schedule deliverable and estimate costs
- Oversee all onsite and offsite constructions to monitor compliance with construction and safety regulations
- Coordinate and direct construction workers and subcontractors
-Select tools, materials and equipment and track inventory
- Meet contractual conditions of performance
- Review the work progress on daily basis
- Prepare internal and external reports pertaining to job status
- Plan ahead to prevent problems and resolve any emerging ones
- Negotiate terms of agreements, draft contracts and obtain permits and licences
- Analyse, manage and mitigate risks
- Ensure quality construction standards and the use of proper construction techniques
CONSULTANT : Louis Berger, LTD
PROJECT DURATION : 12 MONTHS
CAST : 109 MILLION SAUDI RIYALS
DESCRIPTION OF THE PROJECT :
1- Internal network 24 km RC Pipes with different diameters from ( 600 mm to 2400 mm)
2- More than 500 peace of Catch Basin and PRD's
Responsibility:
- Oversee and direct construction projects from conception to completion
- Review the project in-depth to schedule deliverable and estimate costs
- Oversee all onsite and offsite constructions to monitor compliance with construction and safety regulations
- Coordinate and direct construction workers and subcontractors
-Select tools, materials and equipment and track inventory
- Meet contractual conditions of performance
- Review the work progress on daily basis
- Prepare internal and external reports pertaining to job status
- Plan ahead to prevent problems and resolve any emerging ones
- Negotiate terms of agreements, draft contracts and obtain permits and licences
- Analyse, manage and mitigate risks
- Ensure quality construction standards and the use of proper construction techniques
أغسطس 2018
إلى يوليو 2019
SENIOR INFRASTRUCTURE ENGINEER (Roads & Utilities)
في MOTLAQ AL GHOWARY CO.
البلد :
المملكة العربية السعودية - عرعر
PROJECT : Extension of water treatment line between Al Jouf city to Waad Al shamal City (North Border)
CONSULTANT : AECOM, LTD
PROJECT DURATION : 24 MONTHS
CAST : 1.2+ BILLION SAUDI RIYALS
DESCRIPTION OF THE PROJECT :
200 KM OF GRB TREATMENT LINE (1400 mm)
250 KM OF GRB TREATMENT LINE (1200 mm)
25 KM OF CARBON STEEL TREATMENT LINE (800 mm)
4 TREATMENT STATION
63 AIR VALVE CHAMPERS
185 BUTTERFLY VALVE CHAMPERS
52 WASHOUT VALVE CHAMPERS
Responsibility:
1- Excavation of 70 km.
2-Instillation of 65 km GRB pips (1200 mm) & 5 km GRB (1400 mm).
3-Back-filling layer by layer to reach ground level.
4- 21 Air valve Champers
5- 37 Butterfly valve Champers
6- 16 Washout valve Champers
CONSULTANT : AECOM, LTD
PROJECT DURATION : 24 MONTHS
CAST : 1.2+ BILLION SAUDI RIYALS
DESCRIPTION OF THE PROJECT :
200 KM OF GRB TREATMENT LINE (1400 mm)
250 KM OF GRB TREATMENT LINE (1200 mm)
25 KM OF CARBON STEEL TREATMENT LINE (800 mm)
4 TREATMENT STATION
63 AIR VALVE CHAMPERS
185 BUTTERFLY VALVE CHAMPERS
52 WASHOUT VALVE CHAMPERS
Responsibility:
1- Excavation of 70 km.
2-Instillation of 65 km GRB pips (1200 mm) & 5 km GRB (1400 mm).
3-Back-filling layer by layer to reach ground level.
4- 21 Air valve Champers
5- 37 Butterfly valve Champers
6- 16 Washout valve Champers
نوفمبر 2016
إلى يونيو 2018
SENIOR INFRASTRUCTURE ENGINEER (Roads & Utilities)
في SAUDI PAN KINGDOM CO. LTD (SAPAC)
البلد :
المملكة العربية السعودية - جدة
PROJECT : THIRD JEDDAH INDUSTRIAL CITY EXPANSION PHASE 1&2
CONSULTANT : SAUDI ARABIAN PARSONS LTD, (SAPL)
PROJECT DURATION : 24 MONTHS
CAST : 320+ MILLION SAUDI RIYALS
DESCRIPTION OF THE PROJECT :
44 KM OF POTABLE WATER NETWORK
42 KM OF IRRIGATION NETWORK
34 KM OF SEWERAGE NETWORK
37 KM OF STORM WATER NETWORK
8 COLLECTOR PONDS
4 LIFT STATIONS
12 WATER & IRRIGATION TANKS
2 PUMP STATION
51 KM OF MEDIUM VOLTAGE
58 KM OF STREET LIGHTING CABLES
22 SUBSTATIONS
I am in-charge of pressurized networks as senior infrastructure engineer (UTILITIES).
Under me 6 foremans for potable water network, Force main line for sewerage and irrigation networks.
1- Potable water Network: Two kinds of pipes (uPVC & HDPE ), variable diameter from (160 - 560 mm), +300 gate valve, +350 fire hydrant and other valves like air valves and washout valves .
2- Irrigation Network :Two kinds of pipes (uPVC & HDPE ), variable diameter from (160 - 710 mm), +200 gate valve and other valves like air valves and washout valves .
3- Force Main Line : 2.8 km length HDPE pipes of 400 mm diameter
CONSULTANT : SAUDI ARABIAN PARSONS LTD, (SAPL)
PROJECT DURATION : 24 MONTHS
CAST : 320+ MILLION SAUDI RIYALS
DESCRIPTION OF THE PROJECT :
44 KM OF POTABLE WATER NETWORK
42 KM OF IRRIGATION NETWORK
34 KM OF SEWERAGE NETWORK
37 KM OF STORM WATER NETWORK
8 COLLECTOR PONDS
4 LIFT STATIONS
12 WATER & IRRIGATION TANKS
2 PUMP STATION
51 KM OF MEDIUM VOLTAGE
58 KM OF STREET LIGHTING CABLES
22 SUBSTATIONS
I am in-charge of pressurized networks as senior infrastructure engineer (UTILITIES).
Under me 6 foremans for potable water network, Force main line for sewerage and irrigation networks.
1- Potable water Network: Two kinds of pipes (uPVC & HDPE ), variable diameter from (160 - 560 mm), +300 gate valve, +350 fire hydrant and other valves like air valves and washout valves .
2- Irrigation Network :Two kinds of pipes (uPVC & HDPE ), variable diameter from (160 - 710 mm), +200 gate valve and other valves like air valves and washout valves .
3- Force Main Line : 2.8 km length HDPE pipes of 400 mm diameter
نوفمبر 2013
إلى نوفمبر 2016
SENIOR INFRASTRUCTURE ENGINEER
في SAUDI PAN KINGDOM CO. LTD (SAPAC)
البلد :
المملكة العربية السعودية - الرياض
PROJECT : STORM WATER DRAINAGE PROJECT AT NEIGHBORHOOD OF ( AL-FALAH, AL-WADI & AL-NADA )
CONSULTANT : BERNARD LTD.
PROJECT DURATION : 30 MONTHS
CAST : 119+ MILLION SAUDI RIYALS
DESCRIPTION OF THE PROJECT :
10+ KM OF CONCRETE PIPS
15+ KM OF BOX CULVERT
I am in-charge of Neighborhood Al-Nada as SENIOR INFRASTRUCTURE ENGINEER.
1 - Working under me (2 site engineer, 5 foreman, 2 surveyor) & +100 labour.
2 - In my area there is too many activities like ( Excavation, Concrete pouring for box culvert, pre-casted box culvert . concrete pipes dim (400 mm to 1200 mm) back filling layer by layer and asphalt .
3 - Installation of sewage network along the 10 km diameters variable (200 mm & 250 mm).
4 - Major sewage line connecting the two lines executing a diameter of 400 mm length 5 km.
5- Implementation of 480 catch basin in the project.
CONSULTANT : BERNARD LTD.
PROJECT DURATION : 30 MONTHS
CAST : 119+ MILLION SAUDI RIYALS
DESCRIPTION OF THE PROJECT :
10+ KM OF CONCRETE PIPS
15+ KM OF BOX CULVERT
I am in-charge of Neighborhood Al-Nada as SENIOR INFRASTRUCTURE ENGINEER.
1 - Working under me (2 site engineer, 5 foreman, 2 surveyor) & +100 labour.
2 - In my area there is too many activities like ( Excavation, Concrete pouring for box culvert, pre-casted box culvert . concrete pipes dim (400 mm to 1200 mm) back filling layer by layer and asphalt .
3 - Installation of sewage network along the 10 km diameters variable (200 mm & 250 mm).
4 - Major sewage line connecting the two lines executing a diameter of 400 mm length 5 km.
5- Implementation of 480 catch basin in the project.
يوليو 2013
إلى نوفمبر 2013
INFRASTRUCTURE ENGINEER
في SAUDI PAN KINGDOM CO. LTD
البلد :
المملكة العربية السعودية - الرياض
CONTRACT NO, 10 WITH NATIONAL WATER COMPANY
PROJECT : STRATEGIC TANK IN RIYADH
CONSULTANT : KHATIB & ALAMY
PROJECT DURATION : 2 YEARS
CAST : +122 MILLION SAUDI RIYALS
DESCRIPTION OF THE PROJECT :
50, 000 CUBIC METER SQUARE TANK
50, 000 CUBIC METER RECTANGULAR TANK
10, 000 CUBIC METER RECTANGULAR TANK
5, 000 CUBIC METER CIRCULAR TANK
AND ALSO 2 PUMP STATION
I have in-charge of the 5, 000 CUBIC METER CIRCULAR TANK, but the municipality has stopped us cause of complaint citizens. Then I transfer to anther project
PROJECT : STRATEGIC TANK IN RIYADH
CONSULTANT : KHATIB & ALAMY
PROJECT DURATION : 2 YEARS
CAST : +122 MILLION SAUDI RIYALS
DESCRIPTION OF THE PROJECT :
50, 000 CUBIC METER SQUARE TANK
50, 000 CUBIC METER RECTANGULAR TANK
10, 000 CUBIC METER RECTANGULAR TANK
5, 000 CUBIC METER CIRCULAR TANK
AND ALSO 2 PUMP STATION
I have in-charge of the 5, 000 CUBIC METER CIRCULAR TANK, but the municipality has stopped us cause of complaint citizens. Then I transfer to anther project
مايو 2012
إلى يوليو 2013
INFRASTRUCTURE ENGINEER
في SAUDI PAN KINGDOM CO. LTD
البلد :
المملكة العربية السعودية - جدة
JEDDAH STORM-WATER DRAINAGE PROJECT ( JSDP )
SAUDI ARAMCO PROJECT
CLINT : SAUDI ARAMCO
CONSULTANT : AECOM LTD, SNC LAVALIN LTD
EASTERN CHANNEL
CAST : 751+ MILLION RIYALS
LENGTH : 21 KM
PROJECT DURATION : 9 MONTHS
CONCRETE : 250, 000+ CUBIC METER
EXCAVATION : 3.5+ MILLION CUBIC METER
Work as Infrastructure engineer in 7 km length of open trapezoidal channel, under me 2 site engineers and more than (20 foreman, 200 carpenter, 300 steel fixer, 100 labor, 100 mason & heavy equipment like ( bulldozer D9, Pay Loader 966, excavator Caterpillar 320, 349 and other heavy equipment )
more than 15 activity.
* I chosen by the company as the best project engineer *
SAUDI ARAMCO PROJECT
CLINT : SAUDI ARAMCO
CONSULTANT : AECOM LTD, SNC LAVALIN LTD
EASTERN CHANNEL
CAST : 751+ MILLION RIYALS
LENGTH : 21 KM
PROJECT DURATION : 9 MONTHS
CONCRETE : 250, 000+ CUBIC METER
EXCAVATION : 3.5+ MILLION CUBIC METER
Work as Infrastructure engineer in 7 km length of open trapezoidal channel, under me 2 site engineers and more than (20 foreman, 200 carpenter, 300 steel fixer, 100 labor, 100 mason & heavy equipment like ( bulldozer D9, Pay Loader 966, excavator Caterpillar 320, 349 and other heavy equipment )
more than 15 activity.
* I chosen by the company as the best project engineer *
يناير 2010
إلى أبريل 2012
SITE ENGINEER (civil work)
في AL-RAI ENGINEERING CONSULTANTS
البلد :
المملكة العربية السعودية - الرياض
Quantity Consultant Engineer .
Responsable for quantity of 4 project
Site Consultant Engineer .
Supervising the implementation of:
1- Sewage systems along the 30 km diameters (200 mm and 250 mm) Shaqraa province.
2- A major sewage line along the 15 km diameter of 350 mm.
3- Water networks 40-km-long diameters (110 mm and 160 mm) of Polyethylene HDPE & PVC pipes.
4- A major water line length of 25 km of 250 mm diameter Ductile Iron (DI).
5- Ground water tank project utmost 2, 000 cubic meters .
Responsable for quantity of 4 project
Site Consultant Engineer .
Supervising the implementation of:
1- Sewage systems along the 30 km diameters (200 mm and 250 mm) Shaqraa province.
2- A major sewage line along the 15 km diameter of 350 mm.
3- Water networks 40-km-long diameters (110 mm and 160 mm) of Polyethylene HDPE & PVC pipes.
4- A major water line length of 25 km of 250 mm diameter Ductile Iron (DI).
5- Ground water tank project utmost 2, 000 cubic meters .
أغسطس 2008
إلى يناير 2010
SITE ENGINER (civil work)
في TALAAT MOSTAFA GROUP, ALEXANDRAI CONSTRUCTION COMPANY - (ACC)
البلد :
مصر - القاهرة
PROJECT : MADINATY PROJECT.
CONSULTANT : ECG LTD.
PROJECT DURATION : UP TO NOW
CAST : 80 BILLION EGYPTIAN POUNDS
DESCRIPTION OF THE PROJECT :
1. Implementation of network drinking water 57 kilometers in diameter (110 mm -160 mm) UPVC pipes.
2. Implementation of 345 house connection.
3. Implementation of a sewage network length of 106 km in diameter (200 mm -250 mm) CLAY pipes.
4. Implementation transmission line (DI) 300 mm diameter of length 22 km.
CONSULTANT : ECG LTD.
PROJECT DURATION : UP TO NOW
CAST : 80 BILLION EGYPTIAN POUNDS
DESCRIPTION OF THE PROJECT :
1. Implementation of network drinking water 57 kilometers in diameter (110 mm -160 mm) UPVC pipes.
2. Implementation of 345 house connection.
3. Implementation of a sewage network length of 106 km in diameter (200 mm -250 mm) CLAY pipes.
4. Implementation transmission line (DI) 300 mm diameter of length 22 km.
يوليو 2006
إلى يوليو 2008
SITE ENGINEER (civil work)
في THE ARAB CONTRACTORS, OSMAN AHMED OSMAN &Co
البلد :
مصر - القاهرة
PROJECT : THE MEDICAL CENTERS
CONSULTANT : ECG LTD.
PROJECT DURATION : 4 YEARS
CAST : 75 MILLION EGYPTIAN POUNDS
Training while studying for two years at the Arab Contractors Company
1. Implementation of the foundations of the project which is about piles a depth of 30 meters with separate rules
2-Implementation columns
3. Implementation of slabs
4. Extend water pipes to feed the hospital length of 3 km
5-Extension of the sewer line of 1 km length
6. Finishes the initial project of the plumbing and the installation of cutting pipes
CONSULTANT : ECG LTD.
PROJECT DURATION : 4 YEARS
CAST : 75 MILLION EGYPTIAN POUNDS
Training while studying for two years at the Arab Contractors Company
1. Implementation of the foundations of the project which is about piles a depth of 30 meters with separate rules
2-Implementation columns
3. Implementation of slabs
4. Extend water pipes to feed the hospital length of 3 km
5-Extension of the sewer line of 1 km length
6. Finishes the initial project of the plumbing and the installation of cutting pipes