Mohamed Mahmoud Abdel Wanis El Sherbini , Construction Manager

Mohamed Mahmoud Abdel Wanis El Sherbini

Construction Manager

Civil & Electrical Projects Company (CEPCO)

Lieu
Arabie Saoudite - Riyad
Éducation
Baccalauréat, Civil Engineering
Expérience
17 years, 9 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :17 years, 9 Mois

Construction Manager à Civil & Electrical Projects Company (CEPCO)
  • Arabie Saoudite - Jeddah
  • Je travaille ici depuis juillet 2019

PROJECT : Jeddah Storm Water and Master-plan (JSWM)

CONSULTANT : Louis Berger, LTD
PROJECT DURATION : 12 MONTHS
CAST : 109 MILLION SAUDI RIYALS

DESCRIPTION OF THE PROJECT :

1- Internal network 24 km RC Pipes with different diameters from ( 600 mm to 2400 mm)
2- More than 500 peace of Catch Basin and PRD's


Responsibility:

- Oversee and direct construction projects from conception to completion
- Review the project in-depth to schedule deliverable and estimate costs
- Oversee all onsite and offsite constructions to monitor compliance with construction and safety regulations
- Coordinate and direct construction workers and subcontractors
-Select tools, materials and equipment and track inventory
- Meet contractual conditions of performance
- Review the work progress on daily basis
- Prepare internal and external reports pertaining to job status
- Plan ahead to prevent problems and resolve any emerging ones
- Negotiate terms of agreements, draft contracts and obtain permits and licences
- Analyse, manage and mitigate risks
- Ensure quality construction standards and the use of proper construction techniques

SENIOR INFRASTRUCTURE ENGINEER (Roads & Utilities) à MOTLAQ AL GHOWARY CO.
  • Arabie Saoudite - Arar
  • août 2018 à juillet 2019

PROJECT : Extension of water treatment line between Al Jouf city to Waad Al shamal City (North Border)

CONSULTANT : AECOM, LTD
PROJECT DURATION : 24 MONTHS
CAST : 1.2+ BILLION SAUDI RIYALS

DESCRIPTION OF THE PROJECT :
200 KM OF GRB TREATMENT LINE (1400 mm)
250 KM OF GRB TREATMENT LINE (1200 mm)
25 KM OF CARBON STEEL TREATMENT LINE (800 mm)
4 TREATMENT STATION
63 AIR VALVE CHAMPERS
185 BUTTERFLY VALVE CHAMPERS
52 WASHOUT VALVE CHAMPERS

Responsibility:
1- Excavation of 70 km.
2-Instillation of 65 km GRB pips (1200 mm) & 5 km GRB (1400 mm).
3-Back-filling layer by layer to reach ground level.
4- 21 Air valve Champers
5- 37 Butterfly valve Champers
6- 16 Washout valve Champers

SENIOR INFRASTRUCTURE ENGINEER (Roads & Utilities) à SAUDI PAN KINGDOM CO. LTD (SAPAC)
  • Arabie Saoudite - Jeddah
  • novembre 2016 à juin 2018

PROJECT : THIRD JEDDAH INDUSTRIAL CITY EXPANSION PHASE 1&2

CONSULTANT : SAUDI ARABIAN PARSONS LTD, (SAPL)
PROJECT DURATION : 24 MONTHS
CAST : 320+ MILLION SAUDI RIYALS

DESCRIPTION OF THE PROJECT :
44 KM OF POTABLE WATER NETWORK
42 KM OF IRRIGATION NETWORK
34 KM OF SEWERAGE NETWORK
37 KM OF STORM WATER NETWORK
8 COLLECTOR PONDS
4 LIFT STATIONS
12 WATER & IRRIGATION TANKS
2 PUMP STATION
51 KM OF MEDIUM VOLTAGE
58 KM OF STREET LIGHTING CABLES
22 SUBSTATIONS

I am in-charge of pressurized networks as senior infrastructure engineer (UTILITIES).
Under me 6 foremans for potable water network, Force main line for sewerage and irrigation networks.
1- Potable water Network: Two kinds of pipes (uPVC & HDPE ), variable diameter from (160 - 560 mm), +300 gate valve, +350 fire hydrant and other valves like air valves and washout valves .
2- Irrigation Network :Two kinds of pipes (uPVC & HDPE ), variable diameter from (160 - 710 mm), +200 gate valve and other valves like air valves and washout valves .
3- Force Main Line : 2.8 km length HDPE pipes of 400 mm diameter

SENIOR INFRASTRUCTURE ENGINEER à SAUDI PAN KINGDOM CO. LTD (SAPAC)
  • Arabie Saoudite - Riyad
  • novembre 2013 à novembre 2016

PROJECT : STORM WATER DRAINAGE PROJECT AT NEIGHBORHOOD OF ( AL-FALAH, AL-WADI & AL-NADA )
CONSULTANT : BERNARD LTD.
PROJECT DURATION : 30 MONTHS
CAST : 119+ MILLION SAUDI RIYALS
DESCRIPTION OF THE PROJECT :
10+ KM OF CONCRETE PIPS
15+ KM OF BOX CULVERT
I am in-charge of Neighborhood Al-Nada as SENIOR INFRASTRUCTURE ENGINEER.
1 - Working under me (2 site engineer, 5 foreman, 2 surveyor) & +100 labour.
2 - In my area there is too many activities like ( Excavation, Concrete pouring for box culvert, pre-casted box culvert . concrete pipes dim (400 mm to 1200 mm) back filling layer by layer and asphalt .
3 - Installation of sewage network along the 10 km diameters variable (200 mm & 250 mm).
4 - Major sewage line connecting the two lines executing a diameter of 400 mm length 5 km.
5- Implementation of 480 catch basin in the project.

INFRASTRUCTURE ENGINEER à SAUDI PAN KINGDOM CO. LTD
  • Arabie Saoudite - Riyad
  • juillet 2013 à novembre 2013

CONTRACT NO, 10 WITH NATIONAL WATER COMPANY
PROJECT : STRATEGIC TANK IN RIYADH
CONSULTANT : KHATIB & ALAMY
PROJECT DURATION : 2 YEARS
CAST : +122 MILLION SAUDI RIYALS
DESCRIPTION OF THE PROJECT :
50, 000 CUBIC METER SQUARE TANK
50, 000 CUBIC METER RECTANGULAR TANK
10, 000 CUBIC METER RECTANGULAR TANK
5, 000 CUBIC METER CIRCULAR TANK
AND ALSO 2 PUMP STATION
I have in-charge of the 5, 000 CUBIC METER CIRCULAR TANK, but the municipality has stopped us cause of complaint citizens. Then I transfer to anther project

INFRASTRUCTURE ENGINEER à SAUDI PAN KINGDOM CO. LTD
  • Arabie Saoudite - Jeddah
  • mai 2012 à juillet 2013

JEDDAH STORM-WATER DRAINAGE PROJECT ( JSDP )
SAUDI ARAMCO PROJECT
CLINT : SAUDI ARAMCO
CONSULTANT : AECOM LTD, SNC LAVALIN LTD
EASTERN CHANNEL
CAST : 751+ MILLION RIYALS
LENGTH : 21 KM
PROJECT DURATION : 9 MONTHS
CONCRETE : 250, 000+ CUBIC METER
EXCAVATION : 3.5+ MILLION CUBIC METER
Work as Infrastructure engineer in 7 km length of open trapezoidal channel, under me 2 site engineers and more than (20 foreman, 200 carpenter, 300 steel fixer, 100 labor, 100 mason & heavy equipment like ( bulldozer D9, Pay Loader 966, excavator Caterpillar 320, 349 and other heavy equipment )
more than 15 activity.

* I chosen by the company as the best project engineer *

SITE ENGINEER (civil work) à AL-RAI ENGINEERING CONSULTANTS
  • Arabie Saoudite - Riyad
  • janvier 2010 à avril 2012

Quantity Consultant Engineer .
Responsable for quantity of 4 project

Site Consultant Engineer .
Supervising the implementation of:
1- Sewage systems along the 30 km diameters (200 mm and 250 mm) Shaqraa province.
2- A major sewage line along the 15 km diameter of 350 mm.
3- Water networks 40-km-long diameters (110 mm and 160 mm) of Polyethylene HDPE & PVC pipes.
4- A major water line length of 25 km of 250 mm diameter Ductile Iron (DI).
5- Ground water tank project utmost 2, 000 cubic meters .

SITE ENGINER (civil work) à TALAAT MOSTAFA GROUP, ALEXANDRAI CONSTRUCTION COMPANY - (ACC)
  • Egypte - Le Caire
  • août 2008 à janvier 2010

PROJECT : MADINATY PROJECT.
CONSULTANT : ECG LTD.
PROJECT DURATION : UP TO NOW
CAST : 80 BILLION EGYPTIAN POUNDS

DESCRIPTION OF THE PROJECT :

1. Implementation of network drinking water 57 kilometers in diameter (110 mm -160 mm) UPVC pipes.
2. Implementation of 345 house connection.
3. Implementation of a sewage network length of 106 km in diameter (200 mm -250 mm) CLAY pipes.
4. Implementation transmission line (DI) 300 mm diameter of length 22 km.

SITE ENGINEER (civil work) à THE ARAB CONTRACTORS, OSMAN AHMED OSMAN &Co
  • Egypte - Le Caire
  • juillet 2006 à juillet 2008

PROJECT : THE MEDICAL CENTERS
CONSULTANT : ECG LTD.
PROJECT DURATION : 4 YEARS
CAST : 75 MILLION EGYPTIAN POUNDS

Training while studying for two years at the Arab Contractors Company
1. Implementation of the foundations of the project which is about piles a depth of 30 meters with separate rules
2-Implementation columns
3. Implementation of slabs
4. Extend water pipes to feed the hospital length of 3 km
5-Extension of the sewer line of 1 km length
6. Finishes the initial project of the plumbing and the installation of cutting pipes

Éducation

Baccalauréat, Civil Engineering
  • à Mansoura University
  • juin 2008

Project : Harbor Engineering Grad of Project : Excellent

Specialties & Skills

Internet
AutoCAD
Microsoft Office (Word - Excel)
ENGINEERING
Project Managment
STRATEGIC
Planning
Materials
Project Execution
Project Supervision

Langues

Anglais
Moyen
Arabe
Langue Maternelle

Formation et Diplômes

Certification Graduation In Arabic (Certificat)
Date de la formation:
June 2008
Certification From Al Rai (Certificat)
Date de la formation:
April 2012
Certification Graduation In English (Certificat)
Date de la formation:
June 2008
Certification From PARSONS (Certificat)
Date de la formation:
November 2016
Certification from SAPAC (Certificat)
Date de la formation:
November 2016
Certification From ACC (Certificat)
Date de la formation:
January 2010

Loisirs

  • internet, reading