Planning Section Head
Hassan Allam construction
Total years of experience :9 years, 5 Months
Projects :-
1-SwanLake Residence project-New Cairo (Current)
2-Aeon Towers project (20 floors /3 towers) -6 October
3-Suze Canal Bank HQ project -New Capital
Responsibilities :
*Preparation Planning Packages and enhancing the schedule before submission.
*Review Baselines, updates, and all XER files are as planning standards.
*Collect periodic updates and prepare daily, weekly and monthly updates of the project.
*Create variance reports (Schedule Variance and Cost Variance - usually Earned Value Method (EMV) is used for this) at various stages of the project to analyses deviations.
*Calculate Optimal Material requirement, Manpower Requirement for each stage of the project
* Cover site team responsibilities and requirements such as micro schedule.
* Prepare monthly and weekly planning presentations and reports for project control departments and client.
* Coordinate with the client to ensure efficient execution for the project .
* Plan for the budget required for the project and monitor expenses as the project is executed
* Preparation extension of time claims, recovery and revised schedules.
* Involving/Preparing the project correspondences.
* Prepare required presentation for the Top Management.
Project: New Opera House -New Capital (Fast Track Project) .
Consultant: Engineering Consultants Group (ECG).
•Preparation Planning Packages and enhancing the schedule before submission.
•Review Baselines, updates, and all XER files are as planning standards.
•Collect periodic updates and prepare daily, weekly and monthly updates of the project.
•Create variance reports (Schedule Variance and Cost Variance - usually Earned Value Method (EMV) is used for this) at various stages of the project to analyses deviations.
•Calculate Optimal Material requirement, Manpower Requirement for each stage of the project
•Cover site team responsibilities and requirements such as micro schedule.
•Prepare monthly and weekly planning presentations and reports for project control departments and client.
•Coordinate with the client to ensure efficient execution for the project .
•Involving/Preparing the project correspondences.
•Prepare required presentation for the Top Management.
Project: New Opera House -New Capital (Fast Track Project) .
Consultant: Engineering Consultants Group (ECG).
•Assist the project director in project integration management to ensure the development of
the project management plan within a cohesive link.
•Review project’s drawings to insure that all drawings used in site were approved for constructions.
•Following the concrete and finishing works production on site.
•Following up all the technical pending approval by Owner/consultant (according to Priorities).
•Following up all the pending activities/issues with the related different departments (Technical Office (civil/arch. /MEP), Quality, Procurement, Method of statements, Formworks, Planning, Cost, Contract, Quantities, and Safety).
•Following up all the pending activities/issues with the related different department.
•Coordinate with planner for revised schedule and resource allocation.
•Coordinating, following up the progress and provide support to departments when it is required.
•Responsible for all the suppliers on site starting from the tendering stage till the S/C Reclosing.
•Holding meetings on weekly basis with the site focal persons to organize and coordinate the planned weekly progress.
•Involving/Preparing the project correspondences.
•Preparing presentations and reports to update senior management on project’s progress and show case the project’s value.
Project: Al-Masa Hotel -New Capital (Fast Track Project) .
Consultant: Engineering Consultants Group (ECG).
•Preparing architectural drawings of (Block work, reflected ceiling, flooring, and elevations-etc.).
•Submitting shop drawings in coordination with all trades and pointing out all conflicts.
•prepare RFIs for all missing, unclear, conflicting arises during construction.
•Responsible for following up with subcontractor’s contracts, schedules, cost, activities and SD.
•Prepare shop drawings in coordination with all trades for all kitchens in hotel.
•Following Site progress and ensure it is complying with shop drawings.
•Prepare detailed coordination drawings between different trades (civil, MEP).
•Prepare and follow-up for variation order under the supervision of the technical office Manager.
•Prepare As-built drawings and handover to the project consultant.
•Preparation Method statement and pre-qualification for sub-contractors and submission.
•Package Manager of (Glazing / Wooden Flooring) for all project.
Project: Var. Projects
•Supervising the construction process for all skeleton & finishing works.
•Technical responsibilities for all Site activities.
•Scheduling for the project’s activities.
•Creating frameworks to measure the project's metrics and data collection.
•Cooperating and communicating with the project manager and other project participants and collaborating with senior engineers to create more efficient project methods and to maintain the project's profitability.
•Reviewing the engineering tasks and initiating the necessary corrective actions
• Bachelor of Science in Architectural Engineering- faculty of engineering, El-Sharouk Academy. Grade: Good 70% (2009- 2014). • Graduation project: International Culture center &Art City in New Administration Capital Grade: Excellent 95% (2014).