محمد صلاح أحمد, Project Manger

محمد صلاح أحمد

Project Manger

Al-Baik Food System Co.

البلد
المملكة العربية السعودية - الرياض
التعليم
بكالوريوس, Civil Engineering
الخبرات
12 years, 7 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :12 years, 7 أشهر

Project Manger في Al-Baik Food System Co.
  • المملكة العربية السعودية - بريدة
  • أشغل هذه الوظيفة منذ مارس 2016

Responsible For Management All Scope Of Work From Design Office Selection Till Hand Over The
Restaurants, Passing On Contractors Selection For All Scope Of Work (Architectural Finishes -
Plumbing - Electrical - HVAC - Fire Fighting, Fire Alarm, and Security Systems).

Technical Office Engineer في Building Roots EST.(Saudi Binladen Group)
  • المملكة العربية السعودية - جدة
  • يونيو 2014 إلى فبراير 2016

-Review design drawings and make any required modification.
- Lead drafting team to produce shop drawings & bar bending Schedules.
-Coordinate with site team to solve any technical problem they had faced.
-Attend meetings with consultant to approve any modification according to site requirements.
-Lead drafting team to produce as-build Drawing and follow up with consultant to get it approved.

Duties:
- Participated in the preparing of Shop Drawing.
- Preparing of Bar Bending Schedule.
- Quantity Survey and BOQ preparing.
- RFI’s Preparing For The Technical Problems or The missing Information Related To The Design Drawings.

Projects:
1. Utilities Tunnel and Elevated Bridge (King Abdul Aziz International Airport (KAIA Project)).
2. Participated in the Preparation Shop Drawings of Check points, Passenger Terminal Building (PTB) (KAIA Project).
3. End all Procedures of As Built Drawings With DAR AL Handasah (KAIA Project).
4. King Faisal Specialist Hospital (KFSH Project).

Site Engineer (Civil / Architect ) Engineer في Egyptian Naval Academy
  • مصر - الإسكندرية
  • يونيو 2011 إلى يناير 2014

1.Site engineer :-
-Supervision for actual construction on site for concrete works including excavation, foundations, columns & slabs on sites.
-Responsible For a Multidiscipline Design Team Embedded Within a Project, Supporting Both Front End Design and Onsite Installation and Commissioning.

2.Technical Office Engineer :-
-Review design drawings and make any required modification.
- Lead drafting team to produce shop drawings & bar bending Schedules.
-Coordinate with site team to solve any technical problem they had faced.
-Attend meetings with consultant to approve any modification according to site requirements.
-Lead drafting team to produce as-build Drawing and follow up with consultant to get it approved.
Duties:
- Preparing of Reports to The Project Manager Regarding Monthly Progress Of Work &
Other Items Which may Hamper Projected Time Completion.
- Preparing of Payments matters for our Est. and Contracts Preparing For Subcontractors.
- Conformity of Quantities with Technical Office & Follow up the Incomplete Items With them.
- Arrangement Suppliers To Deliver On Site as Per Schedule.
- Preparing Variation Orders as Site Conditions.
Projects :
1. Restoration and upgrading students and soldiers buildings in the Egyptian Naval College.
2. Build up and finishing a Residential units in EL Mahrosa Hotel.
3. Build up a Steel Structural Building in Marines Units.

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في Alexandria University
  • مايو 2011

My Project Was in Materials with Excellent Grade

Specialties & Skills

AutoCAD
Microsoft Office
SAP2000
Autocad, Sap2000,ETABS , SAFE , Revit ,Word , Excel
Sructural Desgin

اللغات

الانجليزية
متوسط

التدريب و الشهادات

Bridges and Roadways (تدريب)
معهد التدريب:
Societe Egyptienne D'entreprises (Moukhtar Ibrahim)
تاريخ الدورة:
June 2009

الهوايات

  • Football