Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Mohamed Sobhi Yassein, Sr. Quality Manager

Mohamed Sobhi Yassein

Sr. Quality Manager·UCC Holding

Saudi Arabia

Bachelor's degree, Civil Engineering

Work experience

Total years of experience: 20 years, 11 months

Sr. Quality Manager

January 2025 - Present

UCC Holding

Riyadh, Saudi Arabia

January 2025 - Present

Project: Wadi Safar-Super package- Chedi hotel & Branded Residence
Client: Diriyah Company
PMC: ElisDon
CSC: V3 International
Contractor: BUJV (Al-Bawani/UCC Joint venture)
Contract Values: 1 billion SAR
Project Scope:
• Ultra Luxury hotel overseeing the Wadi Safar Golf Course with a plot area of 242, 088 m2.
The hotel offers 85 guestrooms and 20 branded residences villas in addition to a variety
of restaurants, wellness Centre, kids center and business center.
• The scope includes construction, testing & commissioning, and handing over,
including mobilization and site set up, enabling and bulk earthworks, sub-structure,
superstructure, finishes, utilities, utility facilities, landscaping

Company industry:
Construction & Building
Job role:
Construction and Building

Quality Manager

January 2024 - January 2025

Al Ayuni Investment & Contracting Co

Riyadh, Saudi Arabia

January 2024 - January 2025

QA/ QC Manager Approval by Diriyah Gate Co, Jacobs & AECOM
From Jan, 2024 to Present
Project: Diriyah Gate II Infra package-I
PMC: AECOM
CSC: Jacobs
Value: 2 Billion SAR
Project Scope:
•Pedestrian underpass, MV & Storm water culverts
•Infrastructure utilities (storm, potable, sewer and irrigation, MV, LV & telecom).
•Potable water Pump stations & Sewerage Lift station.
•Road works
Responsibilities
•Prepare/Revise Project Quality Plan, Inspection Typical plans & check lists (ITP & IC) for Approval.
•Coordinate/follow up with all QC engineers / inspectors to perform site activities inspections & their job duties.
•Review & Monitor all QC Daily, weekly QC reports.
•Preparation of QC monthly Report.
•Identification for Non-Conformities (NCRs, QAN and CANs) and working for closure of all.
•Producing bi-weekly and monthly reports for KPI`s (Key Performance Indicator) of project such as statistical analysis of NCR`s (time between opening and closing of NCR`s, Root causes of NCR`s and preventive actions)
•Make sure that the quality records/documents including redline Drawings are well maintained and up to date.
•Provide assistance and technical proposals recommendation to contractor Key personal to developed immediate solution of sit problems encounter to avoid delay of progress and schedule.
•Prepare & Review All Materials submittals & samples to assure compliance with project specifications.
•Monitor All Calibration certificates for inspection Equipment/ Device and Validate if Any.
•Following up with supplier's for Required TDS & MSDS and related test reports.
•Site visit continuously in weekly basis to ensure that work is carried out as per client's specifications, approved method of statement and approved shop-drawings.
•Review the 3rd party laboratory test results, FAT & SAT and manage submission procedure with consultant.
•Liaison with consultant & client representatives.
•Work on Handing over Procedures & Closing Out Documentation.
•Review of procurement plan, Identify Long & Short lead Item & Ensure that all LLI's (Long Lead Items) already requested early to assure no delay in progress and review all PO's / RFQ's etc.
•Scope verification at each stage of execution with the Project Construction Manager & Superintendent Engineers
•Evaluation of sub-contractors / suppliers / manufacturers and guarantee the usage of the proper comparison sheets regard their quotations.
•Organizing & attending (mandatory) the external coordination meetings (for tie-in points) with other neighbor projects, Contractors, Client and End Users.
•Prepare Handing over, testing & commission Plan, O& Manuals & working on snag/punch list and all handing over documentation

Company industry:
Construction & Building
Job role:
Construction and Building

QA/QC Manager

July 2021 - January 2024

Al-Ayuni Investment & Contracting Company

Medina, Saudi Arabia

July 2021 - January 2024

QA/ QC Manager Approval by RAM, KEO & HILL From 2021 to Present
Project Manager Deputy- Acting Project Manager during absence of Project Manager
Project: The Construction of infrastructure works in Rua Al Madinah project- advance Package Client: Rua Al Madinah Holding
TSC: KEO International
CSC: Hill International
Value: 500 Million SAR
Project Scope:
•Bulk Excavation works (including Rock blasting), Shoring and dewatering works
•Carriage way tunnel & Utilities tunnels
•Infrastructure utilities (storm, potable, sewer and irrigation, MV, LV, telecom, instrumentations and traffic signals).
•Diversion works (HV, MV, Sewer and Potable networks)
•Substation & Lift station building.
•Road works and parking areas development & Landscape works.
Responsibilities

•Prepare/Revise Project Quality Plan, Inspection Typical plans & check lists (ITP & IC) for Approval.
•Coordinate/follow up with all QC engineers / inspectors to perform site activities inspections & their job duties.
•Review & Monitor all QC Daily, weekly QC reports.
•Preparation of QC monthly Report.
•Identification for Non-Conformities (NCRs, QAN and CANs) and working for closure of all.
•Producing bi-weekly and monthly reports for KPI`s (Key Performance Indicator) of project such as statistical analysis of NCR`s (time between opening and closing of NCR`s, Root causes of NCR`s and preventive actions)
•Make sure that the quality records/documents including redline Drawings are well maintained and up to date.
•Provide assistance and technical proposals recommendation to contractor Key personal to developed immediate solution of sit problems encounter to avoid delay of progress and schedule.
•Prepare & Review All Materials submittals & samples to assure compliance with project specifications.
•Monitor All Calibration certificates for inspection Equipment/ Device and Validate if Any.
•Following up with supplier's for Required TDS & MSDS and related test reports.
•Site visit continuously in weekly basis to ensure that work is carried out as per client's specifications, approved method of statement and approved shop-drawings.
•Review the 3rd party laboratory test results \[NDT\] and manage submission procedure with consultant.
•Liaison with consultant & client representatives.
•Work on Handing over Procedures & Closing Out Documentation.
•Review of procurement plan, Identify Long & Short lead Item & Ensure that all LLI's (Long Lead Items) already requested early to assure no delay in progress and review all PO's / RFQ's etc.
•Scope verification at each stage of execution with the Project Construction Manager & Superintendent Engineers
•Evaluation of sub-contractors / suppliers / manufacturers and guarantee the usage of the proper comparison sheets regard their quotations.
•Attending the internal coordination meeting in weekly basis between the project different divisions (Civil, Architect and MEP.) to assure that the final coordination shop-drawing is correct.
•Organizing & attending (mandatory) the external coordination meetings (for tie-in points) with other neighbor projects, Contractors, Client and End Users to ensure Co. rights & to record it in MO

Company industry:
Civil Engineering
Job role:
Quality Control

QA/QC Manager

July 2020 - July 2021

Al-Ayuni Investment & Contracting Company

Jeddah, Saudi Arabia

July 2020 - July 2021

❷ QA/QC Manager - MODON/WORLEY Approval
at Al-Ayuni Investment & Contracting Company
July 2020 till July 2021
Project: MODON OASIS-04 in JEDDAH Infrastructure Packages (Potable, Irrigation, Sewer, Storm, Telecom, LV, MV, Lift Station)
Client: MODON Consultant: WORLEY Project
Value: 210 Million SAR
Project Scope:
•Infrastructure utilities (storm, potable, sewer and irrigation, MV, LV, telecom, instrumentations and traffic signals).
•Substation & Lift station building.
•Road works and parking areas development & Landscape works
Responsibilities:
•Prepare/Revise Project Quality Plan, Inspection Typical plans & check lists (ITP & IC) for Approval.
• Coordinate/follow up with all QC engineers / inspectors to perform site activities inspections & their job duties.
• Review & Monitor all QC Daily, weekly QC reports.
• Preparation of QC monthly Report.
• Identification for Non-Conformities (NCRs, QAN and CANs) and working for closure of all.
• Make sure that the quality records/documents including redline Drawings are well maintained and up to date.
• Provide assistance and technical proposals recommendation to contractor Key personal to developed immediate solution of sit problems encounter to avoid delay of progress and schedule.
• 8- Prepare & Review All Materials submittals & samples to assure compliance with project specifications.
• Monitor All Calibration certificates for Equipment/ Device and Validate if Any.
• Following up with supplier’s for Required TDS & MSDS and related test reports.
Site visit continuously in weekly basis to ensure that work is carried out as per client’s specifications, approved method of statement and approved shop-drawings.
• Liaison with consultant & client representatives.
• Work on Handing over Procedures & Closing Out Documentation.
• Attending the internal coordination meeting in weekly basis between the project different divisions (Civil, Architect and MEP.) to assure that the final coordination shop-drawing is correct.
• Organizing & attending (mandatory) the external coordination meetings (for tie-in points) with other neighbor projects, Contractors, Client and End Users to ensure Co. rights & to record it in MOM.

Company industry:
Construction & Building
Job role:
Construction and Building

QA/QC Manager

December 2017 - July 2020

Haider Saleh Alhaider & Partner CO. (HSH)

Jubail, Saudi Arabia

December 2017 - July 2020

QC Manager - ROYAL COMMISSION APPROVAL
Acting Project Manager during absence of PM and Provide assistance for Project Manager
Project: 575-C35 (Construction of Irrigation Pump Station and 2 Steel tanks 85 m dia., Site Utilities, Thrust Boring and HDD).
Client: ROYAL COMMISSION IN JUBAIL-
Project Value: 175 Million SAR
Project Scope:
•API 650 Irrigation Steel Tanks 85 m dia
•Infrastructure utilities (storm, potable, sewer and irrigation, MV, LV, telecom, instrumentations and traffic signals).
•Substation & Lift station building.
•Road works and parking areas development & Landscape works
Responsibilities:
• Prepare Project Quality Plan, Inspection Typical plans & check lists (ITP & IC) for RC Approval.
• Study IFC. drawings and tender/contract documents to understand scope of works
• Prepare Technical Submittal plan including Materials, MS and ITPs & Review all prior official Submission to client.
• Coordinate/follow up with all QC engineers / inspectors to perform site activities inspections & their job duties.
• Review & Monitor all QC Daily, weekly QC reports.
• Preparation of QC monthly Reports (Hold Points, NCRs & QAN, CANs).
• Provide training for Key personnel and staff for all RC Quality Procedures.
• Identification for Non-Conformities (NCRs, QAN and CANs) and working for closure of all.
• Documenting all inspections and tests as required by the Quality Plan and contract procedures.
• Make sure that the quality records/documents including redline Drawings are well maintained and up to date.
• Provide assistance and technical proposals recommendation to contractor Key personal to developed immediate solution of sit problems encounter to avoid delay of progress and schedule.
• Monitor Daily Inspections for different activities at jobsites to ensure all will be done in accordance with the time frame.
• Prepare & Review All Materials submittals & samples to assure compliance with project specifications & perform routine Material inspections.
• Monitor All Calibration certificates for Equipment/ Device and Validate if Any.
• Coordination with Civil testing agencies / batching plants for in tine delivery of concretes and subsequent inspection & testing requirements
• Following up with supplier’s for Required TDS & MSDS and related test reports.
• Formulate the FCD’s. & TQ’s. with Superintendent Engineers to assure that client’s engineering department will understands the issue, and to guarantee Co. full rights for any
• changes in specifications (not comply the pay item description)
• Discuss with RC for any conflicts or proposal prior to submitting officially as TQ, FCD.
• Site visit continuously in weekly basis to ensure that work is carried out as per client’s specifications, approved method of statement and approved shop-drawings.
• Scope verification at each stage of execution with the Project Construction Manager & Superintendent Engineers
• Evaluation of sub-contractors / suppliers / manufacturers and guarantee the usage of the proper comparison sheets regard their quotations.
• Review of internal project schedules (Baseline schedule / Three-month look-ahead schedule / One-month look-ahead schedule / Annual Forecast Cash-In Flow / Annual Forecast Cash-Out Flow / etc.).
• Liaison with consultant & client representatives (RE. & ARE).
• Review of procurement plan, Identify Long & Short lead Item & Ensure that all LLI’s (Long Lead Items) already requested early to assure no delay in progress and review all PO’s / RFQ’s etc.
• Work on Handing over Procedures & Closing Out Documentation.
• Attending the internal coordination meeting in weekly basis between the project different divisions (Civil, Architect and MEP.) to assure that the final coordination shop-drawing is correct.
• Organizing & attending (mandatory) the external coordination meetings (for tie-in points) with other neighbor projects, Contractors, Client and End Users to ensure Co. rights & to record it in MOM.

Company industry:
Construction & Building
Job role:
Construction and Building

QC Manager

July 2015 - December 2017

SAUDI ARABIAN TRADING & CONSTRUCTION COMPANY (SATCO)

Saudi Arabia

July 2015 - December 2017

QC Manager Approval by Royal Commission From 2015 to 2017 Project: RC 627-C21R (Construction of 4 Schools for RC)
Client: ROYAL COMMISSION IN JUBAIL Project Value: 175 Million SAR
Project Scope:
•Schools buildings construction including all finishing works
•MEP works including BMS system, fire alarm, firefighting and access control
•Spaceframe steel structure.
•FIFA certified football playground.
•Multi-purpose hall (Volleyball, Basketball & Handball playgrounds)
Responsibilities:
•Coordination with all QC engineers / inspectors to perform site activities inspections & their job duties.
•Review & Monitor all QC Daily, weekly QC reports.
•Preparation of QC monthly Reports (Hold Points, NCRs & QAN, CANs).
•Identification for Non-Conformities (NCRs, QAN and CANs) and working for closure of all.
•Documenting all inspections and tests as required by the Quality Plan and contract procedures.
•Make sure that the quality records/documents are well maintained and up to date.
•Coordination with project Engineers & Construction mangers on technical issues and inspections.
•Prepare Project Quality Plan, Inspection Typical plans & check lists (ITP & IC) & method statements for RC Approval.
•Provide assistance and technical proposals recommendation to contractor Key personal to developed immediate solution of sit problems encounter to avoid delay of progress and schedule.
•Monitor Daily Inspections for different activities at jobsites to ensure all will be done in accordance with the time frame.
•Prepare & Review All Materials submittals & samples to assure compliance with project specifications & perform routine Material inspections.
•Monitor All Calibration certificates for Equipment/ Device and Validate if Any.
•Coordination with Civil testing agencies / batching plants for in tine delivery of concretes and subsequent inspection & testing requirements
•Following up with supplier's for Required TDS & MSDS and related test reports.
•Discuss with RC for any conflicts or proposal prior to submitting officially as TQ, FCD
•Work on Handing over Procedures & Closing Out Documentation.

Company industry:
Construction & Building
Job role:
Quality Control

QC Supervisor / QC Inspector

November 2012 - July 2015

DRAKE & SCULL CONSTRUCTION INTERNATIONAL

Riyadh, Saudi Arabia

November 2012 - July 2015

QC Supervisor / QC Inspector-SAUDI ARAMCO Approval at DRAKE &SCULL CONSTRUCTION INTERNATIONAL
NOVEMBER, 2012 TILL July, 2015
Project: KAPSARC (King Abdullah Petroleum Studies & Research Centre).
Client: SAUDI ARAMCO-
Project Value: 4 Billion SAR
Project Scope: please visit KAPSARC Website
Responsibilities:
• Coordination with all QC engineers / inspectors to perform site activities inspections & their job duties.
• Review & Monitor all QC Daily, weekly QC reports.
• Preparation of QC monthly Reports (RFIs, NCRs & Client Violations).
• Identification for Non-Conformities (NCRs, LBE, Client violation & Proactive notifications) and working for closure of all.
• Coordination with the MEP Contractor & their QCs for work permit &Clearances to start the civil & finishing activities.
• Coordination with project Engineers & Construction mangers on technical issues and inspections.
• Prepare Project Quality plan, Inspection Typical plans & check lists (ITP & IC) & method statements for Consultant’s Approval.
• Provide assistance and technical proposals recommendation to contractor Key personal to developed immediate solution of sit problems encounter to avoid delay of progress and schedule.
Monitor different activities at jobsites to ensure all will be done in accordance with SAEP &
• SAES and Project Specifications.
• Review Materials submittals & samples to assure compliance with project specifications & perform routine Material inspections.
• Coordination with Civil testing agencies / batching plants for in tine delivery of concretes and subsequent inspection & testing requirements
• Coordination with PID during site inspections and ensure that all comments will be rectified where necessary.
• Attending all QC & construction & Management meetings for proper coordination between all departments to improve work progress.
• Following up daily site activities & performs site (Civil & all interior Finishing) inspections to ensure that works have been carried out in accordance with construction drawings, Contract specification & Method statements.
• Perform inspection for closing out snag lists prior final handing over.

Company industry:
Construction & Building
Job role:
Quality Control

Senior QA/QC Engineer- Civil & Infrastructure Inspector

January 2009 - October 2012

DR/ M.H.ALI ALSAIE Consulting Engineer

Abu Dhabi, United Arab Emirates

January 2009 - October 2012

Senior QA/QC Engineer- Civil & Infrastructure Inspector at DR/ M.H.ALI ALSAIE Consulting Engineer, Abu Dhabi, United Arab Emirates
JANUARY, 2009 TO OCTOBER, 2012

Projects: Projects value: 2 Billion AED
A- AL Reef Villas (Superstructure & Infrastructure project) - Client: MANAZEL
B- Relocation of ADDC & TRANSCO water pipelines- Client: ADDC& TRANSCO
C- Soil Investigation at ALTAWEELA (B) Power Plant- Client: TAPCO.


A- AL Reef Villas (Superstructure & Infrastructure project) - Client: MANAZEL
• 1- Supervising the Following Site Activities for construction of 100 Villas at Arabian village:
a) Excavation.
b) Blinding conc. and its associated water proofing.
c) Reinforced Concrete Works (Formwork & Rebar for Base Slabs, Walls, Columns,
d) Slab on Grade & Roof Slabs including all Types of Concrete Joints…etc.
e) Block works.
f) All finishing works (plaster, ceiling, painting, flooring…. etc.).
• 2- Supervising the Following Site Activities for Potable Water & Sewerage Pipelines / Networks:
a) Excavation.
b) Pipe Bedding.
c) Compaction Tests.
d) Piping Works (Ductile Iron, HDPE, PVC & GRP Pipes & installing all associated Fittings).
e) Welding of HDPE & MDPE Pipes.
f) Installation of Valves and Fittings (Line, washout, Air Release, Flow meter, Bulk
g) Consumer & Flow Control Valve Chambers).
h) Formwork, Rebar and Concrete Pouring of Valve chambers, Thrust Blocks,
i) Sewerage manholes and Protection Slabs...etc.
j) Hydrostatic Pressure Test & Air test.
k) Non-Disruptive Road Crossing (NDRC) using Horizontal Direction Drilling
l) Technique.
m) Flushing, Disinfection, Shutdowns, Tie-in Connections…etc.
n) Reinforced concrete Irrigation Tank (Ground Tank)
• 3- Reviewing the Following Contractor’s Submittals:
a) Drawings: (Construction drawings, Shop Drawings, Field Changes, As-Built
b) Drawings, Formwork Drawings …etc.).
c) Materials: (HDPE, GRP & D.I. Pipes/Fittings, Conc.
d) Components/Protection/Repair/Curing Materials, Water stop, Grouts, Water
e) Proofing, Joint Fillers, Sealants, Manhole’s Covers, Aluminum Ladders…etc.).
f) Reports: (Material’s Delivery Reports, Weekly/Monthly Progress Report, Incident

• 4- Witnessing of The Following Site Tests:
a) Concrete Tests (Trail Mixes, Slump, Cube Crushing, Temp... etc.).
b) Pipe’s Hydrostatic Pressure test and Air test.
c) Compaction Test (Sand Cone).
d) Coating’s Tests (DFT, WFT, Etc...).

B- Relocation of ADDC & TRANSCO water pipelines- Client: ADDC& TRANSCO
Responsibilities:
• 1- Supervising The Following Site Activities for Potable Water & Sewerage Pipelines / Networks:
a) Excavation.
b) GRP/ Concrete Ducts.
c) Compaction Tests.
d) Piping Work (Ductile Iron, Carbon Steel pipes).
e) Formwork, Rebar and Pouring of Valve chambers, Thrust Blocks, Line anchor and Protection Slabs...etc.
f) Hydrostatic Pressure Test.
g) Backfilling.
h) Flushing, Disinfection and Shutdown for 4NOS. of Tie-in Connections…etc.
• 2- Reviewing the Following Contractor’s Submittals:
a) Drawings: (Construction drawings, Shop Drawings, Field Changes, As-Built
c) Materials: (GRP & D.I. Pipes/ Fittings, Conc. Components/ Protection /Repair/
d) Curing Materials, Water stop, Grouts, Water Proofing, Joint Fillers, Sealants,
e) Manhole’s Covers, Aluminum Ladders…. etc.).
f) Reports: (Material’s Delivery Reports, Receiving Cum damage Reports
g) Weekly/Monthly Progress/construction Reports …etc.).
h) Method Statements: (Excavation, Backfilling, Concreting, Finishing, Pipe’s
i) wrapping / installation /Testing, Construction sequence, Diversion of Existing
j) Utilities, Concrete Pouring Arrangement, Concrete Repairs, Flushing and
k) Disinfection, Tie in connections…etc.).

Company industry:
General Engineering Consultancy
Job role:
Consulting

Site Engineer & Project Engineer

January 2007 - April 2009

ADVANCED ENGINEERING

Medina, Saudi Arabia

January 2007 - April 2009

❼ Site Engineer & Project Engineer
at ADVANCED ENGINEERING PROJECTS, AL MADINA AL MUNAWARA, KSA
APRIL, 2007 TO JANUARY, 2009

• 1-Responsible for implementation the Following site activities in accordance with project requirements: -
a. Excavation.
b. Blinding conc. and its associated water proofing.
c. Reinforced Concrete Works (Formwork & Rebar for Base Slabs, Walls, Columns, Slab on Grade & Roof Slabs including all Types of Concrete Joints…etc.
d. Block works.
e. All finishing works (plaster, ceiling, painting, marble, tiles, raised floors, wall
Decoration, wooden & aluminum doors and windows …. etc.).
• Estimates, prepares and assigns the resources such as manpower, materials, consumables, equipment, tools… etc., required for all civil works prior to execution.
• Interprets construction drawings and studies the contract documents and applicable standards or specifications prior to execution of any jobs.
• Manages directly and provide engineering and technical supports to all the civil work groups & subcontractors at site.
• Inspection of all subcontractor works and preparation of their payments.
• Coordinates with Client / Consultant’s representatives for any site instructions and inspection of works.
• Submits site daily reports, inspection requests, estimates and all applicable monitoring reports.
• Ensures that all the works done are in accordance with the approved construction drawings, contract documents, project specifications, and all applicable standards.

Company industry:
General Engineering Consultancy
Job role:
Civil Engineering

Site Engineer & Project Engineer

August 2005 - April 2007

NAWWARA Contracting Company

Cairo, Egypt

August 2005 - April 2007

8 Site Engineer- Project Engineer at NAWWARA EGYPT, CAIRO, EGYPT
From 2005 to 2007

Project:
A- Construction of AL NOR Islamic Complex
B- Construction of (3) buildings consists of 10 floors.
C- Construction of (4) Villas.

• Responsible for implementation the Following site activities in accordance with project requirements: -
o Excavation.
o Blinding conc. and its associated water proofing.
o Reinforced Concrete Works (Formwork & Rebar for Base Slabs, Walls, Columns, Slab on Grade & Roof Slabs including all Types of Concrete Joints…etc.
o Block works.
o All finishing works (plaster, ceiling, painting, marble, tiles, raised floors, wall decoration, wooden & aluminum doors and windows ….etc.).
• Manages directly and provide engineering and technical supports to all the civil work subcontractors at site.
• Ensures that all the works done are in accordance with the approved construction drawings, contract documents, project specifications, and all applicable standards.
• Inspection of all subcontractor works and preparation of their payments
• Coordinates with Client / Consultant’s representatives for any site instructions and inspection of works.
• Ensures that all the works done are in accordance with the approved construction drawings, contract documents, project specifications, and all applicable standards.

Company industry:
Construction & Building
Job role:
Construction and Building

Education

Mansoura University

August 2005

August 2005

Bachelor's degree, Civil Engineering

Egypt

GPA (percentage): 57%

GPA (percentage): 57%

Civil Engineering, Sewerage and Potable infrastructure networks
View attachment

Skills

Construction
Expert
Construction
Expert
Management
Expert
Management
Expert
Quality Systems
Expert
Quality Systems
Expert
civil engineer
Expert
civil engineer
Expert
Finishing
Expert
Finishing
Expert
CONSTRUCTION
Expert
CONSTRUCTION
Expert
INFRASTRUCTURE
Expert
INFRASTRUCTURE
Expert
INVESTIGATION
Expert
INVESTIGATION
Expert
IRRIGATION (LANDSCAPING AND AGRICULTURE)
Expert
IRRIGATION (LANDSCAPING AND AGRICULTURE)
Expert
CALIBRATION
Expert
CALIBRATION
Expert
SUBMITTALS (CONSTRUCTION)
Expert
SUBMITTALS (CONSTRUCTION)
Expert
CLOSING (Projects)
Expert
CLOSING (Projects)
Expert
MANAGEMENT
Expert
MANAGEMENT
Expert
Construction
Expert
Construction
Expert
Management
Expert
Management
Expert
Quality Systems
Expert
Quality Systems
Expert
civil engineer
Expert
civil engineer
Expert
Finishing
Expert
Finishing
Expert

Languages

English

Expert

Arabic

Native Speaker

Memberships

Saudi Council of Engineers

Civil Engineer

April 2007

Training and Certifications

Certifications
IRCA/CQI ISO 9001-2015 lead adudier
IRCA/CQI ISO 45001-2018 Lead Auditor

Training
Autocad
Egyptian Engineers Syndicate
Fire Stop Awarrance
Hilti

Hobbies and interests

Reading, Walking, Music & Cinemas