Co-founder - Projects manager
Alashraf contracting.
مجموع سنوات الخبرة :22 years, 9 أشهر
Fining and fit-out subcontractors.
Noor Capital Gardens :
• Noor is new Smart City of fourth generation.
the project consists of Construction of 72 buildings with 6 car parking basements
including landscape and infrastructure works.
•
• All works includes internal and external finishing and all MEP works.
• value is 3.2 Billions EGP.
• Completion date is June 2026
Construction of Extension of 4 seasons Hotel. consists of 94 Guest rooms, 48 Chalet, 26 Villas, Resturents, Puplic areas, BOH areas.
total cost of the project is 7.5 billion LE.
Hilton Salwa Resort
• PACKAGE 1 value is QAR 1.6 Billion.
• Designed to become one of the largest resorts and residential projects to be constructed on 257 acres of land in the Middle East, Hilton Salwa Beach Resort & Villas is a massive project that includes a water park, marina, dive center, cinemas, pools, a health club, spa and a considerable retail space. In addition to the rooms and suites in the main hotel building, the resort will also include two small “villages” of family villas.
• Completion date is March. 2019
► Mall of Qatar - Doha
• Project value is $ 820 Million. As per of 2015
• Scope of work Design & Build
• Project Duration 40 Months, Completion Date March, 2016.
• Total Plot Area 286, 264 m² Total Built Up Area 429, 190 m²
► Aspire Park Edutainment Complex KIDZANIA - Doha
Project value is QAR 170 Million. As per of 2016
Scope of work Design & Build
Project Duration 16 Months, Completion Date April, 2017.
Total Plot Area 30000 m² Total Built up Area 15000 m² + external landscaping.
► Project of Development of Security Headquarters ( Directorate, Dormitories and Sports Centers) of the Ministry of Interior - the fourth stage (KAP 4)
• Project value is SR 4.5 Billion.
• Project period 36 month.
• The project scope consists of the construction of 8 new Directorates, 4 Dormitories and 4 Sports Centers at Riyadh.
June 2008 - August.2013
Al Habtoor Leighton Engineering, Abu Dhabi, UAE
PROJECT ENGINEER
► Ritz Carlton Hotel, Abu Dhabi, UAE
• Project value is USD 295 million.
• Project period 60 month.
• The project scope consists of the construction of 10 hotel towers along with car parking, 88 individual chalets, as well as the on-site Venetian Village. The Venetian Village includes 33 apartments, a spa building, a tennis centre, car park and three shaded areas adjacent to the resort’s swimming pools.
► . Arzanah Medical Complex, Abu Dhabi, UAE
• Project value is USD 110 million
• Project period 18 month.
• Project consists of hospital, clinic, energy centre and medical gas storage building along with the landscape.
► Dusit hotel and residential complex, Abu Dhabi, UAE
• Project value is USD 370 million
• Project period 36 month.
• The structure includes a 40-storey hotel tower, a 22-storey serviced apartment building, a 17-storey office building, 18 floors of unfurnished apartments, and three levels of common basements.
March 2007 - June 2008
Alfawzan for construction -Riyadh- Saudi Arabia
PROJECT ENGINEER
► Mohammad Ben Saud University - Girls College
• Project value is USD 370 million
• Project period 48 month.
• Project consists of six buildings, Administration building, multi story car parking along with the landscape.
► Gawhret Alharas Algomhory
• Project value is USD 100 million. As per of 2003.
• Project period 48 month.
• Project consists of eight buildings, Administration building, eight villas, basement car parking, four cinemas.
► New Nasr City towers
• Project value is USD 35 million. As per of 2001.
• Project period 36 month.
• Project consists of eleven buildings and landscaping area.
Working as a site engineer to design and inspect the structural elements made by contractors.
Bachelor Of Engineering, Civil section, Structure Department, Alazhar University (May 2001). VERY GOOD DEGREE Graduation Project In Soil Mechanics & Foundation EXCELLENT DEGREE