محمد Abdelmoez Mohammad, Co-founder - Projects manager

محمد Abdelmoez Mohammad

Co-founder - Projects manager

Alashraf contracting.

البلد
مصر - القاهرة
التعليم
بكالوريوس, civil engineering- structual department
الخبرات
22 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :22 years, 9 أشهر

Co-founder - Projects manager في Alashraf contracting.
  • مصر - القاهرة
  • أشغل هذه الوظيفة منذ يناير 2024

Fining and fit-out subcontractors.

Sr Construction manager في Atrium Quality Contractors
  • مصر - القاهرة
  • مايو 2022 إلى يناير 2024

Noor Capital Gardens :
• Noor is new Smart City of fourth generation.
the project consists of Construction of 72 buildings with 6 car parking basements
including landscape and infrastructure works.

• All works includes internal and external finishing and all MEP works.
• value is 3.2 Billions EGP.
• Completion date is June 2026

Construction Manager في Atrium Quality Contracting ( Part of TMG )
  • مصر - شرم الشيخ
  • أبريل 2019 إلى مايو 2022

Construction of Extension of 4 seasons Hotel. consists of 94 Guest rooms, 48 Chalet, 26 Villas, Resturents, Puplic areas, BOH areas.
total cost of the project is 7.5 billion LE.

Construction Manager في Contraco
  • قطر - الدوحة
  • يونيو 2017 إلى أبريل 2019

 Hilton Salwa Resort
• PACKAGE 1 value is QAR 1.6 Billion.
• Designed to become one of the largest resorts and residential projects to be constructed on 257 acres of land in the Middle East, Hilton Salwa Beach Resort & Villas is a massive project that includes a water park, marina, dive center, cinemas, pools, a health club, spa and a considerable retail space. In addition to the rooms and suites in the main hotel building, the resort will also include two small “villages” of family villas.
• Completion date is March. 2019

Sr. Cosntruction Manager في Urbacon / Alkhayat
  • قطر - الدوحة
  • أغسطس 2015 إلى يونيو 2017

► Mall of Qatar - Doha
• Project value is $ 820 Million. As per of 2015
• Scope of work Design & Build
• Project Duration 40 Months, Completion Date March, 2016.
• Total Plot Area 286, 264 m² Total Built Up Area 429, 190 m²

► Aspire Park Edutainment Complex KIDZANIA - Doha
 Project value is QAR 170 Million. As per of 2016
 Scope of work Design & Build
 Project Duration 16 Months, Completion Date April, 2017.
 Total Plot Area 30000 m² Total Built up Area 15000 m² + external landscaping.

Site Construction Manager في Al-Rashid Trading & Contacting Company – RTCC
  • المملكة العربية السعودية - الرياض
  • أغسطس 2013 إلى أغسطس 2015

► Project of Development of Security Headquarters ( Directorate, Dormitories and Sports Centers) of the Ministry of Interior - the fourth stage (KAP 4)
• Project value is SR 4.5 Billion.
• Project period 36 month.
• The project scope consists of the construction of 8 new Directorates, 4 Dormitories and 4 Sports Centers at Riyadh.

Sr. Project Engineer في Habtoor Leighton Group
  • الإمارات العربية المتحدة - أبو ظبي
  • يونيو 2008 إلى أغسطس 2013

June 2008 - August.2013
Al Habtoor Leighton Engineering, Abu Dhabi, UAE
PROJECT ENGINEER

► Ritz Carlton Hotel, Abu Dhabi, UAE
• Project value is USD 295 million.
• Project period 60 month.
• The project scope consists of the construction of 10 hotel towers along with car parking, 88 individual chalets, as well as the on-site Venetian Village. The Venetian Village includes 33 apartments, a spa building, a tennis centre, car park and three shaded areas adjacent to the resort’s swimming pools.

► . Arzanah Medical Complex, Abu Dhabi, UAE
• Project value is USD 110 million
• Project period 18 month.
• Project consists of hospital, clinic, energy centre and medical gas storage building along with the landscape.
► Dusit hotel and residential complex, Abu Dhabi, UAE
• Project value is USD 370 million
• Project period 36 month.
• The structure includes a 40-storey hotel tower, a 22-storey serviced apartment building, a 17-storey office building, 18 floors of unfurnished apartments, and three levels of common basements.

Project Engineer في Alfawzan for construction
  • المملكة العربية السعودية - الرياض
  • مارس 2007 إلى يونيو 2008

March 2007 - June 2008
Alfawzan for construction -Riyadh- Saudi Arabia
PROJECT ENGINEER

► Mohammad Ben Saud University - Girls College
• Project value is USD 370 million
• Project period 48 month.
• Project consists of six buildings, Administration building, multi story car parking along with the landscape.

Site Engineer Then Senior Site Engineer في Arab Contractors
  • مصر - القاهرة
  • يناير 2002 إلى مارس 2007

► Gawhret Alharas Algomhory
• Project value is USD 100 million. As per of 2003.
• Project period 48 month.
• Project consists of eight buildings, Administration building, eight villas, basement car parking, four cinemas.

► New Nasr City towers
• Project value is USD 35 million. As per of 2001.
• Project period 36 month.
• Project consists of eleven buildings and landscaping area.

Design Engineer في Consulting Office
  • مصر - القاهرة
  • أغسطس 2001 إلى يناير 2002

Working as a site engineer to design and inspect the structural elements made by contractors.

الخلفية التعليمية

بكالوريوس, civil engineering- structual department
  • في Alazhar University
  • مايو 2001

Bachelor Of Engineering, Civil section, Structure Department, Alazhar University (May 2001). VERY GOOD DEGREE Graduation Project In Soil Mechanics & Foundation EXCELLENT DEGREE

Specialties & Skills

Project Work
Working Under Pressure
Construction Engineering
Civil Engineering
► Working under a hard pressure
► Computer Skills: Microsoft Office applications, Flair to AutoCAD. able to prepare all kinds of rep
► Expert in preparing time schedules: capable of preparing the time schedules and estimate the perio
► Expert in concrete detailing: capable of preparing and review concrete details and sketches.
► Expert in team leading: capable of lead and control my team to get the maximum production to execu

اللغات

الانجليزية
متمرّس

العضويات

Member of Egyptian Engineers Association since 2001.
  • 00855/24
  • June 2001
Project Management Institute PMI
  • 4850913
  • March 2017

التدريب و الشهادات

PMP prep. (تدريب)
معهد التدريب:
Amideast
تاريخ الدورة:
February 2017
المدة:
36 ساعة
Microsoft Office (تدريب)
معهد التدريب:
Private
تاريخ الدورة:
April 2004
Occupational Health & safety (تدريب)
معهد التدريب:
Habtoor Leighton Group
تاريخ الدورة:
June 2008
Primavera (تدريب)
معهد التدريب:
American University In Cairo
تاريخ الدورة:
May 2013
Autocad (تدريب)
معهد التدريب:
Private
تاريخ الدورة:
February 1998
Sap2000 (تدريب)
معهد التدريب:
Private
تاريخ الدورة:
March 2001
Training course in civil engineering part One and Two (تدريب)
معهد التدريب:
ARAB CONTRACTORS INSTITUTE
تاريخ الدورة:
March 2002