Project Manager
Aims General Contracting (AGCC)
Total des années d'expérience :10 years, 6 Mois
Engineering & following up the project activates and subcontractors in daily basis to ensure that the project going on the time and quality with satisfying the clients.
The project that aware of:
1. Construction of Western region labor Camps in (MZ, AL Marfa, AL Silla and Ghayathi) 2. Construction of Reception building and FSP Entrance for Zayed University. 3. Construction of the guard house, FM building and pump room in KIZAD with Abu Dhabi Port. 4. Infrastructure, roads and hard scape in in KIZAD with Abu Dhabi Port. 5. Construction of 2 floors residence building and services buildings in CMW Camp.
following up the development of schools in all UAE areas and control the contractors for the time and quality.
The project that aware of:
1. Development of schools in all UAE areas and control the contractors for the time and quality. 2. New construction of class and labs annex for the schools
Typically do the following:
• Quantity survey Engineer: Read drawing and make the Bill of quantity for project as requirements of projects and estimate the quantity for all items in BOQ.
• Planning Engineer: Use Primavera program for prepare the time schedule for projects and ensure that the schedule and built in accordance with plans.
• Road site Engineer: construction of new tow lay bay at Cornich street at Abu Dhabi (KerbStone, interlocking tile and asphalt).
• Landscape Site Engineer: design VIP parking for Nation Riviera Hotel at Cornich Abu Dhabi and coordination with supplier for construct Fence inside hotel.
• Project Engineer: coordination between the projects that aware of, follow up the works at site and estimate the quantity of materials needs for construct the projects and coordination with MEP and Steel Structure sub-contractors to achieve the works and follow up the finishing works. Hand over the works for Municipality and final handing over for projects to Municipality.
The project that aware of:
1. Design and built of tow lay bay at Cornich Street.
2. Design and built of VIP parking and fence at Nation Riviera Hotel.
3. Maintenance work of Restaurant at Abu Dhabi.
4. Construction of offices and workshops for Steel Factory at ICAD II.
5. Extension of offices for Chemical factory contains two floors.
6. Construction of steel Structure Pipe Rack and concrete foundations for the steel structure and Tanks.
7. Construction of Gym and Swimming Pool at Military Camp.
8. Construction of the many units and foundations in Ittihad Paper Mill Factory at ICAD III.
B.Sc. in Civil Engineering-An-Najah National University Nablus-Palestine (May 2013)