Consultant Engineer ( rehabilitation of building project)
SFD
Total years of experience :9 years, 7 Months
preparing Environmental plan for
rehabilitation building project
- preparing technical and financial
plan for rehabilitation building
project.
- Managing Engineering teams
and observing teams achievement
rate.
- Calculation of quantities and
preparation of future plans.
- Preparation of the tender
documents and implementation.
- Qualifying the labor to carry out the
work accurately.
- preparing technical and financial
plan.
- Managing paving team and making
roads designs and slope design for
the drainage of rain water for the
historical city of Shibam.
- Calculation of quantities and
preparation of future plans.
- Supervising paving roads works
- Preparation of the tender
documents and implementation.
- Qualifying the labor to carry out the
work accurately.
- preparing technical and financial
plan.
- Designing and Supervising the
Construction works.
- Preparation of the tender
documents and implementation.
- Supervising the Construction works
(Foundations - columns- Slabs ) etc…
-Projection of telecommunication
towers places by using total station
and AutoCad civil 3D .
- Leveling tower site using level
device.
- Supervising the Construction works
(Foundations - columns- steel
structure) etc…
- Participate in the Preparation of the
planning as time plan .
- Preparation of the implementation.
- Preparation of slop design study for
sewage network of Astrowa city using
Total station and level .
- preparing work plan for
rehabilitation & conservation of
irrigation canals .
- Supervising the Construction works
to rehabilitate irrigation channels.
-Preparation of the implementation
and drawings .
- Qualifying the labor to carry out the
work accurately.
- إعداد وثائق المناقصات من (جداول الكميات، والتكلفة التقديرية، والمشاركة في اعداد المواصفات الفنية للتنفيذ، وكذلك تعليمات للمقاول) والمشاركة في إعداد وإخراج الرسومات الخاصة المكون.
- المشاركة في أعمال المسح الميداني لاخذ مناسيب الأرض الطبيعية.
- دراسة مناسيب الأرض الطبيعية و المناسيب التصميمية للرصف.
- عضو لجنة التحليل وترسية المناقصة وعضو لجنة فتح المظاريف بالمكون .
- الإشراف على الأعمال اليومية في الموقع وتدوين الملاحظات وتوجيه المقاول للأعمال الجمالية واسقاط المناسيب التصميمية في الموقع بواسطة جهاز الليفل ( level ) .
- إعداد المستخلصات وخلاصة المستخلصات الخاصة بمكون الرصف .
- Preparing of tenders documents (BOQ, and the estimated cost, and participate in the development of technical specifications for implementation, as well as instructions for the contractor) and participate in the preparation and directed drawings for that component.
- Participation in the work field survey to take the natural ground levels.
- The study of natural levels to make the design levels of paving.
- Member of the opening Envelopes of the component.
- Overseeing the daily working at the site and directing the contractor to do the best view of that site and giving of design levels for the site by using level device.
- Preparation of extracts for the paving component.
عملت في الجمعية مع فريق عمل في كل من الاتي :
- تصميم معماري و انشائي للجسر الغربي بمدينة شبام واعداد الشروط العامة والمواصفات وجداول الكميات والكلفة التقديرية للجسر .
- تصميم انشائي لعبارة متوسطة الطول بمدينة شبام واعداد الشروط العامة والمواصفات وجداول الكميات والكلفة التقديرية لها .
- دراسة فنية لزيادة فتحات بوابات الموزع لمرور اكبر كمية من مياة السيول خلالها والمواصفات وجداول الكميات والكلفة التقديرية لهذه الاعمال .
- الدراسة الفنية للطريق الدائري والفرعي للحقول الزراعية مع تصميم خمس عبارات صغيرة كشريان وصل لهذه الطريق مع اعداد المواصفات جداول الكميات والكلفة التقديرية لها .
I worked in the Assembly with a team in each of the following:
- Structural Design for the bridge west of Shibam city and preparing general conditions and specifications and quantities tables and the estimated cost of the bridge.
- Structural design for a medium length Culvert in Shibam and preparing general conditions and specifications and quantities tables and estimate cost.
- A technical study to increase the slots distributor portals for the passage of the largest amount of flood water during and specifications and quantities tables and the estimated cost of these works.
- The technical study of the ring road around the agricultural fields with the design of five small Culverts as a link line between the agricultural field and preparation of quantities tables and specifications estimated cost.
-الاشراف اليومي على العمالة الموجودة في المواقع وتوجيهها .
-اعداد التقارير اليومية الخاصة بالمكون .
-اعداد الرسومات الخاصة بالمكون وعكس الاعمال المنجزة على الرسومات والمساهمة في رفع نسب انجاز المكون .
- Supervising of daily works and guide the workers to do the right objects .
- daily report of that component.
- Preparation of drawings of the component and related that drawings with the reports and contribute to raising the completion rates of the component.
بتقدير جيد//