Mohammad Al Khatib, Planning Engineer

Mohammad Al Khatib

Planning Engineer

Tefco International Contracting LLC

Lieu
Émirats Arabes Unis - Abu Dhabi
Éducation
Baccalauréat, Management Information Systems
Expérience
14 years, 11 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :14 years, 11 Mois

Planning Engineer à Tefco International Contracting LLC
  • Émirats Arabes Unis - Dubaï
  • Je travaille ici depuis janvier 2017

- Prepare Project Baseline Programmes for Client/Employer/Consultant approval with resources and costs
- Prepare of project schedule, weekly & monthly report, S-Curve, Man power and Machinery histogram
- Identified Critical Path of the Works
- Monitoring, controlling and updating the overall project schedule, budget and cash flow projections throughout the construction process
- Coordinate work between contractors and assisted in resolution of conflicts arising from performance of contracts
- Monitoring and tracking project schedules and budgets, prepare progress reports, and liaison with key stakeholders.
- Utilized planning tools such as Primavera and excel
- Site visits to gather and confirm Progress of Works
- Assists in the formulation of resources productivity
- Attende brainstorming sessions to plan and sequence activities
- Installed and configured systems support such as Primavera or Asset Management applications.

Planner and Scheduler à Ghantoot Transport & General Contracting Est.
  • Émirats Arabes Unis - Abu Dhabi
  • octobre 2010 à décembre 2016

• Working in Ghantoot Group, Road Division, as Planner & Scheduler and IT Engineer.
Abu Dhabi, UAE. (Oct, 2010 - till date).

Projects:
- Mohammed Bin Zayed City Sectors ME3-ME7 (Zone H1) in Abu Dhabi, AED (108, 580, 347)
- Construction of Small Project and Miscellaneous Works for Traffic Alleviation Projects in Abu Dhabi. AED (108, 889, 804)
-Other projects (Improvement of Al Mafraq to Al Ghwaifat Bprder, KIZAD Al Tawilah, AL Falah Community)

- Prepared Project Baseline Programmes for Client/Employer/Consultant approval with resources and costs
- Prepared of project schedule, weekly & monthly report, S-Curve, Man power and Machinery histogram
- Identified Critical Path of the Works
- Monitored, controlled and updated the overall project schedule, budget and cash flow projections throughout the construction process
- Coordinated work between contractors and assisted in resolution of conflicts arising from performance of contracts
- Monitored and tracked project schedules and budgets, prepared progress reports, and liaison with key stakeholders.
- Prepared Extension of Time claims as required for the projects utilizing As-planned, As-built and Time Impact Analysis
- Attended Progress Meetings with Client & the Project team
- Utilized planning tools such as Primavera 6.8 and MS Project and excel
- Planned work methods and established bid schedules using Primavera and Microsoft Project and assisted in formulating proposals and cash flow predictions
- Attended site visits to gather and confirm Progress of Works
- Assisted in the formulation of resources productivities
- Attended brainstorming sessions to plan and sequence activities
- Installed and configured systems support such as Primavera or Asset Management applications.
- Set network plans and laid telecommunication infrastructure networks for site offices network
- Defined and diagnosed network problems and find out the proper solution.
- Troubleshoot and resolved all problems encountered with hardware and software as well as providing the required technical support. Escalated requests to the relevant party, as needed. Replaced or repaired defective parts and equipment.
- Controlled site assets as well as maintain proper monthly/annually inventory.
- Participated in technical research and development to enable continuing innovation within the infrastructure.
- Advised recommendations for improving the company's IT systems and carrying out routine configuration and installation of IT solutions.
- Installed new / rebuilt existing servers and workstations, printers, configure hardware, services, settings, directories, storage, etc. in accordance with standards and project/operational requirements.
- Monitored and removed virus, spyware, and other non authorized software.
- Supported and maintained backup and recovery, monitoring and troubleshooting.
- Created and changed users account.
- Assisted with training of staff and compiling procedural documentation.

Projects Support & Planning Supervisor à Infrastructure Builders for Power & Network
  • Jordanie - Amman
  • juin 2010 à octobre 2010

• Worked in Infrastructure Builders for Power & Network, as Projects Support Supervisor.
Amman, Jordan (May, 2009 - Oct, 2010).

- Provide vital assistance to project managers.
- Log, manage and analyze information on the progress of the project, using Excel and PRIMAVERA.
- Responsible for managing lower-level administrative support staff.
- Responsible for monitoring project schedules and budgets, preparing progress reports, and liaising with key stakeholders.
- Developing sales within both existing & new business accounts (Kings Academy, Pharmacy1).
- Ensure Quality & Requirements Assurance.
- Evaluation of the project, and staff before handing over (Leviton, Linksys-Cisco).
- Determine the UPS energy that required for each project (Riello Aros UPS, ITALY)

IT & Technical Support administrator à optimiza Jordan
  • Jordanie - Amman
  • septembre 2009 à avril 2010

• Worked in Optimiza-Jordan (Software solutions, Consulting, Training, Outsourcing), as IT & Technical Support administrator.
Amman, Jordan (Sep, 2009 - April, 2010)
- Identifying problem areas to resolve.
- Computers, and printers installation (ACER, HP)
- Technical support, software & hardware.
- Build network, and maintenance.
- Procurement and inventory procedures and regulations; Control site assets as well as maintain proper monthly/annually inventory.
- Ordering of equipment, materials and office supplies.
- Manages client expectations by communicating project status and issues; resolving concerns; analyzing time and cost issues; preparing reports
- Prepares reports by collecting, analyzing, and summarizing data and trends

Client's Technical Support à Tesco Co. (Intelligent Office Products, KONICA MINOLTA)
  • Jordanie - Amman
  • octobre 2007 à janvier 2008

TESCO Co. (Intelligent Office Products, KONICA MINOLTA), in technical support center.
Amman, Jordan (Oct, 2007 - Jan, 2008)

- KONICA MINOLTA multifunction machine installation and maintenance.
- Identifying problem areas to resolve.
- Client's technical support.
- Build network, and maintenance.

Éducation

Baccalauréat, Management Information Systems
  • à Philadelphia Universty
  • juillet 2008

I did Management Information Systems, I am an analyst, planner, project adviser, developer, and business network administrator.

Diplôme, Business Administration and Computer Information systems ( Double Major).
  • à Emirates College of Technology, associated with Lambton College in Canada
  • août 2004

I did Business administration and computer information systems, business & network administrator, business management, and information technology administrator.

Etudes secondaires ou équivalent, science
  • à Ribeie Bin Amer Secondary School.
  • juillet 2001

Specialties & Skills

Project Control
Software Installation
Primavera P6
Communications
Administration
Microsoft Office
I enjoy working in a busy environment where my contributions are recognized as I have excellent co
Hardware and software
Oracle SQL
Primavera P6

Langues

Arabe
Expert
Anglais
Moyen

Formation et Diplômes

First Aid (Certificat)
Date de la formation:
March 2015
Valide jusqu'à:
April 2016
Certification of Primavera P6 (Certificat)
Date de la formation:
January 2014
Certification of Introduction To .Net Framework 3.5 (Certificat)
Date de la formation:
March 2010
Valide jusqu'à:
May 2010
- Graduation Project: Online Cinema Tickets Reservation System (Certificat)
Date de la formation:
February 2008
Valide jusqu'à:
May 2008
Efficiency Test Certificate (Certificat)
Date de la formation:
June 2008
Valide jusqu'à:
August 2008
Scored (75%) in Efficiency Test course (Certificat)
Date de la formation:
June 2008
Valide jusqu'à:
August 2008
Certification of .Net Framework 3.5 Web Application (Certificat)
Date de la formation:
March 2010
Valide jusqu'à:
May 2010
Certification of ADO.Net 3.5 using VB.Net (Certificat)
Date de la formation:
March 2010
Valide jusqu'à:
May 2010

Loisirs

  • Sports and Adventure
    Mixed martial arts, camping & off road, swimming and traviling.