Mohammad Asif, Deputy Manager- Coal Handling plant operations

Mohammad Asif

Deputy Manager- Coal Handling plant operations

CLP India

Location
India
Education
Diploma, Thermal Power Plant Engg
Experience
16 years, 3 Months

Share My Profile

Block User


Work Experience

Total years of experience :16 years, 3 Months

Deputy Manager- Coal Handling plant operations at CLP India
  • India - Delhi
  • My current job since October 2015

 To meet the coal supply to boiler bunkers as per main plant requirement.
 Close monitoring of timely unloading of rakes through Wagon Tippler.
 Coal yard management by stacking, reclaiming & compaction of different types of coal at identified locations in yard.
 Regular updating to the management regarding the CHP O&M and coal rakes activities.
 Timely report to the concerned person incase of failure of the equipment.
 utmost care for Optimum utilization of available resources at CHP for reliable operation of CHP.
 100% implementation of PTW system & LOTO system
 Issuing 100% permit with notification/work order & risk evaluation.
 Interdepartmental (Production, Maintenance & Planning) coordination for CHP system healthiness.
 Receiving, Releasing & Departure of rakes without any conflict with Indian Railways authorities & ensuring least demurrage.
 Optimum utilization of rented LOCO to enhance early unloading of rakes and minimizing railway demurrage.
 Maximum utilization of belt to achieving the max utilization factor
SHE Rep activity;
Zero LTI in all operation activities;
PTW system compliance with notification & planning in timely manner;
Proper risk evaluation of all activities & mitigation measure for permits;
Regular audit of interlock & protection
Regular TBT on activities;
Regular observation & risk evaluation of high risk activities (PJO);
Near-miss & incidence reporting

Deputy MANAGER- ELECTRICAL at CLP POWER INDIA PRIVATE LTD
  • India - Delhi
  • March 2008 to October 2018

Working as Asst. Manager - Maintenance in Jhajjar Power Ltd. (2 X 660 MW), since Sept-2012, Village Khanpur Tahsil Matenhail District Jhajjar Haryana - 124142 India.

Worked as Asst. Manager - Construction for erection & commissioning of Jhajjar Power Project. (2 X 660 MW) from Aug- 2012 to Aug-2010.

Was on probation period from Aug-2009 to July-2010 in Jhajjar Power Limited.


Jhajjar Power Limited is 100% subsidiary of CLP Holdings; a Hong Kong based Power Company which has set up a 660X2 MW Coal fired, supercritical thermal power plant for delivering power in Haryana.

Broad Nature of Duties are as follows:

Erection & Commissioning phase-
• Ensured proper grounding system for the whole plant area, mainly switchyard.
• Testing & commissioning of LT panels & switchgears.
• Inspection, Testing & commissioning of Motors installed in the plant by taking trial run test (with shaft decoupled & coupled both); & monitoring parameters like starting current, running current, bearing temperature(NDE/DE), motor body temperature, direction of rotation, RPM etc for smooth operation.


Maintenance phase-
1) Township Substation Maintenace
2) Canal Water Pump House Maintenance
3) Lighting & HVAC Maintenance with necessary design modification & implementation.
4) Procurement of Plant Consumables in SAP


Previous Employer - From 2007-08

Prior to above also worked as Graduate Engineer Trainee in Adecco Flexione Worforce Solutions Ltd for BSES Yamuna Power Ltd.(Discom company entrusted to distribute power in Central and East area of National Capital Territory of Delhi) in Meter Testing Laboratory.

Broad Nature of Duties are as follows:
1) Accuracy Check of energy meters.
2) Inspection of faulty/burnt meters for genuinity.
3) Inspection of tampered meters against theft & calculating percentage slowness of the energy meters to provide loss figure to the BSES comp

Assistant Manager- Electrical Maintenance at CLP India Private Limited
  • India - Delhi
  • November 2013 to September 2015

Assistant Manager in CLP India Private Limited for 660X2 MW Coal based Jhajjar Power
Project, HARYANA from 31-Aug 2009. Gained 3 year of experience in Power plant.

Current CTC: 7.1 Lakhs


STRENTHS: 1.Worked on all types of LT panels/switchgears.
2. Also involved in erection & comissioning of LT panels & Switchyard.
3. Involved in procurement of Plant spares & consumables.
4.Supervised a team of 12 persons of Lighting Contractors
5.Supervised a team of HVAC Contractors
6. Played a key role in Plant lighting design modification & effectivei mplementation especially in Coal Handling Plant/main plant/ & balance of Plant area

SAP- Raising Purchasing Requisition as End user, MS-Word; MS-Excel

Education

Diploma, Thermal Power Plant Engg
  • at National Power Training Institute- New Delhi
  • August 2009

Did 2 months mandatory rotational training covering the utility plants of Delhi & NCR region

Bachelor's degree, ELECTRICAL ENGINEERING
  • at Azad Inst. Of Engg. & Tech
  • August 2006

B.Tech (EE) Azad Inst. Of Engg. & Tech. U.P.T.U Lucknow 2006 64.5

High school or equivalent, maths,science,english,hindi,social science
  • at Little Angels high School
  • July 1999
High school or equivalent, English,Hindi, Maths,Science,Social Science
  • at Little Angels High School
  • June 1999
High school or equivalent, ENGLISH HINDI MATHS SCIENCE SOCIAL SCIENCE
  • at Little Angel's High School
  • June 1999

S.S.C. Little Angel's High School, Lucknow C.B.S.E. 1999 66

Specialties & Skills

Hardwork
Plant Maintenance
Electric Power
Visualization
Maintenance Engineering
BUYING/PROCUREMENT
PURCHASING
TRAINING
electrical Maintenance

Languages

Hindi
Intermediate
English
Intermediate