Maximum upload file size: 3MB. File types allowed: jpg, jpeg, gif only.

Click the above 'Browse' button to select a photo.
Guidelines
  1. Only upload a photograph of yourself
  2. Photos of children, celebrities, pets, or illustrated cartoon characters will not be approved
  3. Photos containing nudity, gore, or hateful themes are not permissible and may lead to the cancellation of your account
  4. Photos of your passport, ID, or photos containing any personal information such as your address, passport number, or contact details are not permissible for your own security.

Delete Guidelines

Mohammad Danish Noorullah

Piping Supervisor,Mechanical Supervisor

POWER AGE CONSTRUCTION PVT. LTD

Location:
India - Patna
Education:
Bachelor's degree, Mechanical and Piping Supervisor
Experience:
12 years, 3 months

Work Experience

What's your work experience? Your experience is one of the most important sections in a CV.
List all relevant responsibilities, skills, projects, and achievements against each role.  If you're a fresh grad, you can add any volunteer work or any internship you've done before.
Add Experience

Total Years of Experience:  12 Years, 3 Months   

February 2016 To Present

Piping Supervisor,Mechanical Supervisor

at POWER AGE CONSTRUCTION PVT. LTD
Location : India - Agra
• Preparing and monitoring of fabrication Sequencing as per Code and standards during fabrication work is performed in accordance with the approved construction procedure, specification and correct materials of Process Piping / Pipeline.
• Provide Static equipment and piping expertise to the Project from Detailed Engineering, Procurement, Installation & Commissioning phases.
• Checking piping design basis, piping specifications & standards.
• Attending Daily meeting.( Production and Safety)
• Familiar in Erection of Hook up Spools in utility station and Pumps Equipment’s and vessels.
• Performing Construction and Scrapping activities.
• Proper Arrangement of equipment and manpower based on the site without delaying of production daily based.
November 2012 To October 2015

Mechanical Supervisor

at POWER MECH PROJECT LIMITED
Location : India - Kerala
• Responsible for create best environment of working under all condition.
• Material handling and record maintenance related to site.
• Conducted and documented a daily review of the work assignment.
• Taking of the quantities as per the site requirement.
• Close the shut-off valve in the outlet line.
• Remove the supply line to the blanketing valve carefully in case there is still trapped
Pressure in the line.
• Close the shut-off valve in the blanketing gas supply line.
• Close the shut-off valve in the sense line.
• Seal off the sense port by closing the sense line shut-off valve or inserting a pipe
Plug.
• Position the outlet of the valve so that the high pressure flow can exhaust safely.
• Slowly open the needle valve to pressurize the sense line.
• The diaphragm assembly is stuck or prevented from moving all the way back up.
• Remove cap screws, diaphragm cover, diaphragm and port bushing of relief valve.
• Slowly open outlet shut-off valve and return the valve to service.
• Test the assembly to ensure it is operating properly.
• Connect a line from a pressure source to the valve inlet.
November 2011 To October 2012

Mechanical Supervisor

at sasa musa sugar works ltd
Location : India - Patna
• Responsible for create best environment of working under all condition.
• Material handling and record maintenance related to site.
• Conducted and documented a daily review of the work assignment.
• Taking of the quantities as per the site requirement.
• Close the shut-off valve in the outlet line.
• Remove the supply line to the blanketing valve carefully in case there is still trapped
Pressure in the line.
• Close the shut-off valve in the blanketing gas supply line.
• Close the shut-off valve in the sense line.
• Seal off the sense port by closing the sense line shut-off valve or inserting a pipe
Plug.
• Position the outlet of the valve so that the high pressure flow can exhaust safely.
• Slowly open the needle valve to pressurize the sense line.
• The diaphragm assembly is stuck or prevented from moving all the way back up.
• Remove cap screws, diaphragm cover, diaphragm and port bushing of relief valve.
• Slowly open outlet shut-off valve and return the valve to service.
• Test the assembly to ensure it is operating properly.
• Connect a line from a pressure source to the valve inlet.

Education

What's your educational background?
Let employers know more about your education; remember, be clear and concise.
June 2012

Bachelor's degree, Mechanical and Piping Supervisor

at rajasthan vidyapeeth university
Location : India - Hyderabad
Grade: 66 out of 100
Mechanical Engineer
January 2006

High school or equivalent, secured

at urdu college gopalganj
Location : India - Patna
Grade: 58 out of 100
• Intermediate science Exam in 2006 secured 58% from Bihar Board.
January 2004

High school or equivalent, secured

at Bihar Board
Location : India - Patna
Grade: 63.85 out of 100
• Passed S.S.C. Exam in 2004, secured 63.85% from Bihar Board

Specialties & Skills

DATA ENTRY

ENGINEER

EXCELLENT TYPING

INSPECTION

MAINTENANCE

VISUAL INSPECTION

Mechanical Analysis

Languages

Do you speak more than one language?
For some jobs, fluency in one or more foreign languages is a plus, so add your language skills to get better results.

Hindi

Beginner

Urdu

Beginner

English

Beginner

Loading
Loading...
Loading...