supervisor
hydratight
مجموع سنوات الخبرة :10 years, 6 أشهر
• Verification of isometric dawning with respect to P&ID
• Coordinating with client/consultants while the inspection is being carried out and offer any clarification is required
• After inspection preparing crew for the bolt torque and allocation
• Details as given to field service engineer regards project Specifications.
• Preparing and maintaining various QA/QC documents and final test packages.
• Witness of alignment, orientation and dimensions of installed piping.
• Ensure the blinds are removed and correct rating gaskets are installed.
• Inspection of gaskets, supports, valves prior to line reinstatement acceptance as per the
• Latest drawing for construction, codes and specification standards.
• Prepared documents, procedures for inspection method, inspection and testing plan in
Computerized environment
• Clearing of MCC (Mechanical completion certificate) items