land servey
binladin group
Total years of experience :12 years, 8 Months
land survey
Roads (6.5KM), Pipe Lines Projects(WATER-
9KM, STORMWATER-13KM), BUILDING(502VILLA
PREPARATION BUILDING COMPANY
Roads, Pipe Lines Projects(WATER7KM
GASSAN HAYMOOR COMPANY .
SUB CONTRACT UNDER TURKISH COMPANY (OZALTEEN)
AL WEHDA DAM
mohl2008ameer@yahoo.com
Roads(7KM), Pipe Lines Projects (2.5KM), DAM(GALLARY
ATEF ALDOGMI COMPANY
Roads(8.5KM), Pipe Lines Projects(WATER4.50KM, STORM
1.50KM
* Controlling & Mapping Survey, Surveying & Engineering Software
* use
Roads (166KM), Pipe Lines Projects(STORM WATER 16),
BUILDING, BRIDG(SMALL 22
COMPANY
Roads(7.50KM), Pipe Lines Projects (WATER(8.5KM),
STORM(1.50KM
Supervision and calibration of Bathometry survey Equipment’s for Pre controlling all survey activities
within the Province.
* Triangulation surveys to fix survey control along the roads Bridge site surveys producing plans of
various surveys. Calculates heights, depths, relative positions, boundary lines, and other characteristics
of terrains and structures.
* Training junior surveyors and coordinating surveyors on the various day to day survey requirements.
Responsible of 8 teams of surveyor
controlling the use of survey equipment. Monitoring the survey expenditure
* Preparation of Geodetic Datum transformation
* Preparing Volume calculation & Quantity surveying.
/ High School (tawjihi);Scientific stream *