Instruments & Control Engineer & CompEX EX01-EX04 Certified
BP - WND
Total years of experience :11 years, 11 Months
• Support instrumentation commissioning and startup activities for gas plant.
• Take responsibility and ownership for system handover activities according to system acceptance criteria and BP procedures.
• Prepare and Implement Basic Care procedures for asset instrumentation and conduct training for the working team.
• Support and Help vendors in their activities and jobs to meet schedules as planned.
• Perform Safety Instrumented System and Control System Maintenance and Troubleshooting.
• Perform Gas Turbines Control System Maintenance and Troubleshooting.
• Perform Gas Turbines Instrumentation and Fire & Gas System Maintenance and Troubleshooting.
• Conduct instrumentation preservation activities during brownfield facilities rehabilitation.
• Plan and perform MC walk-downs for dispatching punch-list preparation.
• Supervise and lead instrumentation teams to conduct all work in safe and responsible manner.
• Lead EX inspection activities through following CompEx procedures for explosive atmospheres.
• Prepare generic and specific instruments maintenance procedure based on equipment strategies.
• Review onshore plant strategies to prepare proactive instrumentation maintenance philosophies.
• Participate in Safety audits and self verification activities to ensure People, Plant, Process, Environment and Economic safety and work flow stability.
• Act as Performing Authority (PA) through Control of Work (CoW) onshore procedures.
• Prepare Level-1 and Level-2 Hazard Identification Task Risk Assessments (HITRA).
• Participates in Safety Override Risk Assessment Process (SORA).
Working as Instruments and Control "I&C" Engineer at Port Said East Power Plant - Edra - CGN.
"720 MW Steam Turbine Power Plant"
During this period, the following activities have been done: -
1. Calibration of transmitters (Temperature, Flow, Level, Pressure and etc.)
2. Calibration of I/P positioners (Masoneillan, PMV, Siemens) for control valves.
3. Calibrating RTD and Thermocouple using special calibrating tools.
4. Hydraulic and pneumatic actuators, directional valves and flow control valves.
5. Troubleshooting for Alstom DCS (Hardware & Software) & SUN Stations.
6. Troubleshooting for Step7-300 and Step7-400 PLC.
7. Design electronic printed circuit board using Microcontrollers.
8. Deal with Natural Gas Analyzer (ABB) Chromatograph BTU, RTU and Flow Computer.
9. Deal with Centrifugal Air Compressors & Dryers Instruments and Control.
A Control Engineer at Maintenance department of the Power House:
- MAK CATERPILLAR 8.7 MVA Generators
- Wärtsilä 10.4 MVA Generators.
- CUMMINS 2 MVA Generators
During this period, the following activities have been done:-
1. Maintain the system working with maximum efficiency as possible.
2. Study and Apply Modifications to Control System Components and Circuits.
3. Test, repair or advice to replace sensors, transmitters, or other instrumentation devices.
4. Maintenance of Electronic Circuits, UPS, Battery Static Chargers and Motor Soft Starters.
5. Testing Signal Converters and Sensors Calibrations.
6. Watch the performance of sensors and generators using system trends.
7. Starting up the system as fast and safe as possible when Blackout occurs.
8. Writing daily reports about power generation, and technical status of the generator-sets.
Diesel Electric Generators Maintenance Engineer and Generator's AVR System R&D Engineer,
During this period, the following activities have been done:-
1. AVR Design for Frequency Converters (50 Hz to 400 Hz Variable Voltage Frequency Converters).
2. Printed Circuit Board Design and Maintenance for AVR Systems.
3. Reverse Engineering and Modification of Electronic and Electrical Systems.
4. Maintenance and Troubleshooting control panel for Generators.
5. Electromechanical Systems Maintenance and Troubleshooting.
6. Development of Movable Electric Power Stations.
Faculty of Electronic Engineering. B.Sc. of Industrial Electronics & Automatic Control Engineering. Grade: Good (72.12 %). Graduated Project: Robot Explorer Project. Project Grade: Excellent. Graduation Year: May/2011.