Construction Manager (Civil)
Emirates Technical Associates
Total years of experience :26 years, 8 Months
1. Oct. 2007 to till date working for Emirates Technical Associates, Abu Dhabi, U.A.E.
Position: Construction Manager (Civil)
Company Profile: Emirates Technical Associates (ETA) Power Projects Division, Member of ETA Star Group, Mostly working for Abu Dhabi Electric & Water Supply Authority (ADWEA) & GASCO
Client: Abu Dhabi Electric & Water Supply Authority (ADWEA)/GASCO
Project Handling: Power Generation Units Retirement Project, GASCO, Habshan
• Project Title: Power Generation Units Retirement Project, GASCO, Bab/Habshan
• Project Title: 220/33kv New Grid Station at AMPC, Al Ain.
• Project Title: 132/22kv Grid Station at South Shamkha, Abudhabi.
• Project Title: 220/33kv Grid Station at Ghantoot, Abudhabi.
• Project Title: 220/33kv Grid Station extension work at Mussafah, Abudhabi.
• Project Title: 220/33kv Grid Station at Al Tawyeen & OHL Related Works.
• Project Title: 220/33kv Grid Station at Al Ain Industrial City, Al Ain.
• Project Title: 132/11kv Grid Station Transformer bay modification work in Mussafah, Abudhabi.
2. Sept. 2002 to Sept. 2007 at Black Cat Engineering & Construction, Doha, State of Qatar.
Position: Civil Superintendent
Company Profile / Job profile: Black Cat Construction, an ISO 9001:2000 and OSHAS Certified EPIC Company, Mostly works for Qatar Petroleum in Dukhan Oil & Gas field, Raslaffan and Mesaieed Industrial city, Doha Qatar.
Projects Completed: • Title: EPIC for the Replacement of Halon System at Dukhan Oil & Gas field and Mesaieed.
Client: Qatar Petroleum.
• Title: EPIC for Napthenic (Sulfidic) Caustic Injection Project at Raslaffan.
Client: Ras Gas
• Title: EPIC of Fire & Gas Detection/Protection and Safety Up gradation in Fahahil Degassing Stations, Dukhan Oil &Gas field.
Client: Qatar Petroleum.
• Title: EPIC of New Raw NGL injection Facilities Project, Fahahil Stripping Plant, in Dukhan Oil& Gas field.
Client: Qatar Petroleum.
• Title: EPIC of Fire Water Tank & Deluge System, Fahahil Stripping Plant, Dukhan Oil & Gas field.
Client: Qatar Petroleum.
3. June 2000 to Aug. 2001 at Mideast Constructors W.L.L. (MECON) & Kharafi National (Joint Venture)
Position: Civil Engineer
Company Profile/Job Profile: MKN, A Joint Venture of Mideast Constructors and Kharafic National were engaged to execute "Sulfur Recovery Expansion (SRX) Project" for Qatar Gas in Raslaffan in Doha Qatar.
Project Title: Sulfur Recovery Expansion (SRX) Project.
Client: Technip / Qatar Gas.
4. Sep. 1998 to May 2000 at Mannesmann Demag AG. / Technip in Abu Dhabi, UAE.
Position: Site Engineer
Company Profile/Job Profile: MDA was a German based Multy National Company Specialised for Turnkey Project in Oil & Gas field. In 1999 Technip acquired the oil and environmental businesses of Mannesmann Demag AG.MDA was engaged to execute "Gas Gathering & Injection Project" for Abu Dhabi Company for Onshore Oil Operations (ADCO) in Asab Oil & Gas field, Abu Dhabi (UAE)
Project Title: Gas Gathering & Injection Project.
Client: Abu Dhabi Company for Onshore Oil Operations (ADCO)
5. Oct 1996 to Dec. 1998 at Mohammad Al-Mojil Group, Dammam, Saudi Arabia.
Position: Site Engineer
Company Profile/Job Profile: MMG a Saudi based group of companies, one of its Construction Services had been instrumental in the realization of major construction project initiated by Saudi Aramco & SABIC. MMG was engaged for expiation project of Qassim Product Supply System, Aramco Bulk Plant, Al Qassim, Saudi Arabia.
Project Title: Expansion of Qassim Product Supply System.
Client: SNC Lavalin Co. / Saudi Aramco.
Overall Duty & Responsibilities:
• To plan and schedule the work and efficiently organize the site / facilities in order to meet an agreed programmed of deadlines.
• To attend regular meetings with clients and consultants and keeping them informed of progress.
• To supervise and monitor the site resources through Site Technical staffs, monitoring the work of any subcontractors to complete the work as per customer's satisfaction.
• To oversee quality control and safety matters on the site, and ensure that regulations are adhered to.
• To resolve any unexpected technical difficulties and other problems that may arise at any time.
• To oversee the selection and requisition of materials for use in the construction / maintenance, to check whether the materials are as specified.
• To supervise and ensure proper maintenance of materials and to advice on technology and modifications required for a simpler and cost saving mechanism.
• To prepare necessary paper work for the completion of work and get it authorized by the client after their inspection.
• To develop a relationship with the senior management and prepare periodical reports on the progress of work.
Others Details:
Nationality/Religion: Indian/Islam
Language Known: English, Hindi
Permanent Address: At Manichapar, Post Hathwa, District Gopalganj,
Bihar, Pin- 841436, India. Tel. +91-9708153475
Passport Details: Passport No. L-3413598
Place of Issue: ABUDHABI.
Date of Issue: 11.07.2013.
Date of Expiry: 10.07.2023.
I declare that to the best of my knowledge the above information given is honest and accurate.
Date:10.01.2016
B.E. (Civil) from Govt. Engineering College, Amravati with First class (70.2%), Amravati University in 1996. Additional Trainings & Qualification:
1. Diploma in Civil Engg. From Maharastra Technical Board, Bombay in 1993. 2. Industrial safety Management. 3. Internal audit training. 4. First aid & fire fighting training. 5. MS Office.