Mohammad  Hamad,

Mohammad Hamad

TECHNO GROUP

Location
Jordan - Amman
Education
High school or equivalent, كهرباء
Experience
16 years, 7 Months

Share My Profile

Block User


Work Experience

Total years of experience :16 years, 7 Months

at TECHNO GROUP
  • Egypt
  • My current job since April 2017
Electrical Supervisor at TECHNO GROUP
  • Jordan - Aqaba
  • March 2016 to April 2017

Working as an Electrical Supervisor, at the Rehabilitation and extension of the industrial
port of Aqaba's project (which consists 7 new sulfur belt conveyors, 8 rehabilitated belt
conveyors, 3 ship-loaders and 1 ship-unloader) supervising all electrical works on
site, such as:
Assembly and Installation of Medium Voltage Switch gears (ABB), Oil-Type
Transformers (ABB) with BTS, Low voltage panels (ABB) and VSD panels (ABB).
Handling all cable pulling activities on site and inside substations.
Termination of all cables in the project (Power, Instrumentation, and fire cables).
Installation and fabrication of cable raceways (all sizes of cable ladder and cable tray
400mm, 200mm, and 100mm).
Installation of instruments, fire alarm devices, CCTV panels and lighting fixtures
on site.
Commissioning of all related electrical units and instruments on site; UPS system,
L.V panels, belt conveyors motors, and belt conveyor sensors.

Electrical Supervisor at Mohammad Mahmoud Ezzat Mohammad Mahmoud Ezzat 1 TECHNO GROUP
  • February 2015 to March 2016

Working as an Electrical Supervisor in Grain's silos project (28 silos which are fed from 2
ship-unloaders by 1000m conveyor belt) in Aqaba, supervising all electrical works, such as:
Assembly and Installation of Medium Voltage Switch gears (Siemens), Oil-Type
Transformers (Siemens) with BTS, Low voltage panels, and VSD panels.
Installation and fabrication of cable raceways (all sizes of cable ladder and cable tray
600mm, 400mm, 200mm, and 100mm).
Handling all cable pulling activities on site and inside substations.
Installation and assembly of puller's ship-unloaders with puller's electrical
supervisor.
Installation and commissioning of all electrical and instrument related to the belt
conveyors.

at DAEWOO
  • Algeria
  • November 2014 to February 2015
Electrical Supervisor at MID Contracting Company
  • Jordan
  • January 2012 to January 2014

Installation of lighting, fire detection and alarm, Building management, and CCTV
systems.

Electrical Technician at Mohammad Mahmoud Ezzat 2 Munther Sayegh Company
  • March 2011 to January 2012

Working as an electric technician at phosphoric and sulfuric acid plant's project at
Eshideye with the following tasks:
Installation and fabrication of cable raceways (cable ladder and cable tray) and G.I
conduits.
Installation and assembly of Medium voltage switchgears (33kV), L.V panels, M.C.C
panels, and UPS system.
Termination of power and instrumentation cables.
Installation of all related devices and units to lighting, CCTV, and fire alarm
systems.

Electrical Technician at Shams Almoshreg
  • February 2007 to March 2011

Working as an electric technician at The Disi Water Conveyance Project with the
following tasks:
Installation and termination of road lighting poles.

Electrical Supervisor
  • to

Working as an Electrical Supervisor at Nuclear reactor's project in Irbid, supervising all
electrical works such as:
Assembly and Installation of Medium Voltage Switch gears (ABB), Oil-Type
Transformers (ABB) with BTS, Low voltage panels.
Installation and fabrication of cable raceways(all sizes of cable ladder and cable tray
600mm, 400mm, 200mm, and 100mm) and G.I conduits.
Handling all cable pulling activities on site and inside substations.
Installation of lighting, fire detection and alarm, Building management, and CCTV
systems.

Electrical Team Leader
  • to

Working as an Electrical Supervisor at Water purification plant Zarqa, supervising all
electrical works such as:
Assembly and Installation of Medium Voltage Switch gears (ABB), Low voltage
panels.
Installation and fabrication of cable raceways(all sizes of cable ladder and cable tray
600mm, 400mm, 200mm, and 100mm) and G.I conduits.
Handling all cable pulling activities on site and inside substations.
Installation and commissioning of UPS system.
Installation of lighting, fire detection and alarm, Building management, and CCTV
systems.

Electrical Technician
  • to

Working as an electric technician at Jordanian Tobacco factories' Project with the
following tasks:
Installation of lighting, CCTV, BMS, Earthing, and Fire Alarm systems.
Cable pulling on site (power and control) and termination.
Installation and fixation of L.V panels.
Installation and fabrication of cable raceways ( cable ladder and cable tray of
different sizes 600mm, 400mm 200mm, and 100mm).
Mohammad Mahmoud Ezzat 3

Education

High school or equivalent, كهرباء
  • at مؤسسة تدريب مهني
  • May 2007

تقدير : ماهر

Specialties & Skills

LIGHTING
CABLING
MICROSOFT WORKS
OIL PAINTING
SUPERVISORY SKILLS
SWITCHES
SIEMENS NIXDORF HARDWARE
TECHNICIAN