project manager
Asia Advanced Construction
Total years of experience :12 years, 4 Months
Project Manager
QD-SBG / CP07B Project
Al-Jaber / Rice Silo Project
CCC / Upgrade of Musameer Road Project
Ramco / Almana Tower Project
NICC / NBK Square 1 Project
• Plan, monitor and manage execution of civil works ( steel reinforcement installation) in assigned area to ensure on time - in budget - high quality
• Coordinate with the main contractors
507 Villas
Jeyoun Alargan Villas Complex 30 villas
Construction of 30 villas with total build up area of 9740 m2
• Checking the drawing before tendering
• Preparation the tender documents
• Support consultant and project managers in the delivery of projects within time and budget to the desired standards and stated objectives
• Deal with materials supplier
Jeyoun Alargan Apartments Complex (Planning Stage)
Checking the drawing & following up with the Consultant to prepare the all drawing and the tender document
Argan Village (Completed)
Construction of Six blocks of two storey commercial buildings with landscape and roads.
Argan Village Awarded "The Best International Retail Developer "at the international Property Awards
Argan Village Awarded "Best Retail Development "at the Arabian Property Awards 2015- 2016
Argan Village Awarded "Best Retail Architecture "at the Arabian Property Awards 2015- 2016
3 Blocks two storey commercial buildings - Phase l
3 Blocks two storey commercial buildings - Phase ll
Building works:
• Supervised site work for the six blocks Commercial building of area 13500 m2.
• Support consultant and project managers in the delivery of projects within time and budget to the desired standards and stated objectives
• Coordinate between client and the contractor
• Coordinate with the contractor for work progress
• Solve the problem in the site
• Meeting with the contractor and the sub-contractor weekly
• Prepare the monthly report
• Coordinating between the Civil and MEP and Electrical works Active hand Masonry work, waterproofing works, Plumping and sanitary, Internal and external Electrical works, flooring works, Doors and windows, and painting works
• Check the shop drawing.
• Check the tender documents
• Calculate quantities for the project
Infrastructure:
• Internal Road fully, asphalt and Interlock roadworks and checking the level and coordinating the points.
• Activities for road works with associated lighting, sewage water system including earth work, pipe laying, manholes, backfill, testing Underground septic tank works.
Landscape:
• Landscape works soft and hard scape with area of 2660 m2, granite paving and sandstone paving, two fountains with full system, plants and the cultivation of palm trees
• Steel pergola and shade fabric structure, palm tree and plants.
• Supervised site works for all underground civil works and MEP works
Coordinating with the tenants and check there drawing.
Responsible for the maintenance of 82 villas at the same location
• Coordinate filed activities with design changes and internal scheduling
• Involved with the design, development and construction residence project in the built and natural environment.
• Ensured the safe, timely and well-resourced completion of project in many areas, including worker timeliness, safety and well being
• Supervised site work for twins Villa. Typical home in excess of 1500 m2
• Met inspectors on site to keep development process on time and budget
• Reviewed and interpreted Master Site Plans to ensure that work is done according to standards and safety rules.
Trainee site engineer
Senior Project: worked on a project to analyze and design multi-storey building, which is earthquake