1. KAFZA-II OIL STORAGE TERMINAL/ TANK FARM PROJECT
Designation : Lead / Sr. Procurement Engineer
Company : CHEMIE TECH LLC
Duration : Aug’’2014 to Jan’’2015
Project Value : US $50 Million Clients: SKA Energy FZE
Project Scope : EPC of Tank Farm Oil Storage Terminal Project Location: Basra, IRAQ
- Oil Storage terminal with 6 number of Tanks
- 4 number of pump installation with complete piping and firefighting system.
JOB PROCUREMENT OF STATIC, ROTATING, INSTRUMENTATION, PIPING BULK, SUBCONTRACT
DESCRIPTION Geodesic Dome Roofs Piping Material (ASTM) Survey Contract
Foam Propositioning System Fire Fighting Package Distribution Panels
Painting & Blasting Package PLC Automation A36 Steel Plates
Instrumentation Package DT & NDT Package Pumps & Valves
• Manage all Procurement / Materials Management activities for the assigned EPC Work Packages
• Review Contractors Procurement / Materials Management Plans and material responsibility matrix.
• Ensure that the appropriate material management systems are implemented
• Ensure Work Package - specific material management procedures and requirements (including
Material Control and Planning and Supplier Quality Surveillance) are complied.
• Interact with the Package Contracts Manager, Package Project Manager, Discipline Leads and
Company to meet Project objectives through alignment sessions, to ensure effective cross
discipline communication
• Responsible to review and recommend submission for any changes affecting materials on the EPC
Work Packages
• Provide input into initial project information such as Project Scope, initial Work Breakdown
Structure (WBS), sourcing strategy and early logistics planning, including coordination and
communication across the disciplines and development of the material management section of
the Contracts Management and Execution Plan, and the work processes required for the execution
of the Project
• Provide any mentoring to the Procurement / Materials Management Team, and unify the team to
ensure it is moving in a common direction, consistent with the overall Project objectives
• Ensure effective cross - discipline communications, expedite requirements and project issues.
• Implement Prime Contract requirements into Project Procurement / Materials Management plans.
• Review Contractors material control plans and procedures, and Material Take - Off schedules.
• Review Contractors Project expediting plans and strategies, improve Project schedule objectives
• Review Core Contractors SQS inspection plans & Procurement / Materials Management procedures
• Review Core Contractors and sourcing strategies & Project logistics plans and strategies.
• Review field material management plans and procedures, including site material control,
Warehousing, Inventory Control and surplus disposition as prepared by Contractor.
• Conduct cross - discipline procurement / materials management alignment sessions, as needed
• Ensure that appropriate strategies are developed, Project objectives are achieved, potential issues
are identified and corrective actions are completed
• Interface with Engineering on the topics of Vendor List, change management, expediting of vendor data and prompt return of same