مهندس مدني
مكتب الموسى للاستشارات الهندسية
Total years of experience :20 years, 5 Months
العمل كمهندس مدني
في إسكان الدمام نساج تاون 1&2
الدعم الفني لشركة تطوير للمباني - المدينة المنورة
a little bit of project
-Project value :100 million SAR.
Owner: national water company (NWC).-
Contractors, ellawazat, (CWC) .-
-Project with was about 80 underground chamber at water pipeline and set up valves and mechanical instruments and scada equipment.
-set up about 10 km PVC water pipe with diameter 300mm in distribution zones in Jeddah.
Responsibilities
All this items concerning civil works only.-
Checking drawings for civil works only.-
Interpreting drawings, and working conditions. -
-Checking materials if it is as specifications or not.
Checking of quality of work and materials.-
Checking quantities of materials which used.-
-Monitoring project and ensure if it as timescale or not.
Work as main technical advisor.-
Coordinate between owner, contractor.-
-planner, quantities surveyors and any other stockholders.
-Coordinates with facilities to ensure if work as regulations and lows
-Communicating with owner and their representatives (architects, engineers and surveyors), including attending regular meetings to keep them informed of progress.
-Monitoring project day-to-day.
-planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines.
-Checking quality control and safety matters on site.
-resolving any unexpected technical difficulties and other problems that may arise.
preparing reports as required.-
-Negotiating any technical problems with contractor and owners.
Jeddah, KSA
a little bit of project
-Project was 5 tenders with total value 250million SAR.
Owner: national water company (NWC).-
Contractors :SABAC.-
Project was kind of rush project.-
-surface water drainage network.
Work as an executive engineer.-
Project was about under gravity pipe.-
-network which have upper hole and surrounded with special gravel and all of this warped in geotextile this system permits to water to implemented in pipes and prevent soil.
Project was kind of rush project.-
-Tender 1: in elmatboly zone and 14th kilo and el olayia zone using UPVC pipes 300mm and 500 mm. Length about 15km , depth until 4m.
-Tender 2: in elraya dist., and abrouq el roughama zone, about 30km, depth until 4m . Using UPVC pipes Diameters 300mm, 500mm.
-Tender3: in alsamer zone bout 35km. depth about 4m . using UPVC pipes, with diameters 300mm, 500mm.
-Tender 4 : in elsanabel zone, length about 30km, depth until 4m, diameters 300mm, 500mm.
-Tender5: in zahret el maarred, alagaweed, zone, about 30km, using UPVC pipes with diameters 300mm, 500mm, depth until 5m.
Responsibilities
Checking drawings . -
Interpreting drawings, and working conditions-
-Checking materials if it is as specifications or not
Checking of quality of work and materials.-
-Checking quantities of materials which used.
-Monitoring project and ensure if it as timescale or not.
-Work as main technical advisor.
-Coordinate between owner, contractor, planner, quantities surveyors and any other stockholders.
-Coordinates with facilities to ensure if work as regulations and lows.
-Communicating with owner and their representatives (architects, engineers and surveyors), including attending regular meetings to keep them informed of progress.
Monitoring project day-to-day.-
-planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines.
-Checking quality control and safety matters on site.
-resolving any unexpected technical difficulties and other problems that may arise.
preparing reports as required.-
-Negotiating any technical problems with contractor and owners.
-Checking as built drawings.
Jeddah, KSA
a little bit of project
-Design of some mosques and bard Islamic embassy and commercial tower.
-Participate in design for some buildings.
-Checking drawings.
Interpreting drawings, and working conditions.-
-Work as main technical advisor.
-resolving any unexpected technical difficulties and other problems that may arise.
preparing reports as required.-
-Negotiating any technical problems with contractor and owners.
fayoum, egypt
Supervision of Installing 12 schools but not all finished.
Only 2 of them finished.
Responsibilities
Checking drawings.
-Interpreting drawings, and working conditions.
-Checking materials if it is as specifications or not.
-Checking of quality of work and materials.
-Checking quantities of materials which used.
-Monitoring project and ensure if it as timescale or not.
Work as main technical advisor.-
-Coordinate between owner, contractor, planner, quantities surveyors and any other stockholders.
-Coordinates with facilities to ensure if work as regulations and lows.
-Communicating with owner and their representatives (architects, engineers and surveyors), including attending regular meetings to keep them informed of progress.
-Monitoring project day-to-day agreed deadlines.
-planning the work and efficiently organizing the plant and site facilities in order to meet.
-Checking quality control and safety matters on site
-resolving any unexpected technical difficulties and other problems that may arise.
-preparing reports as required.
-Negotiating any technical problems with contractor and owners.
aseer, ksa,
a little bit of project
-Setting up 2 lift stations .
Set up treatment station.-
-Set up gravity pipe line about 20 km with diameter 600 mm , 800 mm.
Project value was about 150 millions Egyptians pounds.-
Responsibilities
-Monitoring costs .
-Negotiating prices of materials and Wage labor .
Agreeing pricing and costs .-
-Checking drawings .
Interpreting drawings, and working conditions .-
Checking materials if it is as specifications or not .-
-Checking of quality of work and materials .
Checking quantities of materials which used .-
-Monitoring project and ensure if it as timescale or not.
Work as main technical advisor .-
-Coordinate between owner, contractor, planner, quantities surveyors and any other stockholders .
-Coordinates with facilities to ensure if work as regulations and lows .
-Communicating with owner and their representatives (architects, engineers and surveyors), including attending regular meetings to keep them informed of progress .
Monitoring project day-to-day .-
-planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines.
Checking quality control and safety matters on site.
-resolving any unexpected technical difficulties and other problems that may arise.
preparing reports as required.-
Negotiating any technical problems with contractor and owners.
a little bit of project
-Supervising of rehabilitation of four small hospitals in elfayoum governorate in Egypt.
Responsibilities
-Checking drawings.
Interpreting drawings, and working conditions.-
Checking materials if it is as specifications or not.-
Checking of quality of work and materials.-
Checking quantities of materials which used.-
-Monitoring project and ensure if it as timescale or not.
-Work as main technical advisor.
-Coordinate between owner, contractor, planner, quantities surveyors and any other stockholders.
-Coordinates with facilities to ensure if work as regulations and lows.
Communicating with owner and their representatives (architects, engineers and surveyors), including attending regular meetings to keep them informed of progress.
-Monitoring project day-to-day.
planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines.
-Checking quality control and safety matters on site.
-resolving any unexpected technical difficulties and other problems that may arise.
-preparing reports as required.
-Negotiating any technical problems with contractor and owners.
fayoum, egypt,