محمد تنفير صديق, Deputy Construction Manager and Tunnels and Cross Passage Manager

محمد تنفير صديق

Deputy Construction Manager and Tunnels and Cross Passage Manager

QDVC, Red Line South JV

البلد
قطر
التعليم
ماجستير, Civil
الخبرات
26 years, 4 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :26 years, 4 أشهر

Deputy Construction Manager and Tunnels and Cross Passage Manager في QDVC, Red Line South JV
  • قطر - الدوحة
  • أشغل هذه الوظيفة منذ ديسمبر 2013

Project Planning & Control
•Overseeing the course of tasks in execution of the project post planning and finalization of preliminary design submitted by the designer as per the ease in construction requirement.
•Preparing and reviewing operating budgets, schedules, execution methodologies, milestones and Cash Flow projections.
•Preparing and monitoring resource requirements based on the budgetary parameters, making changes in the same as per revised schedules and budgets.
•Tracking and controlling cost accruals based with respect to budgets.
•Generating progress reports, monitoring project status, cost and time reconciliation.
•Mobilization and

Station Manager في QDVC, Red Line South JV
  • قطر - الدوحة
  • ديسمبر 2013 إلى سبتمبر 2016

Project Handled: Red Line South Doha Metro Rail Project (M003), worth 7.50 Billion QAR with 15.50 KM of twin bored tunnel, 5 underground stations, 5 switch boxes, 4 emergency exit shafts and 35 cross passages

Deputy Construction Manager and Tunnels & Cross Passage Manager في Qatar Railways Company
  • الهند
  • يونيو 2006 إلى ديسمبر 2013

Construction Cost of ADAJ Station Box : 135.00 million QAR
Construction Cost of Cross Passage : 94.00 million QAR
Construction Cost of Tunnel Invert and Walkway: 62.00 million QAR

Deputy Construction Manager في Dubai Rail Link Consortium
  • الإمارات العربية المتحدة - دبي
  • يونيو 2006 إلى ديسمبر 2013

Construction Cost of Station Box : 370.00 million AED.
Reporting to: Project Manager

Senior Site Engineer في Hindustan Construction Company
  • المملكة العربية السعودية - الجبيل
  • يناير 2005 إلى مايو 2006

Responsiblility: Restoration of Piers and Wharfs which comprises of 5 Piers, 10 Wharfs, Floating Pier, Dry dock,
Ammo Pier. Involve from the stage of planning and mobilisation. Which includes preparing of Method
Statement for various activites involve in the construction.
Reporting to: Works Manager
Contributions:
•Shop drawing and getting approval from the consultant and starting the production of precast members, including designing and fabrication of the formwork of special shapes.
•Method statement for different activities for restoration of piers and successfully got approval from the Engineers.
•Finalizing the methods and formwork requirement for the different pre-cast element.
•Mobilization and construction of the pre-cast yard for different types of precast structures.
•Modified the design of Hydro jetting frame for skinning of existing pies to meet the site requirement.


DELHI METRO RAIL PROJECT

Project Engineer في M.K.K Developers Pvt. Ltd
  • الهند
  • أكتوبر 1999 إلى يونيو 2001

Aligarh worth 30 million INR

Assistant Engineer في Kiri Associates Pvt Ltd
  • الهند
  • مارس 1999 إلى سبتمبر 1999

Projects Handled: Construction and Development of SOS children’s villages of India, Bhimtal worth 100 million INR

Site Engineer في SOS Children villages of Indi
  • الهند
  • ديسمبر 1995 إلى فبراير 1999

Construction of Mosque in Aligarh worth 3 million INR

Commenced career في A.KAIAC
  • أغسطس 1994 إلى نوفمبر 1995
De في Delhi Metro Rail Corporation
  • الهند
  • إلى

Construction of Kashmere Gate Underground Station which is an Interchange between Elevated and
Underground Station. This station was constructed using both Top down and Bottom Up Constructions
Method. Responsible for construction activities including from Road Diversion to the construction of
Main Station Box which includes, Diaphragm wall, Barrettes with Plunge Column, Excavation,
Permanent Retaining Wall, Temporary Strutting System, Different Level of Slabs, Waterproofing.
Secondary Structures (Staircases Non Structure Wall for Ventilation Plenum etc.). De-mobilization of
Project.
Construction Cost of Station Box : 60.00 million USD.
Reporting to: Section Manager
Contributions:
Diaphragm Wall, Micro piles and Barrette piles
Managed the sequence & excavation of Permanent Diaphragm Wall including Bentonite Management (18000m2 of diaphragm wall)
Planned the sequence of Barrette Piles (3500m2 of barrettes)
150000 m3 of bulk excavation for the station box with an average of 700 m3 per day in soft soil and 80.00 to 100.00 m3 in Hard Rock.
Preparing the Bar Bending Schedule for the diaphragm wall and Barrettes.
Administered Drilling of micro piles as per site requirement and Driving of sheet piles with 9T- vibro hammer maintaining the verticality.
Slabs (Top Down Construction Method)
Checked the bar BBS of roof slabs, concourse slab and base slab.
Coordinated with the client for the inspection of reinforcement and maintaining the ITP formats.
Administered the strutting of temporary diaphragm wall below the existing elevated rail corridor.
Temporary Diversion, Reinstatement and Utility Diversion and Demobilization
Diversion of 2.5m diameter drainage channel after the completion of the station diaphragm wall and roof slab.
Reinstatement of the road as per the approved drawings and standard.
Installation of the temporary metal deck bridge over a length of 1. 1 km between Kashmere Gate Station and the Civil Line Station for the smooth

Trainee Engineer في Kiri Associates Pvt. Ltd
  • الهند
  • إلى

الخلفية التعليمية

ماجستير, Civil
  • في Z. H. College of Engineering and Technology, A.M.U
  • مايو 2018
بكالوريوس, Civil
  • في Z.H. College of Engineering & Technology, A.M.U

Passed with first class

بكالوريوس, Engineering (Civil
  • في University Polytechnic, A.M.U

Passed with First Class Honors

Specialties & Skills

Tunnelling
Construction Engineering
Civil Engineering
BUDGETING
CUSTOMER RELATIONS
HUMAN RESOURCES
MACROMEDIA DIRECTOR
MICROSOFT WORKS
PROCUREMENT
REPORTS
REQUIREMENTS
SWITCHES
UTILITIES

اللغات

الانجليزية
متمرّس
الهندية
متمرّس
الأوردو
متمرّس