Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Mohammed Abdul Aziz Ansari, Electrical QC Inspector

Mohammed Abdul Aziz Ansari

Electrical QC Inspector·Conversion International Contracting Co.

Saudi Arabia

Bachelor's degree, Electrical Engineering

Work experience

Total years of experience: 13 years, 1 months

Electrical QC Inspector

September 2019 - September 2025

Conversion International Contracting Co.

Riyadh, Saudi Arabia

September 2019 - September 2025

• Familiar with international standards (IEC, NEC, IEEE, SEC) and
safety codes. Monitored project progress against established
timelines in order.
Supervision of electrical installations and quality control on site.
• Maintained accurate records of all QC activities including test
results, inspection data, corrective actions taken.
• Knowledge of grounding, lightning protection, and cable
termination inspection.
• Performed root cause analysis on on-conforming parts, developed
corrective action plans, monitored implementation progress, and
reported results to management.
• Proficient in electrical system inspection and testing.
• Analyzed data from periodic audits, identified trends in defect rates,
and recommended changes for continuous improvement initiatives.
• Handling of Material Inspection Requests (MIR) and site
inspections.
• Conducted routine and non-routine analyses of in-process
materials or stability samples.
• Management of Non-Conformance Reports.

Company industry:
Electric Power Production & Transmission
Job role:
Engineering

Electrical QC Inspector

February 2018 - April 2019

Larsen & Toubro

Riyadh, Saudi Arabia

February 2018 - April 2019

• Conducted inspections in compliance with Saudi Aramco
Engineering Standard (SAES), Saudi Aramco Typical Inspection Plan (SATIP),
Saudi Aramco Inspection Checklist (SAIC), and IFC drawings for the 13.8 KV
Transmission Line project at Hawiyah & Uthmaniyah.
• Conducted inspections for the installation of three-phase, four wire
4/0 AWG ACSR/AW and OPGW (24 Fiber) overhead lines, ensuring that all
materials and installations met the SA standards
and complied with SA specifications.
• Oversaw the installation and testing of auto re-closers, surge arrestors,
load break switches, fuse disconnect switches, and fault passage indicators,
verifying that all electrical components were installed and functioning in
accordance with design and project requirements.
• Inspected the installation of underground MV cables, duct banks,
and MV cable termination, ensuring that all installations adhered
to project specifications, quality control processes, and IFC drawings
• Managed the testing of MV cables, including Hi-Pot testing, to
verify insulation integrity and ensure all systems were functioning
correctly and compliance with Saudi Aramco pre commissioning forms.
• Inspect and closed all punch list items in Mechanical Performance
close out system.
• Conducting daily surveillance inspections for ongoing activities,
proactively raising concerns, and informing the construction team
of the minimum requirements to avoid rework on site.
◦ Work with the proposal team to ensure that the sub-contractor
scope of work is clearly defined, that contract Terms & Conditions
include appropriate flow downs, and that risks are properly allocated
between Main contractor and the sub-contractors
◦ Lead the development of single-line diagrams, layout drawings,
raceway systems, grounding systems, station service and Bill of
Materials (BOMs) for substation design packages.
◦ Prepare, update and support the project execution engineering
activities in the schedule with emphasis on; On-time delivery, Quality
of deliverables and Project costs. Notify the Director of
Engineering and the Project Manager of any difficulties encountered. In
the engineering and design that may adversely impact safety, reliability,
quality, cost, or schedule.
◦ Perform technical, cost savings, and constructability reviews of design
packages from internal engineering, outsourced sub-contractor
engineering and equipment factories.
◦ Provide substation project management support, including managing
engineering scope according to technical contracts, equipment
procurement, developing change orders, and maintaining
project schedules.
Attend kick-off meetings as per agenda (for any new activity) and to
understand &monitor the contractors action plan and schedule.
◦ Coordination with affiliate discipline representative and contractor
personnel to make the job easy for execution. Conduct meeting with
contractors construction personnel to find out the
reasons for the delays and resolve issues.
◦ Monitor during project execution and ensure all the activities are
performed as per schedule and expedite the process in case of delay.
◦ Reviewing of all Electrical Shop Drawing against Design Drawings for
Consultant approval
◦ Preparation and Review of Material submittals for Electrical systems for
consultant approval.

Company industry:
Construction & Building
Job role:
Electrical Engineering

Project Engineer

June 2016 - January 2018

System House Factory for Electric Panels-

Riyadh, Saudi Arabia

June 2016 - January 2018

• Work with the proposal team to ensure that the sub-contractor scope of work is clearly
defined, that contract Terms & CondiƟons include appropriate flow downs, and that risks
are properly allocated between Main contractor and the sub-contractors
• Lead the development of single-line diagrams, layout drawings, raceway systems,
grounding systems, staƟon service and Bill of Materials (BOMs) for substaƟon design
packages.
• Prepare, update and support the project execuƟon engineering acƟviƟes in the schedule
with emphasis on; On-Ɵme delivery, Quality of deliverables and Project costs. NoƟfy the
Director of
• Engineering and the Project Manager of any difficulƟes encountered. In the engineering
and design that may adversely impact safety, reliability, quality, cost, or schedule.
• Perform technical, cost savings, and constructability reviews of design packages from
internal engineering, outsourced sub-contractor engineering and equipment factories.
• Provide substaƟon project management support, including managing engineering scope
according to technical contracts, equipment procurement, developing change orders,
and maintaining
• project schedules.
• AƩend kick-off meeƟngs as per agenda (for any new acƟvity) and to understand &monitor
the contractors acƟon plan and schedule.
• CoordinaƟon with affiliate discipline representaƟve and contractor personnel to make the
job easy for execuƟon. Conduct meeƟng with contractors construcƟon personnel to find
out the
• reasons for the delays and resolve issues.
• Monitor during project execuƟon and ensure all the acƟviƟes are performed as per
schedule and expedite the process in case of delay.
• Reviewing of all Electrical Shop Drawing against Design Drawings for Consultant approval
• PreparaƟon and Review of Material submiƩals for Electrical systems for consultant
approval.

Company industry:
Manufacturing
Job role:
Engineering

Electrical QC Inspector

January 2013 - January 2016

Sendan International Company

Jubail, Saudi Arabia

January 2013 - January 2016

1)
3) KSA
• Supervised the installation of 230kV GIS (Gas
Switchgear) and 13.8kV SWGR, ensuring the complete system
was installed in compliance with design specifications, project
standards, and safety regulations.
• Led the installation of power transformers, including all necessary
accessories such as radiators, conservator tanks, cooling fans,
and electrical connections, ensuring the equipment was tested
and verified for functionality and operational readiness.
• Managed the installation of auxiliary transformers, dry-type
lighting transformers, and all associated systems, including
protection systems, cable ladder and support systems, AC & DC
systems, MV cable bus, and communication systems, ensuring
seamless integration and functionality.
• Conducted installation and material receiving inspections of UPS
systems, battery racks, and emergency generators, overseeing
charging and discharging tests to verify system functionality and
ensure that backup power systems met operational standards and
specifications.
• Led the installation and functional testing of various critical
electrical components, including lighting panels, load break
switches, junction boxes, lighting fixtures, heat tracing panels, and
heating cables, ensuring all systems were installed according to
project requirements and were fully operational before
commissioning.
• Oversaw material receiving, installation and pre-commissioning
testing of MV & LV MCCs, Control Gear, and switchgear.
• Prepared and raised INCR (non-conformity reports) for any
observed non-conformities during routine inspections and
implemented preventive actions to avoid rework.

Company industry:
Construction & Building

Engineer

January 2012 - January 2013

SMR Builders Private Limited- Electrical

Hyderabad, India

January 2012 - January 2013

• Supervised site operations to ensure all construction and
electrical works were carried out efficiently, adhering to project
timelines and quality standards. Monitored work progress, safety
protocols, and compliance with regulations to ensure smooth
project execution.
• Managed the installation of electrical equipments eg: LV
transformer, UPS and Battery system, LV Panels and ATS.
• Consistently ensured that all work was performed to meet or
exceed project requirements, maintaining a high level of quality
and performance on-site.
• Compiled daily activity reports documenting site progress,
challenges, and milestones achieved, providing accurate
feedback to project manager.

Company industry:
Construction & Building

Education

Jawaharlal Nehru Technological University

May 2012

May 2012

Bachelor's degree, Electrical Engineering

India

GPA (percentage): 67%

GPA (percentage): 67%

Jawaharlal Nehru Technological University

May 2012

May 2012

Bachelor's degree, Electrical Engineering

India

GPA (percentage): 67%

GPA (percentage): 67%

Skills

COMPLIANCE REPORTING
Intermediate
COMPLIANCE REPORTING
Intermediate
COMPUTER AIDED ENGINEERING CAE
Intermediate
COMPUTER AIDED ENGINEERING CAE
Intermediate
COMPUTER PROGRAMMING
Intermediate
COMPUTER PROGRAMMING
Intermediate
CONTRACT MANAGEMENT
Intermediate
CONTRACT MANAGEMENT
Intermediate
ELECTRICAL ENGINEERING
Intermediate
ELECTRICAL ENGINEERING
Intermediate
IEC 60065
Intermediate
IEC 60065
Intermediate
IEEE 12207
Intermediate
IEEE 12207
Intermediate
QUALITY CONTROL
Intermediate
QUALITY CONTROL
Intermediate
RESULTS FOCUSED
Intermediate
RESULTS FOCUSED
Intermediate
TESTNG
Intermediate
TESTNG
Intermediate
COMPLIANCE REQUIREMENTS
Intermediate
COMPLIANCE REQUIREMENTS
Intermediate
COMPLIANCE TESTING
Intermediate
COMPLIANCE TESTING
Intermediate
COMPUTER AIDED ENGINEERING CAE
Intermediate
COMPUTER AIDED ENGINEERING CAE
Intermediate
COMPUTER HARDWARE
Intermediate
COMPUTER HARDWARE
Intermediate
COMPUTER SYSTEMS
Intermediate
COMPUTER SYSTEMS
Intermediate
CONTRACT MANAGEMENT
Intermediate
CONTRACT MANAGEMENT
Intermediate
GROUNDING SYSTEMS
Intermediate
GROUNDING SYSTEMS
Intermediate
IEEE 12207
Intermediate
IEEE 12207
Intermediate
QUALITY CONTROL
Intermediate
QUALITY CONTROL
Intermediate
RESULTS FOCUSED
Intermediate
RESULTS FOCUSED
Intermediate