مهندس كهرباء استشاري ..ممثل الشركة السعودية للكهرباء
Saudi Electricity Company
Total years of experience :13 years, 4 Months
.• \[5 years\] SNR. Electrical engineer(head of the Department of H.V (U/G Power cables/OH TL at the sight(project sight manger) at BAKAWI INVESTMENT & PETROLUM SERVICES CO.LTD main contract with international GNPOC
I am responsible for preparing Technical report, Quotation (cost proposal )&directly Implementation of all U/G Projects construction including Erection, installation, digging U/G Cable trench, laying U/G Cables with the full right processors like sand bedding, cable tiles .gravel, compact the land, …etc. As per standard.
Also, Installation, earthing, termination & joint by right processors for U/G Cables.
Also, all necessary check, testing (like megger test hippo tester H.V test, continuity test….etc.), invoicing &commissioning processors as per standard.
• \[2 Years\] SEC EHV U/G Cable Electrical Site Consultant at Saudi Electricity Company- EHV Projects Department WOA & SOA
EHV Projects & Engineering Sector - WOA
Elect .consultant for EHV 380 KV U/G Cable project at SEC-WOA (EL-Medina EL-Monwara) 3 CKT's : One CKT from MDC (NEW SUBSTATION) TO MDE(EXISTING SUBSATION ) & DOUPLE CKT From MDC to MDE (EXISITING SUBSTATION ).To do all & full supervision, follow up, witnessing, reporting & approved all activities & Materials at site of the project, Inspection, Reviewing the approval, Testing and final hand over of Installation As per approved drawings , approved documents, approved specification/approved FAT Report & as per SEC Standard &Contract.
Installation, Testing and construction of 380 kV power cable from Al-Adel BSP-KMT Transition area6 km, 380kV power cable from Al-Adel BSP- JAM BSP and 6km, 380kV power cable from Al-Adel BSP- JDSPP transition area.
Implementation the activities though so strict quality / safety procedures:-
at the petroleum company projects / SEC EHV Projects :-
• Safety permits before the work & with strict applying for all points of the permit (hot/cold permit, electrical isolation permit. excavation permit, scaffolding safety permit, lifting permit, for closed area (confined space), Gas test ...etc. ).
• Preparing & implementation JHA Job Hazard Analysis especially at Risk /critical activities & activities at Risk /critical condition to assure safe practice (safe method) & safe condition (safe the location or the environment of the work) together.
• Special safety procedures for confined space.
• Preparation for safety plan & practice it.
• Supervision, Observation, monitoring with strict applying to safety procedures like PPE for Labour, TUV/licence for Drivers/operator & Updated Inspection stickers for the equipment's, DCC licence for driving at field of petroleum area.
• Prevent any work at un- safe condition or by unsafe manner or unsafe way.
• Applying strictly SEC 5 starts SAFETY Program / procedures.
• Periodic follow up, safety/QC report, Inspection For the safety /QC at the site & issuing Site Instructions for Safety /QC Violations.
• Periodic safety/QC meting / Trainings/lectures /drilling /seminar.Etc.
• Appling strictly all the requirement of QC/QA/SAFETY & their Procedures including but not limited for SEC 5 starts SAFETY, GNPOC SAFETY Procedures (at the petroleum area), PTS, SEC Standard, Intrnational standard like IEC, IEEE.Cmpany contract /scope of requirements. Etc.
•
Duties & Responsibilities for above :
• Installation and construction of 380 kV power cable BSP's (S/S).
• 380 kV underground cable laying, Installation, earthing, jointing, termination, commissioning, testing… etc.
• Special technical / Administrative supervision to joint/termination area including but not limited (bonding cable connections, Link Box Istallation, SVL installation, Professional Earthing works, cable support, cable clamps Installation& preparation of civil protection /construction for this so important accessories ).
• Special technical / Administrative supervision for FO System (Fibber OPTIC SYSTEM.
head of the Department of H.V (U/G Power
cables/OH TL at the sight(project sight manger) at BAKAWI
INVESTMENT & PETROLUM SERVICES CO.LTD main contract with
international GNPOC
I am responsible for preparing Technical report, Quotation (cost proposal
)&directly Implementation of all U/G Projects construction including Erection
, installation, digging U/G Cable trench, laying U/G Cables with the full right
processors like sand bedding, cable tiles .gravel, compact the land, …etc. As per
standard.
Also, Installation, earthing, termination & joint by right processors for U/G
Cables.
Also, all necessary check, testing (like megger test hippo tester H.V test,
continuity test….etc.), invoicing &commissioning processors as per standard.
* \[2 Years\] SEC EHV U/G Cable Electrical Site Consultant at Saudi Electricity
Company- EHV Projects Department WOA & SOA
EHV Projects & Engineering Sector - WOA
Elect .consultant for EHV 380 KV U/G Cable project at SEC-WOA (EL-Medina
EL-Monwara) 3 CKT's : One CKT from MDC (NEW SUBSTATION) TO
MDE(EXISTING SUBSATION ) & DOUPLE CKT From MDC to MDE
(EXISITING SUBSTATION ).To do all & full supervision, follow up
, witnessing, reporting & approved all activities & Materials at site of the project
, Inspection, Reviewing the approval, Testing and final hand over of Installation
As per approved drawings, approved documents, approved
specification/approved FAT Report & as per SEC Standard &Contract.
Installation, Testing and construction of 380 kV power cable from Al-Adel BSP-
KMT Transition area6 km, 380kV power cable from Al-Adel BSP- JAM BSP
and 6km, 380kV power cable from Al-Adel BSP- JDSPP transition area.
Implementation the activities though so strict quality / safety procedures:-
at the petroleum company projects / SEC EHV Projects :-
* Safety permits before the work & with strict applying for all points of the permit
(hot/cold permit, electrical isolation permit. excavation permit, scaffolding
safety permit, lifting permit, for closed area (confined space), Gas test ...etc. ).
* Preparing & implementation JHA Job Hazard Analysis especially at Risk
/critical activities & activities at Risk /critical condition to assure safe practice
(safe method) & safe condition (safe the location or the environment of the
work) together.
* Special safety procedures for confined space.
* Preparation for safety plan & practice it.
3 | Page
* Supervision, Observation, monitoring with strict applying to safety procedures
like PPE for Labour, TUV/licence for Drivers/operator & Updated Inspection
stickers for the equipment's, DCC licence for driving at field of petroleum area.
* Prevent any work at un- safe condition or by unsafe manner or unsafe way.
* Applying strictly SEC 5 starts SAFETY Program / procedures.
* Periodic follow up, safety/QC report, Inspection For the safety /QC at the site &
issuing Site Instructions for Safety /QC Violations.
* Periodic safety/QC meting / Trainings/lectures /drilling /seminar.Etc.
* Appling strictly all the requirement of QC/QA/SAFETY & their Procedures
including but not limited for SEC 5 starts SAFETY, GNPOC SAFETY
Procedures (at the petroleum area), PTS, SEC Standard, Intrnational standard
like IEC, IEEE.Cmpany contract /scope of requirements. Etc.
*
Duties & Responsibilities for above :
* Installation and construction of 380 kV power cable BSP's (S/S).
* 380 kV underground cable laying, Installation, earthing, jointing, termination,
commissioning, testing… etc.
* Special technical / Administrative supervision to joint/termination area including
but not limited (bonding cable connections, Link Box Istallation, SVL
installation, Professional Earthing works, cable support, cable clamps
Installation& preparation of civil protection /construction for this so important
accessories ).
* Special technical / Administrative supervision for FO System (Fibber Optic
system) Installation, laying, Termination, Splicing, Testing (e.g. OTDR test) &
Commissioning as per Standard /Requirements/
(Electrical & Electronic Engineering(Honours