Summer training student
ARASCO
Total years of experience :0 years, 4 Months
1.given a flow chart of the SITE to find the path of the each operation.
2.calculate the power demand of each of each operation.Then, find the operation that can be run simultaneously and find the total power for that.
3.presenting and report all of the results to Project Manager.
computer maintenance.
Graduated with 2nd Honour Elective Courses: Photonic & Optical Communication Geophysical signal processing. Power System Analysis. Electrical Machines