Technician
Aggreko
Total years of experience :10 years, 7 Months
Technician at Aggreko power plant for supply power to Libya Power (IP) 120MW, job responsibility for commissioning power project for engine generator 125kVA. Monitoring scada monitor at control room for identify trouble shooting generator suck as breakdown and maintenance for 136 unit of engine generator. Run preventive maintenance schedule every unit for 136 of generator (125kVA) both Mechanical checklist and electrical checklist (A service, B service, C service or health check, fuel service, major repair and general overhauling).
The plant delivery system as employed by APR Energy plants is a collection of packaged functions .when the system is commissioned, site personnel are monitor its function and perform maintenance on system components as necessary. The system is designed to story process and forward fuel oil
The fuel delivery system has the following sub- function:
• fuel oil storage
• Fuel purification and filtration processes
• Fuel conversion and distribution
● University: Faculty of Engineering, Al-Mergheb University. Current degree: B.Sc. in Chemical Engineering 2013. • Natural Gas Engineering. • Oil Refinery. • Water Treatment Technologies. • Industrial Equipment design (Distillation column, Heat Exchanger, separator , Storage tank)