• Coordination of four 380/33K Substations between SEC and Contractor, Design and construction of 4 no’s 33KV interconnection switching stations, 18 no’s 33/0.750 KV DC traction Substations, 37 no’s 33/0.4KV Auxiliary substations, Stray current and 750V Third/Conductor rail System
• Responsible for design and installation of Auxiliary Substations, traction Substations and 750VThird(3rd) rail system along the 41KM of line and all related issues right from Primary Engineering to Detailed engineering and finalize the issues in smooth manner within the scheduled dates.
• Directly coordinating with the contractors regarding project activities such as the construction, installation, maintenance, support, documentation, and testing activities to ensure compliance with specifications, codes, and client’s requirements
• Reviewing operational process and installations to ensure that the subcontractors comply with the design, standards and specifications of the contract documents
• Ensuring the subcontractors comply with operational and safety standards