Total Years of Experience: 18 Years, 9 Months
December 2018
To Present
Senior Mechanical Project Engineer
at Saifco
Location :
United Arab Emirates - Dubai
Working as mechanical head in construction of ALOFT Hotel in Dubai, which consist from basement, ground, Four floors and Roof.
My scope of works was:
A. Preparation of material submittals for HVAC and Plumbing.
B. All Engineer works not limited to ESP calculation, Pump head calculation, Shop Drawings and verification of IFC design.
C. Lead the Team and supervise the execution.
D. Attendance of meetings with main contractor and Consultant.
My scope of works was:
A. Preparation of material submittals for HVAC and Plumbing.
B. All Engineer works not limited to ESP calculation, Pump head calculation, Shop Drawings and verification of IFC design.
C. Lead the Team and supervise the execution.
D. Attendance of meetings with main contractor and Consultant.
October 2013
To December 2018
Senior Mechanical Project Engineer
at Drake &Scull Engineering
Location :
Jordan - Amman
Hotel in Abdon, Jordan which consist from common 4 basements, ground and 3 buildings of 17th floors.
My scope of works was:
•Lead the Team and supervise the execution.
•Preparation of material submittals for HVAC and Plumbing.
•Manage and follow up site works for all mechanical systems & other related works for the Project.
•Preparation of Shop Drawings as per specification and contract drawings.
•Attendance of meetings with main contractor and client.
•Calculate ESP for all FCU’s, AHU’s & Fans
•Calculate Head of all Domestic, chilled, heating and submersible pumps.
•Testing and Commissioning of HVAC and Plumbing Systems
My scope of works was:
•Lead the Team and supervise the execution.
•Preparation of material submittals for HVAC and Plumbing.
•Manage and follow up site works for all mechanical systems & other related works for the Project.
•Preparation of Shop Drawings as per specification and contract drawings.
•Attendance of meetings with main contractor and client.
•Calculate ESP for all FCU’s, AHU’s & Fans
•Calculate Head of all Domestic, chilled, heating and submersible pumps.
•Testing and Commissioning of HVAC and Plumbing Systems
February 2012
To September 2013
mechanical project engineer
at Abniah Electromechanical Construction
Location :
Jordan - Amman
A. Lead the Team and supervise the execution.
B. Manage and follow up site works for all mechanical systems & other related works for the Project.
C. Preparation Shop Drawings submittal as per specification and contract drawings.
D. Attendance of meetings when required.
E. Prepare builders work drawings.
F. Prepare coordination drawings.
G. Making A/C load calculation and redesign HVAC system due to 30% A/C load reduction.
H. Calculate ESP for all FCU’s, AHU’s & Fans
I. Calculate Head of all Domestic, chilled, heating and submersible pumps.
B. Manage and follow up site works for all mechanical systems & other related works for the Project.
C. Preparation Shop Drawings submittal as per specification and contract drawings.
D. Attendance of meetings when required.
E. Prepare builders work drawings.
F. Prepare coordination drawings.
G. Making A/C load calculation and redesign HVAC system due to 30% A/C load reduction.
H. Calculate ESP for all FCU’s, AHU’s & Fans
I. Calculate Head of all Domestic, chilled, heating and submersible pumps.
February 2010
To January 2012
project engineer mechanical engineer
at Amana Contracting And Steel Buildings
Location :
United Arab Emirates - Abu Dhabi
A. Mobilize the site activities for execution of MEP works.
B. Lead the Team and supervise the execution.
C. Presentation of all necessary documents such as Shop Drawings and Method Statements and Coordination with Main Contractor and Consultant.
D. Manage and follow up site works for all mechanical systems & other related works for the Project.
E. Preparation of Material Submittal and Shop Drawings submittal as per specification and contract drawings.
F. Make actual quantity take-off from approved shop drawings.
G. Procure the required materials and accessories to ensure on-time delivery at site.
H. Coordinate with all the services for execution as well as interacting with the consultants to improve the quality with cost effective methods. Monitoring work progress and keep all records.
I. Attendance of meetings when required.
J. Prepare builders work drawings.
K. Prepare coordination drawings.
L. Making A/C load calculation.
M. Calculate ESP for all FCU’s, AHU’s & Fans
B. Lead the Team and supervise the execution.
C. Presentation of all necessary documents such as Shop Drawings and Method Statements and Coordination with Main Contractor and Consultant.
D. Manage and follow up site works for all mechanical systems & other related works for the Project.
E. Preparation of Material Submittal and Shop Drawings submittal as per specification and contract drawings.
F. Make actual quantity take-off from approved shop drawings.
G. Procure the required materials and accessories to ensure on-time delivery at site.
H. Coordinate with all the services for execution as well as interacting with the consultants to improve the quality with cost effective methods. Monitoring work progress and keep all records.
I. Attendance of meetings when required.
J. Prepare builders work drawings.
K. Prepare coordination drawings.
L. Making A/C load calculation.
M. Calculate ESP for all FCU’s, AHU’s & Fans
December 2008
To January 2010
Senior Mechanical Engineer
at Masters Electromechanical Consultant
Location :
United Arab Emirates - Dubai
A. Coordinate with Architect for Mechanical space requirements including location of mechanical floor, cooling tower, pump room, chillers.
B. Determine type of chillers to be used either water cooled chillers with cooling towers or air cooled chiller.
C. Attendance of meeting with client & main consultant.
D. Prepare Design Concept Report and discuss it with client then Tender Drawings and finally Issued for Construction Drawings.
E. Making A/C load calculation using HAP program.
F. Design Fire Fighting system based on NFPA and local Authorities regulations.
G. Design Drainage system based on BS Standard and local Authorities regulations.
H. Design Water supply system based on BS Standard, ASHREA Standard and local Authorities regulations.
I. Design HVAC system based on ASHREA Standard and local Authorities regulations.
J. Leading Engineers & Draughtsman, distributing the work and manage work progress.
K. Coordinate and obtain approval from local authorities.
L. Answering All RFI (Request for Information) send by Contractor and coordinate meetings if required.
M. Preparing Mechanical specification.
B. Determine type of chillers to be used either water cooled chillers with cooling towers or air cooled chiller.
C. Attendance of meeting with client & main consultant.
D. Prepare Design Concept Report and discuss it with client then Tender Drawings and finally Issued for Construction Drawings.
E. Making A/C load calculation using HAP program.
F. Design Fire Fighting system based on NFPA and local Authorities regulations.
G. Design Drainage system based on BS Standard and local Authorities regulations.
H. Design Water supply system based on BS Standard, ASHREA Standard and local Authorities regulations.
I. Design HVAC system based on ASHREA Standard and local Authorities regulations.
J. Leading Engineers & Draughtsman, distributing the work and manage work progress.
K. Coordinate and obtain approval from local authorities.
L. Answering All RFI (Request for Information) send by Contractor and coordinate meetings if required.
M. Preparing Mechanical specification.
December 2005
To December 2008
Designing Engineer
at Energy Engineering Consultant
Location :
United Arab Emirates - Dubai
A. Designing of A/C & Plumbing services.
B. Coordinate and obtain approval from local authorities.
B. Coordinate and obtain approval from local authorities.
August 2005
To December 2005
Production Engineer
at HKJ Abdin Company
Location :
Jordan
Designing the cooling units of refrigerators and freezers
•Designing cooling rooms
•Supervisor on the cooling department workers
•Maintaining freezers, refrigerators and cooling rooms
Training & Workshops
•Designing cooling rooms
•Supervisor on the cooling department workers
•Maintaining freezers, refrigerators and cooling rooms