محمد السباعي, Project Manager/ Project Director

محمد السباعي

Project Manager/ Project Director

Qatar Trading & Contracting Group

البلد
قطر - الدوحة
التعليم
بكالوريوس, Civil Engineering
الخبرات
10 years, 10 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :10 years, 10 أشهر

Project Manager/ Project Director في Qatar Trading & Contracting Group
  • قطر
  • نوفمبر 2013 إلى ديسمبر 2016

Client: ASHGHAL
Project Manager/ Project Director Projects Sewer Rehabilitation, replacement and repair frame Work Operation and maintenance Project
Contract under Ashghal Operation maintenance as end user the work was to inspect and maintain the drainage network and provide the full planning for the required activities day by day, provide and maintain the emergency plan - and provide weekly report for the networks and identify the defects in order to repair or enhance any part of the assets The work is under operation and maintenance super vision which contain any type of work related to Ashghal- including but not limited to Pipe line in trench, pipes trenchless, raising main, Manholes and all its connections, House connections and gullies, Soak ways and any type over pumping, lagoons and road works Project value: 240 Million QR.
Flow Diversion Scheme for pump station 31&pump station 5
Successful to complete the Construction of deep interceptor trunk / main sewers for diversion of flow from pumping stations PS 31, PS 5, PS 4, Amiri Diwan and Ministry of Interior (MOI). The works included the following but not limited:
• New 1200mm diameter Interceptor Sewer with length of 4 km & 800mm diameter sewer with length of 1 km using Non-Disruptive construction method techniques (NDM).
• Construction of 200mm and 400mm diameter sewers along route to integrate and make connections with the existing sewers and manholes using
• Construction of approximately 58 very deep GRP lined MH. & 2 diversion flow chambers with SS penstocks. Project value: 65 Million QR
Flow Diversion Scheme for pump station 12 B1 and pump station Barzan Camp: Successful to complete the Construction of deep interceptor trunk / main sewers for diversion of flow from pumping stations PS 21B1 at AL wajba Palace and Pump station for Barzan Camp The works included but not limited to the following: Construction of new 600mm diameter Interceptor Sewer with length of 2 km using Non Disruptive construction method techniques (NDM). Construction of 24 very deep GRP lined MH. Project value: 25 Million QR
Duties and Responsibilities:
• Provided all the resources required to the project to fulfil its work on time.
• Responsible for management of safety, scope, schedule and budget project resources for construction.
• Represented the company towards the employer, engineer, subcontractors, suppliers and all other authorities or agencies were required during the course of the project and the client relations.
• Protected the company's interests and promote its image.
• Directed, managed and controlled the project team, along with the subcontractors to ensure that objectives were met through all project phases in accordance with the procedures and company policies.
• Responsible to provide all the required resources to have smooth handing over for the projects and satisfy the end users with the requirements documents including but not limited to (NOCs, closing permits, as built, Clearance from authorities ---etc.)

Construction Manager /Project Manager في Al Huda Engineering Works
  • قطر
  • يونيو 2012 إلى نوفمبر 2013

• Project Construction of Supreme Education Council Headquarters Building The object of the project is to construct a new headquarters development for the SEC (supreme education council) in Qatar. The headquarters shall bring together various institutes that comprise the SEC into one. Purpose built facility and shall meet the specific requirements and growing needs of the SEC. the proposed site approximately 86, 000m² is located to the main entrance of Qatar University. The project comprises five interlinked, low rise buildings along with all associated services, infrastructure and pump station and parking Bays. Project value: 900 Million QR
Client Ministry of Education &Higher Education
Duties and Responsibilities:
• Responsibilities included managing and supervising all site activities.
• Ensuring Method Statements and Risk Assessments were read, understood and communicated efectively and delegating elements of the construction program to the work force.
• Run and managed all aspects of a construction site.

Sr. Construction Manager في Kharafi National for Mechanical and Electrical
  • مصر
  • ديسمبر 2010 إلى مايو 2012

Project Construction OF El Shabab Simple cycle 1000MW Power Plant. The project was part of the succour plan for the ministry of electricity to add 3500 MW to the electricity power in Egypt. The project consists of 8 gas turbines with total 1000 MW electricity. With all the civil works and the auxiliary's skids, water RO plant and Tanks, GIS (control switch), gantry Yard, administration and warehouse buildings, sub- stations, underground utilities, water treatment plant for cooling and sewage pump station landscape and roads. Project value: 520, 000, 000 US Dollars / EPC fast track project
Client Ministry of Electricity EGYPT Duties and Responsibilities:
• Responsibilities included managing and supervising all site activities.
• Ensuring Method Statements and Risk Assessments were read, understood and communicated efectively and delegating elements of the construction program to the work force.
• Run and managed all aspects of a construction site.
Construction Road Services Est. For General Contracting (1 March 2010 - 2 November 2010), KSA Project Manager Project Site Preparation for MUTRFIAH, Sector F3.Jubail Industrial City Royal Commission of Jubail at the request of private industries outside the Jubail industrial area intends to develop the district of Al Mutrafiah .The work to be accomplished under the project consists of rough grading of Mutrafiah sector F3, covering an area of approximately 242 hectares. Project value: 90 Million SR.

Project Manager في Al Huda Engineering Works
  • قطر
  • يوليو 2005 إلى يناير 2010

Project Construction OF the Remaining works for Crushed stone import facilities Roads & Bridges- Measied.
Client QATAR PETROLUM The work comprises the remedial, finishing and the construction completion of the crushed stone road. All the roads lied in Mesaieed industrial City and to be developed as an integrated network (approx.30 K.m). The Work includes completion of ancillaries to bridgeworks, reinforced earth retaining walls and pipeline culverts, street lighting and cabling, power supplies, indoor and package substations, Water TSE network, Surface water drainage network, telephone, data link and electrical crossing ducts and connections to the existing network, as well as the completion of earthworks, full and partial road pavement layers, Kerbs and barriers and all trafic signs, trafic signal gantries and height warning gantries . Project value: 160 Million QR
Duties and Responsibilities:
• Provided all the resources required to the project to fulfil its work on time.
• Responsible for management of safety, scope, schedule and budget project resources for construction.
• Represented the company towards the employer, engineer, subcontractors, suppliers and all other authorities or agencies were required during the course of the project and the client relations.
• Protected the company's interests and promote its image.
• Directed, managed and controlled the project team, along with the subcontractors to ensure that objectives were met through all project phases in accordance with the procedures and company policies.

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في Alexandria University
  • يونيو 1990

Specialties & Skills

Economics
Matrix Management
Change Orders
Primavera
Payments
CONSTRUCTION
IRRIGATION (LANDSCAPING AND AGRICULTURE)
MANAGEMENT
EARTHWORKS
INFRASTRUCTURE
UNPLASTICIZED POLYVINYL CHLORIDE (UPVC)
PROJECT RESOURCES
SWIMMING

اللغات

الانجليزية
متمرّس

التدريب و الشهادات

Traffic management. Work zone management (تدريب)
معهد التدريب:
International traffic federation
تاريخ الدورة:
December 2020
المدة:
30 ساعة

الهوايات

  • Football