Mohammed Hamed, O&M Industrial wastewater Treatment Plant Superintendent

Mohammed Hamed

O&M Industrial wastewater Treatment Plant Superintendent

Marafiq Saur

Lieu
Arabie Saoudite - AlJubail
Éducation
Baccalauréat, Mechanical Engineer
Expérience
19 years, 1 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :19 years, 1 Mois

O&M Industrial wastewater Treatment Plant Superintendent à Marafiq Saur
  • Arabie Saoudite - AlJubail
  • Je travaille ici depuis mai 2016

• Operation and maintenance for Industrial Treatment plant with Total Capacity 140, 000m3/day.
• Manage a team of 100 engineers and technicians including hiring, evaluating; training and development
• Manage and monitoring the Environmental, Health and Safety of the process areas
• Prepare and control yearly budget for Opex and Capex for more than ‘50MSAR’.
• Involve in reviewing the new Expansion design of additional treatment capacity of 160, 000m3/day ‘800MSAR’.
• Coordinate with all industrial customers (more than 65 large petro-chemical industries) to comply with plant Influent regulations.
• Maintain and comply with the Outfall quality in line with the Royal Commission for Jubail and Yanbu, and the Saudi Environmental Standards.
• O&M for an advanced chemical oxidation treatment system, 'FENTON', which is designed to treat hard COD.

O&M Wastewater Network Superintendent à Marafiq Saur
  • Arabie Saoudite - AlJubail
  • octobre 2014 à mai 2016

Operate and maintain 1200KM pipe line for Industrial and sanitary wastewater .
Operate and maintain more than 400nos. pump and lift Stations of total Flow capacity for more than 280, 000m3/day.
Prepare and control Yearly Budget for Opex and Capex for more than 35MSAR.

Project Manager à Ghantoot Gulf Contracting Co.
  • Émirats Arabes Unis - Dubaï
  • juin 2013 à septembre 2014

Transmission Pipe Line FEWA Project 12W/2011 DN 100013k.m& 19W/2012 DN 600 8k.m:
Procurement, specification, Design routing profile, shop drawings and getting approval from Authorities, Installing of Pipe Rack 6meter Height 500meter length, RTU system, Dewatering system, Deep Excavations Embankment, Chambers as (Flow Meter, Flow Control Valve, Air valve, Wash out and Butterfly valve ), Wrapping System, Pipe Laying, Encasement, Protection slap and Thrust Block, Road Crossing NDRC as (Thrust Boring, HDD and Microtunneling) for Pressure Line DIA 600mm & 1000mm Ductile Iron pipes & restraint pipes, preparation of pressure test and Sterilization).

Senior Project Engineer à Belhasa Project LLC
  • Émirats Arabes Unis - Dubaï
  • septembre 2011 à juin 2013

Transmission Pipe Line FEWA Project 08W/2011 DN800 36k.m:
1. Procurement, specification and Installing of Dewatering system, Deep ‎Excavations and Embankment, (Air valve, Wash out, Butterfly valve and Flow ‎Meter Chamber), Wrapping System, Pipe Laying, Encasement, Protection slap ‎and Thrust Block, Road Crossing as HDD, Thrust Boring and Microtunneling for ‎Pressure Line DIA 600mm, 800mm & 1000mm Ductile Iron pipes & restraint ‎pipes, preparation of Pin Hole test and pressure test, pH, chlorine test and ‎Sterilization).‎
2. Plan and schedule the work and efficiently organize the Site/facilities in order to ‎meet the agreed program.‎
3. Attending regular meeting with clients and keeping them informed ‎about progress.‎
4. Preparing routing profile, shop drawings and getting approval from consultant.‎
5. Coordinate with suppliers to adjust the material order.‎
6. Reporting to the Project Manager about all work running on the site.‎
7. Preparing change order/work variation orders for additional works given by the ‎client.‎
8. Maintaining standards of safety and comply with Health, Safety & Environment ‎management system requirement.‎

Senior Project Engineer à JOG Union Engineer
  • Émirats Arabes Unis - Ras al-Khaimah
  • juillet 2007 à novembre 2012

1.Procurement, specification, Installing & commissioning of MEP work of Ras Al Khaimah sewerage project Phase #01& #02 (pump and lift stations) Use GRP, D.I, S.S, HDPE & G.I Pipes. Project Value 200, 000, 000.00AED
2.Operate and maintenance of Generator Caterpillars (2M.W) for main pump Station in Ras Al Khaimah.
3.Mechanical installation of Surge Vessel with associated components.
4.Operation and Maintenance of Mechanical Bar Screen for main pump station of Ras Al Khaimah
5.Plumbing works - Installation & commissioning for several Projects including the Ras Al Khaimah Corniche project.
6.Installation of HDPE pipes as part of the infrastructure works for Yasmine Village project.
7.Skilled in using SAP system as project manager, for the issue of internal, external orders & Quotations.
8.Installation of pumping station (capacity 100 kW) for the Ras Al Khaimah sewerage treatment plant.
9.Installation of lifting station for the Saif hospital (RAK) (Capacity 13.5 kW).
10.Procurement, specification and Installing of MEP Pump Stations Al Marjan Island #3 &#4 including (Odour Control Unit, Self Priming Pumps(75K.w &75l/s), Prime Generators Closed Type(400&250KVA), Mono Rail Crane(2Ton), GRP and Carbon Steel Pipes, Control Panel, Instrumentation System, Fire Fighting and Fire Alarm System, Earthing System and Cabling System.
11.Procurement, specification and Installing of Dewatering system, Deep Excavations, Air valve chamber, Wash out Chamber, Gate valve chamber, Pressure Lines, Wrapping tape and Sleeves isolation DIA 600mm, & 800 mm Ductile Iron pipes & restraint pipes, preparation of pressure test pH & chlorine test for Di pipes) for FEWA 8W/2011 water line in UQA city.
12.Attending regular meeting with clients and consultants and keeping them informed about progress.
13.Coordinate with suppliers to adjust the material order.
Reporting to the Project Manager about all work running on the site.
14.Maintaining standards of safety and comply with Health, Safety & Environment management system requirement.

Maintenance Engineering à NEEASAE Company
  • Egypte - Alexandrie
  • juin 2003 à juillet 2005

Maintenance Engineer in Glass Factory, Periodic and Preventive Maintenance, Planning and Execution.

Éducation

Baccalauréat, Mechanical Engineer
  • à B.Sc. Faculty of Engineering Alexandria University 5 years
  • juin 2003

Summer Training in Alexandria Shipyard.

Specialties & Skills

Infrastructure Projects
Pump Stations
Project Engineering
Maintenance Engineering
Computers
SAP System
able to plan and prioritise, work to deadlines and under pressure.
able to solve problems using both logic and creative/innovative approaches.
cost/value-conscious and aware of the necessary social, cultural, environmental, health and safety.
Autocad
primavera
Team Management and Leadership

Langues

Anglais
Expert
Arabe
Langue Maternelle

Adhésions

Engineers Association
  • Member
  • June 2003
Saudi Council of Engineers
  • Professional
  • October 2014
TUV SUD Middle East
  • ISO 9001:2008, ISO 14001:2004, OHSAS 18001:2007
  • August 2016

Formation et Diplômes

Internal Auditor Training (Formation)
Institut de formation:
TUV SUD Middle East
Date de la formation:
August 2016
Durée:
24 heures
Project Managements (Formation)
Institut de formation:
GLOMACS
Date de la formation:
September 2016
Durée:
40 heures
Water & Wastewater Industry (Formation)
Institut de formation:
Endress+Hauser
Date de la formation:
October 2015
Durée:
40 heures
Integrated Management System (IMS) (Formation)
Institut de formation:
Marafiq Training Center
Date de la formation:
November 2014
Durée:
40 heures
Business Management and Public Relations (Formation)
Institut de formation:
International Computer Center
Date de la formation:
November 2003
ICDL (Formation)
Institut de formation:
Arab Academy for Science, Technology & Maritime Transport
Date de la formation:
September 2005
Installing of HDPE pipes (Formation)
Institut de formation:
Georg Fischer
Date de la formation:
August 2009

Loisirs

  • Reading, sports and swimming
    Table tennis with interest the scientific books