Senior Electrical Engineer
Saudi Binladin Group - Public Buildings And Airports Division
Total years of experience :16 years, 1 Months
Key Responsibilities:
• Responsible for all electrical work in the tunnel, like power, lighting, & low current system.
• Responsible for handling project activities, including determining various requirements concerning equipment, materials, manpower, and overall project operation to ensure timely completion.
• Development of Electrical Shop drawings for approval
• Complete Supervision of ongoing activity at the site & weekly meetings
• Technical Support/Evaluation of projects, analysis of kind of construction and resources involved.
• Coordination with other disciplines in preparation of their respective drawings/schedule
Key Responsibilities:
• Preparation of work scope, detailed construction schedule, activity sequencing, manpower, material, & equipment forecast.
• Manage project development processes, activities, and resources.
• Technical Support is needed to complete the project before the milestone.
• Meeting with clients and other engineers to ensure projects are completed to specifications.
• Establishing relationships with clients, vendors, suppliers, and other professionals and expanding networks
• Ensuring a safe, positive work environment.
• Management/Execution/Maintenance of complete Electrical (LV/MV) work.
• Site visit, study of contract details Code & Standards.
Key Responsibilities:
• Conducting audit site survey, mockup installation, technical support installation, testing, and commissioning.
• Contributing to optimizing the total system, including the ETN Central Battery System and the Philips DALI Dynalite Lighting Control System.
• Identified electrical faults and applied preventative maintenance measures
• Providing lighting design, troubleshooting, programming, and fault detection.
• Reviewing Technical Submittals and preparing Shop Drawings and As-Built Drawings.
• Delivered specialist expertise to solutions for performing electrical activities across the site and completing the project within the prescribed scope, time, and quality.
• Effectively executed projects while ensuring optimum work control and productivity. Supported the manager in electrical load calculation for camp, cables, and cable routing.
• Instrumental in preparing single-line drawings, junction box drawings, field surveys, study diagrams, and other data to resolve power system problems.
• Provided leadership, organization, and coordination for preparing shop and as-built drawings using AutoCAD. Allocated various resources and resolved numerous technical problems, which improved the overall effectiveness of the project.
Key Responsibilities:
• Supervised the practical aspects of installation, drawings modification, commissioning, and maintenance of MICC cable, industrial sockets, and small power sockets in 66KV/11KV substation.
• Planned and developed work schedules and equipment usage schedules and tracked progress with subcontractors and suppliers to ensure seamless execution of electrical works.
• Prepared detailed drawings, performed fabrication supervision, and conducted field QA/QC to ensure the design specification performs construction work.
• Coordinated detailed phases of engineering work for cable tray and HVAC duct; ensured alignment with shop drawings, as-built drawings, specifications, and industry and client standards.
Key Responsibilities:
• Examined/analyzed the electrical drawings, technical specifications, and other power-generating and distribution documents.
• I was involved in electrical testing and commissioning activities on-site, including a functional test for the 115KV remote control panel, protection panel, 13.8KV Switchgear, 4.16K Switchgear, 480V Switchgear, MCC, Annunciator panel, digital fault recorder panel.
• Participated in the technical evaluation of electrical works through various tests, encompassing the Continuity test, Megger test, Hi-Pot test, Stability test, Burden test, and point-to-point or loop test.
• I performed Primary and Secondary Injection tests of CT/PT. Additionally, I provided on-site support, carried out routine inspections, supervised the termination of Fiber optic cables, and inspected with the Power Distribution Department (PDD) of Saudi Aramco.
• Performed all required testing aligned with customers’ requirements and accordingly repaired components, assemblies, and tested equipment for compliance with specifications.