Total Years of Experience: 9 Years, 5 Months
February 2020
To Present
Fiber Optics Technician
at Freelancer
Location :
Jordan - Amman
Freelance fiber technicians.
Working on FIBERTECH CO. FTTH Project in (abu nseer, jubaiha, dahyat al rasheed) with LCC as subcontractor.
Working on FIBERTECH CO. FTTH Project in (abu nseer, jubaiha, dahyat al rasheed) with LCC as subcontractor.
September 2017
To January 2020
فني لحام فايبر
at العمرية للمقاولات OCC
Location :
Jordan - Amman
1
Splice the fiber optic cables
for ORANGE FTTH Project in
Amman (khadah, al-salheen, al-rabieh, al-redwan, jabal Amman, al-wehdaat, jabal, Al-Hussein, jerain, sport city, Tabarbour, )
Irbed (al-nuzhaa)
2
And splice the line for mobiles towers
and the companies or customers
that have vip point to point contracts
3
Splice the fiber optic cables
For ZAIN FTTH Project
In Amman (sport city, 8th circle)
4
And make the maintenance for Ministry of
Information and Communication Technology
In South of Jordan
5
Working on FIBERTECH CO. FTTH Project in Tabarbour and Tlaa al Ali.
.
Splice the fiber optic cables
for ORANGE FTTH Project in
Amman (khadah, al-salheen, al-rabieh, al-redwan, jabal Amman, al-wehdaat, jabal, Al-Hussein, jerain, sport city, Tabarbour, )
Irbed (al-nuzhaa)
2
And splice the line for mobiles towers
and the companies or customers
that have vip point to point contracts
3
Splice the fiber optic cables
For ZAIN FTTH Project
In Amman (sport city, 8th circle)
4
And make the maintenance for Ministry of
Information and Communication Technology
In South of Jordan
5
Working on FIBERTECH CO. FTTH Project in Tabarbour and Tlaa al Ali.
.
August 2016
To August 2017
Freelancer
at عمل حر
Location :
Jordan - Amman
Splice the fiber optic cables with subcontractor to ORANGE FTTH Project In Amman (shmisani, al-jandawil, abdoon, om-othainah)
October 2014
To July 2016
IT - Networking
at JCS internet
Location :
Jordan - Amman
• JCS (Jordan Cable Services): it is an Internet Service Provider Company through (Fiber Optic Technology).
In duration, Oct 2014 - Dec 2015 I had a three main jobs.
A. Activation: Provide Internet service to the customers through fiber optic cables (to Activate new contract we create distribution point near his building (Splice and terminate fiber cable in terminal box in his building (connect it to switch using media converter or connect it to ONU device if it is in new project area-FIBER TO HOME) and connect the customer office or home to it.
B. Technical support: Solve the maintenance and configuration issue to all the network parts (routers, ONU, switches, media converter and fiber cable cuts ((F12 - F72) FTTH, PATCH CORE) or fix the high attenuation in the lines by trace the line and measure the optical power in the enclosures and splitters).
C. Reconstruction: convert the old network to the Fiber to Home Project using PON (Passive Optical Network) by create link between the OLT in the source and the ONU in the destination, this include install and splice the splitter and distribution point..
• In duration, Jan 2016 - Feb 2016.
I worked in controls room to mentoring the network and the teams in the field receive the maintenance ticket and debugging it and give it for the teams in the field, to do this I work on several apps (OPMANAGER, CRM, CACTI Graphs, PUTY, CMD, ANM2000, IP scanner, GPS Google map, NAGIOS for UPS).
• In duration, Mar 2016 - Jul 2016.
I worked as coordinator of Controls Room.
In duration, Oct 2014 - Dec 2015 I had a three main jobs.
A. Activation: Provide Internet service to the customers through fiber optic cables (to Activate new contract we create distribution point near his building (Splice and terminate fiber cable in terminal box in his building (connect it to switch using media converter or connect it to ONU device if it is in new project area-FIBER TO HOME) and connect the customer office or home to it.
B. Technical support: Solve the maintenance and configuration issue to all the network parts (routers, ONU, switches, media converter and fiber cable cuts ((F12 - F72) FTTH, PATCH CORE) or fix the high attenuation in the lines by trace the line and measure the optical power in the enclosures and splitters).
C. Reconstruction: convert the old network to the Fiber to Home Project using PON (Passive Optical Network) by create link between the OLT in the source and the ONU in the destination, this include install and splice the splitter and distribution point..
• In duration, Jan 2016 - Feb 2016.
I worked in controls room to mentoring the network and the teams in the field receive the maintenance ticket and debugging it and give it for the teams in the field, to do this I work on several apps (OPMANAGER, CRM, CACTI Graphs, PUTY, CMD, ANM2000, IP scanner, GPS Google map, NAGIOS for UPS).
• In duration, Mar 2016 - Jul 2016.
I worked as coordinator of Controls Room.
Share on Facebook
Share on Twitter
Share Via Email