Senior Piping Engineer
SNC LAVLIN-KENTZ Engineering International Ltd
مجموع سنوات الخبرة :21 years, 0 أشهر
PROJECT ROLE: LEAD PIPING ENGINEER
• Estimation of Man-hours for the design phase of the project
• Provided support during start-up of projects, ensuring multidiscipline engineering and design efforts were completed in accordance with project scope, schedule, and costs.
• Supervise all team members to maintain the quality of the deliverable document, including Piping Material and piping stress analysis job to meet client standard, and International code requirement
• Manage and develop working plan to ensure the job delivery are within the budget and schedule.
• Coordinated with different discipline to identify any clash and to resolve queries during the engineering phase
• Conducted Constructability workshop with client and construction contractor to resolve any obstacles that may arise during the construction, since the complete construction has to be performed during limited shutdown time.
• Provided cost estimation and input to Planning for shutdown schedule.
PROJECTS COMPLETED
• Scrubber Upgrade Project for Train A, B & C, Maaden Phosphate Company Ras Al-Khair, Saudi Arabia.
• Replacement of Waste heat Boiler project, Maaden Phosphate Company Ras Al-Khair, Saudi Arabia.
• Installation of Aboveground Firewater Piping In MAADEN Phosphate Company.
• Feasibility study of Re-Routing of Cooling water Supply & Return line for Ethylene Cracker, HDPE, LDPE, PPX Plants, Tasnee Al Jubail.
PROJECT ROLE: SENIOR PIPING ENGINEER
• Stress Analysis of 36” Gas pipeline, Flange check, Support selection, Stress Report preparation.
• Underground pipe stress analysis.
• Preparation of Pipe Material Specification, Valve datasheet, Pipe wall thickness calculation.
• Preparation of Material Requisition, performing TBC, TBE & NMR review.
PROJECTS COMPLETED
• Design of 36” Sales Gas Pipeline (37 km) for Royal Commission of Jubail & Yanbu.
• Saudi Aramco In-Plant Facilities for Jizan- Abha Pipeline, Saudi Arabia.
• Design of Water treatment plant at King Abdullah University of Science & Technology (KAUST), Jeddah.
PROJECT ROLE: SENIOR PROJECT PIPING ENGINEER
• Performed Stress analysis for the system using CAESAR software.
• Completed the procurement activities of the critical long lead items before the Major Turnaround.
• Effectively coordinated with Plant operation, and construction team for smooth completion of the project.
• Prepared the ITB for construction contractor.
• Minimized error by effective planning so as to complete the project within the schedule during the Turnaround.
• Improved quality so as to minimize punch list items during the PSSR by effective co-ordination with different departments including Operation team.
PROJECTS COMPLETED
• Methanol Vapor Recovery Project
• Hydrogenerator Bypass Project.
• Compressor Turbine Generator project
• Installation of approx. 900 Mtrs. of 30” RTR pipe from SIPCHEM Phase III cooling tower to Phase II Plate heat Exchanger.
• Installation of MAn Tank Project
• Methyl Acetate Loading Piping
• Various Piping modification(MOC’s) during SIPCHEM Plant Shutdown
PROJECT ROLE: PIPING ENGINEER
• Preparation of 3D Piping Spec
• Pipe Line List & Valve List
• Preparation of IBR package.
• Vendor Data review of Equipments, Valve, & piping elements
• Stress Analysis of Piping system.
PROJECTS COMPLETED
• 1000 TPD Sulfuric Acid Regeneration Plant for Reliance-Bechtel Oil Refinery, Jamnagar Gujarat.
• 350 TPD Sulfuric Acid Regeneration Plant for Essar Oil Refinery, Vadinar Gujarat.
• 25 TPD Oleum Acid Plant for HENG-I, Taiwan.
• Site support for 3000 TPD Bunge Maroc Project, Jorf Lasfar, Morocco (Global Project).
PROJECT ROLE: PIPING ENGINEER
• Study and planning of Tie-in points.
• Planning & Execution of Shutdown.
• Checked Isometric & Piping Layout Drawings
• Checked & Prepared Piping and Valve MTO.
• Co-ordinate with other departments, Constant interaction with Client, and Vendors, site visits, etc.
PROJECTS COMPLETED
• Installation of the 2nd Stage Compressor Project for Petroleum Development of Oman (PDO) at Yibal Government Gas Power Plant.
• Installation of Storage Tanks at Oman Refinery Complex, Muscat, Oman.
Key Responsibilities
•Designing and modeling of equipment and the supports.
•Preparation of specification for pipe and the standard components.
•Preparation of piping layout from the P&ID and designing of pipe supports, including
•Nozzle orientation.
•Generation of BOMs/MTO, Isometric and GAD
•Conducting progress meeting with client
Project Successfully Completed
Waste immobilization project for BARC Nuclear power plant, Trombay.
Automobile Paint Project, Toledo Canada for Haden International
Project Successfully Executed:
Maintenance & Shutdown of Various units within the refinery
Key Responsibilities
•Conducting progress meeting with client.
•Project planning, scheduling and monitoring.
•Site supervision and management.