Mohammed Omar Bafakieh, Enterprise Program Management

Mohammed Omar Bafakieh

Enterprise Program Management

ncbs-mobily

البلد
المملكة العربية السعودية - جدة
التعليم
دبلوم,
الخبرات
16 years, 1 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :16 years, 1 أشهر

Enterprise Program Management في ncbs-mobily
  • المملكة العربية السعودية - الرياض
  • أشغل هذه الوظيفة منذ يونيو 2013

Leading multitasks in certain projects that are mostly correlated for one business benefits. Starting up the kick­off meetings and establishing the early actions of the project                         which are the most priority for maintaining quality of the project deliverables. Encouraging the project team, throughout the program especially, to be communicated often and deliver their tasks according to the planned project schedule.

Ericsson Telecom Projects as a consultant في Sky Telecom
  • قطر
  • أبريل 2012 إلى أغسطس 2012

Apr. 2012 - Aug. 2012 Ericsson Telecom Projects as a consultant by (Sky Telecom): Position Name: Project Planning and Design Consultant.

Leaded a team of a new project phases of The Fourth Generation Network
(LTE Long Term Evolution) Planning and Design in Jeddah city. Dealt with project scheduling and activities, which were keeping the team under the
requirements of the project scope to mitigate any out-scope actions. Organized the document update communication among the key stakeholders (Client,
Functional Manager, Project Manager, and The Project Team)
Managed the calculation dimensioning planning of the HSPA and LTE coverage and capacity of the both new relationship RF networks.

Project Planning & Design في Mobily Telecom Operator
  • المملكة العربية السعودية - جدة
  • ديسمبر 2004 إلى أبريل 2008

Dec. 2004 - Apr. 2008 Mobily Telecom Operator, Jeddah, Saudi Arabia
Position Name: Project Planning & Design in MND (Mobily Network
Development)

Planned locations for Radio sites, Skilled strategic solutions among the team to optimize time saving, Organizational/Team Design and Development,
Cross-Functional Project Team Leadership, Multi-Site, Multi-Project Operations.
Performed Quality Assurance for Radio Network Plan to validate the planned
deliverables that what will be received by contractors or another project team.

Assistant Project Manager في AL­Hugayet Contractor
  • المملكة العربية السعودية - ينبع
  • أبريل 2004 إلى ديسمبر 2004

Leaded heater pump gas projects in ARAMCO Yanbu refinery, Scheduled project duration and Planned RMS metric of service, assisted of who charged                     for testing the Systems and Activity Processes during quality inspection.

Telecom Engineer في MOSECO.
  • المملكة العربية السعودية - ينبع
  • يونيو 2003 إلى ديسمبر 2003

Worked in a new telecommunication project of Yanbu wastewater treatment plant. Connecting all monitor panels with the main station wirelessly for the Royal Commission City.

الخلفية التعليمية

دبلوم,
  • في College of Business, Florida Atlantic University
  • نوفمبر 2012

Nov. 2012 - Jan. 2013 Online Courses and Workshops: "College of Business, Florida Atlantic University, USA" a. Advanced Project Risk Management: Plan, Identify, Analyze, response, and monitor the project risks to approach project satisfaction in accordance with Advanced Techniques and valuations. SWOT Analysis, Delphi Technique, Expected Monetary Value Technique. a. Portfolio Management: Alignment knowledge processes that are lined up for evaluation, prioritization, Balancing and Governance project components. NPV, IRR, PP, and RoI are measurement evaluation for Monetary Strategic Project Evaluation. a. Earned Value Management: Primarily measures the past, present and estimate project planning, execution and control. By this measurement technique, the project will be tracked towards the targeted deadlines. PV, EV, and AC Techniques. 3/6 Mohammed OMAR Bafakieh, MPM Mohammed. - +966 50 4616921 - +1 (313) 444-4889

ماجستير,
  • في RMIT University
  • يوليو 2010

Mar. 2009 - Jul. 2010 Master of Project Management (Engineering): "School of Property, Construction, and Project Management, Faculty of Building and Architecture, RMIT University, Melbourne, Australia". - Skills have been learnt: a. Teamwork: Learned this concept by a project assignment has been given by the lecturer to resolve project scheduling and project deliverables of a park that has contaminated materials and renovate it again. Collecting requirements, Brainstorming, and Communication are utilized by the team member to obtain project success. b. Complete Project Assignment: Learned the group assignment, divided the group into subgroups where, at the same time, they are inevitable to collect the project requirements alone. Each group are experiencing two PM knowledge area as a task. c. Risk Management System (RMS): Learned this system with a lecturer has a long period experience in Project Risk Evaluation. Identifying Risk, Performing Qualitative and Quantitative Risk Analysis, and Responding Risk are the essentials of RMS.

بكالوريوس, Electronics and Communication Engineering
  • في King Abdulaziz University
  • مايو 2003

Aug. 1997 - May 2003 Bachelor of Science in Electronics and Communication Engineering: "King Abdulaziz University, Jeddah, Saudi Arabia". - Graduation Project: A group of three, combine the technology of Telecommunication and Programing in one project. It was a small alarm-clock with an Antenna connected wirelessly to any specific Masjid chosen by the alarm-clock owner.

Specialties & Skills

ASSOCIATE
INSPECTION
OPERATIONS
PROJECT MANAGER
PROJECT PLANNING
REFINERY
SOLUTIONS
TELECOM
TESTING

اللغات

الانجليزية
متمرّس
العربية
متمرّس