Mohammed Ibrahim Al-Zuhluf, Assistant Projects Manager

Mohammed Ibrahim Al-Zuhluf

Assistant Projects Manager

Abalkhail Consulting Engineers

Location
Jordan - Amman
Education
Bachelor's degree, هندسة مدنية
Experience
11 years, 10 Months

Share My Profile

Block User


Work Experience

Total years of experience :11 years, 10 Months

Assistant Projects Manager at Abalkhail Consulting Engineers
  • Saudi Arabia - Riyadh
  • My current job since September 2018

Duties include but not limited to:
• Oversee variable aspects of projects and provide direct assistance to ensure timely project execution.

• monitoring and keeping track of and reporting on project progress.

• Liaise with project lead and other project managers to maintain project schedule and efficacy.

• Supporting the coordination and management of projects.

• Performing administrative tasks such as preparing invoices, estimates, scheduling meetings, and maintaining project documents and reports.

• following up with stakeholders on the completion or delay of project phases, scheduling meetings,

• Contributing to the planning and tendering of ongoing and prequalification for future projects and preparing commercial and technical proposals.

• Assign duties to staff to implement project goals, as needed.

• Review contractors project schedules, activities, resources to approve the Baseline schedule, cash flow, manpower histogram, etc.

• Monitoring and controlling the progress at site and review daily, weekly and monthly progress reports.

• Giving recommendations, corrective actions and forecasting for various scenarios.

• Study the different obstructions effect on the duration and cost of the project and prepare an EOT claim and a recovery program.

مهندس تخطيط at شركة اليمامة للتجارة والمقاولات
  • Saudi Arabia - Riyadh
  • August 2014 to August 2018

My duties include but not limited to:

• Scheduling the project activities loaded with resources to produce the time schedule, cash flow, manpower histogram, etc.
• Monitoring and controlling the progress at site and making daily, weekly and monthly progress reports.
• Updating the time schedule and comparing the baseline with the actual progress at site using EVM method and making recommendations, corrective actions and forecasting for various scenarios (BAC, TAC).
• Study the different obstructions effect on the duration and cost of the project and prepare an EOT claim and a recovery program.

Some of the projects I worked at:
 Flyover Bridge at Intersection of Al-Azizia Road with Southern Ring Road, Riyadh, KSA.
• The Client: Riyadh Municipality
• Project Contracting Cost is 216 Million SAR, with duration of 20 months.
 The project consists of two Bridges (main bridge and Loop bridge), and each one of them consists of three main work groups which are (Earth Works, Structural Works - starting from the foundations followed by the piers, piers crown ending with the deck slab - and the remaining Miscellaneous Works).

Planning Engineer at Abdul Ali Ajmi Co.
  • Saudi Arabia - Jizan
  • November 2013 to July 2014

Planning Engineer in “Abdul Ali Ajmi Co.”, Saudi Arabia. My duties include but not limited to:
• Scheduling the project activities loaded with resources to produce the time schedule, cash flow, manpower histogram, etc.

• Monitoring and controlling the progress at site and making daily, weekly and monthly progress reports.

• Updating the time schedule and comparing the baseline with the actual progress at site using EVM method and making recommendations, corrective actions and forecasting for various scenarios (BAC, TAC).

Some of the projects I worked at:

 Construction Of Infrastructure For Housing Project In The Regions Of Kingdom, South of KSA.
 The project consist of 7 different sites, the main systems included in each project are (waste water system, Storm drainage system, Potable water system, Supplying site with electricity, street lightening system, communications system, road works and project landscapes).
 Project Contracting Cost is one billion SAR, with duration of 24 months.

 Main Roads in Jazan - First Group, Jazan, KSA.
 The project consists of 3 main work groups which are (Earth Works, Structural Works and the remaining Miscellaneous Works).
 Project Contracting Cost is 268 Million SAR, with duration of 48 months.

Planning Engineer at Al-Rashid Abetong
  • Saudi Arabia - Riyadh
  • October 2011 to January 2013

a planner engineer in the production department. My duties include but not limited to Scheduling, planning, and coordination between sites-design-production departments. I worked as the factory manager and the planning head for many months during the absence of those positions

Education

Bachelor's degree, هندسة مدنية
  • at جامعة الطفيلة التقنية
  • June 2011

Civil engineering is a professional engineering discipline that deals with the design, construction, and maintenance of the physical and naturally built environment, including public works such as roads, bridges, canals, dams, airports, sewerage systems, pipelines, structural components of buildings, and railways

Specialties & Skills

Primavera
MS Project
Planning
Scheduling
Coordination
Cost control
MS office
Planning
MS Project
Primavera
Adobe photoshop

Languages

English
Expert

Memberships

PMI
  • PMP certified
  • January 2021

Training and Certifications

project management professional, PMP 3008913 (Certificate)
Date Attended:
May 2021
Project Management Professional (PMP) (Certificate)
Date Attended:
June 2013
Valid Until:
July 2013
Project Management using Primavera P6 (Certificate)
Date Attended:
September 2013
Valid Until:
October 2013
Project Management (Certificate)
Date Attended:
August 2011
Valid Until:
August 2011
Computer Aided Structural Design Using "PROKON" (Certificate)
Date Attended:
May 2010
Valid Until:
May 2010
Primavera 3 first level (Certificate)
Date Attended:
August 2010
Valid Until:
September 2010

Hobbies

  • Swimming, gaming