mohammed Khovt, QA/ QC Engineer

mohammed Khovt

QA/ QC Engineer

OVERSEAS AST LLC

البلد
الإمارات العربية المتحدة - أبو ظبي
التعليم
الثانوية العامة أو ما يعادلها, CONSTRUCTION QUALITY MANAGEMENT’ (CCQM)
الخبرات
6 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :6 years, 9 أشهر

QA/ QC Engineer في OVERSEAS AST LLC
  • الإمارات العربية المتحدة
  • أغسطس 2016 إلى أبريل 2018

www.overseas-ast.com

Projects Undertaken:
•The project is segregated into four zones comprising the following features:

•Zone 1 - Cruise Terminal including lighthouse, hotel and parking;
•Zone 2 - Logo Island including yacht club, helipads, residential developments and beaches;
•Zone 3 - Mall including hotel, parking, sport overlay, airport terminal and control tower;
•Zone 4 - Marina including a yacht club, helipads and residential developments.
•Cost of the Project 170 million AED
•Duration of project is 1year from the date of sign of contract
•The project awarded for the procurement and construction of the land and marine works related to the project, which comprises the dredging, quay walls, piers, rock works, reclamation & compaction
•Construction of the Zone 4D Central Pier and associated works.
•The scope of works of includes, but is not limited to the following:

•Pile tests as per project requirements
•Driving of steel tubular piles
•Cutting of pile head to the required cut off level (if required)
•Preparation of reinforcement cage and installation of reinforced pile plug
•Installation of precast pile caps
•Installation of cast in-situ concrete at pile caps connections & side walls
•Installation of precast slab & deck rebar fixing
•Installation of cast in-situ slabs & service trenches
•Supply of all materials and consumables
•Temporary works
•Construction of the Zone 4B Central Pier Extension and associated works.
•The scope of works of includes, but is not limited to the following:

•Pile load tests as per project requirements and specifications
•Driving of steel tubular piles
•Cutting of pile head to the required cut off level
•Preparation of reinforcement cage and installation of reinforced pile plug
•Installation of precast pile caps
•Installation of cast in-situ concrete at pile caps connections & side walls
•Installation of precast slab & deck rebar fixing
•Installation of cast in-situ slabs & service trenches
•Installation marine furniture (Fenders, bollards, ladders)
•Supply of all materials and consumables
•Temporary works
•Zone 4B Bay Marina will feature Berths for 193 boats varying from 14m to 160m in total length. Zone 4B consists of a fixed pier structure with pontoons arranged along its length to allow for owners to access their vessels. Construction of precast concrete pontoons and associated works.
•The scope of works of includes, but is not limited to the following:
•Preparation of formworks
•Installation of EPS blocks, rebar and accessories
•Casting of the Pontoon
•Delivering to site
•Lifting into the water
•Installation of the pontoon

Qa/qc Civil Engineer في NASS CONNTRACTING
  • الإمارات العربية المتحدة - أبو ظبي
  • يونيو 2016 إلى مارس 2018

building Two floor administration building for Al Taweelah Alumina Refinery
•OMC lies within the refinery non-process operation management area subject to Estidama requirement to achieve Pearl Two Rating.
•The OMC contains the refinery Central Control Room (CCR) and Laboratory for the refinery operation.
•Civil Infrastructure and landscaping works are limited to the area directly surrounding the OMC building, which require Estidama treatment.
•The Cost of the Project is 60 million AED (USD 16Million - $16, 000, 000)

QA/ QC Engineer
  • ديسمبر 2015 إلى يوليو 2016
QA/ QC Engineer في Island Harbour
  • أبريل 2015 إلى ديسمبر 2015

and Artificial Reefs - Project consists of the quay wall construction, Dredging, Boat ramp construction reclamation and demolition of the existing marine structures, Shore protection, and Pontoon removal and installation, Roads and pavements, Utility service installation.
•Cost of the Project 48million AED
•Duration of project is 10 months from the date of sign of contract
•90, 000 m3 of dredging and reclamation works to form the Harbour, including provision of additional fill
•Landing craft ramp, Boat ramp, Revetment, Breakwater, fender, mooring system and quay ladders, excavation and filling works, roads and pavements, fencing, underground services etc.

في OVERSEAS AST LLC
  • الإمارات العربية المتحدة
  • أبريل 2015 إلى ديسمبر 2015

www.overseas-ast.com

Projects Undertaken:
•Saadiyat Island Project 1001-125 Cultural District Infrastructure package C04, Western Edge Coastal Protection Phase 1A-Construction of Quay wall
•25000 m³ Concreting works
•Cost of the Project 45million AED
•Duration of project

  • الإمارات العربية المتحدة
  • أكتوبر 2014 إلى أبريل 2015

www.overseas-ast.com

Projects Undertaken:
•Dubai Marina Development-Construction of Quay wall
•4000 m³ Concrete works
•Cost of the Project 14million AED
•Duration of project

QC Inspector في OVERSEAS AST LLC
  • الإمارات العربية المتحدة
  • أغسطس 2014 إلى أكتوبر 2014

www.overseas-ast.com

Projects Undertaken:
•Deira side creek Mouth Entry Reporting Wharf :160m
•Deira East Exit Reporting Wharf: 80m
•Deira Re-filling station -80m long wharf near exit reporting wharf
•Deira cornice Dhow Wharfage and loading /Unloading Facilities: 2400m
•Berthing facilities & Boat ramp facility for government Vessels at East
•Administration and Coast guard/Police buildings
•Roads and Infrastructure
•The Cost of the Project is 265 million AED

QC Inspector في SAUDI ARCHIRODON LTD
  • المملكة العربية السعودية
  • يناير 2014 إلى يونيو 2014

www.archirodon.net

Projects Undertaken:
•Construction of Yanbu Power and Desalination Plant Phase-III.
•Construction of Seawater Offshore Intake Channel & Discharge Channel with a Breakwater & Revetment works for Shore Protection works;
•Construction of Seawater Outfall Structure & Dredging works for Discharge Channel;
•Construction of Temporary Jetty, Costal Park Jetty & Construction of Anchor Block 5m x 5m x 2m, Dead man Block & Anchor;
•51 m x 3, 105 m Discharge Channel & 80 m x 2, 000 m Intake Channel Dredging Works;
•Construction of Causeway, Trestle Structure, Unloading & Small Vessel Platforms, Berthing & Mooring Dolphins, Control Building Platform with Structure & Miscellaneous Works like Quick Release Hooks, Laser Docking System, Cathodic Protection, Fender, Oil Boom & Skimmer;
•The Capacity of the plant is Net Power Export (MW) - 2, 700 MW & Net Water Export (m3/d) - 550, 000 m³/day

QC Inspector في SAUDI ARCHIRODON LTD
  • المملكة العربية السعودية
  • يوليو 2011 إلى يناير 2014

www.archirodon.net

Projects Undertaken:
•Construction of Ras Al Khair Power and Desalination Plant Phase-1, Package-D.
•8 Lines of 3, 105 m - 4000mm Ø Offshore GRP Discharge Pipeline Works;
•714, 062.47 Hectares Soil Improvement Using Dynamic Compaction & Dynamic Replacement;
•50 m x 3, 105 m Discharge Channel & 80 m x 2, 000 m Intake Channel Dredging Works;
•2 - 1, 400 m East and West Breakwater;
•Concreting Works for Pumping House.
•The Cost of the Project is 377 million USD.
Description of Duties:
•Review method statements to prepare a sound and practical Inspection and Test Plan (ITP) that are compliant to the project specification;
•Maintaining the IMS system (Integrated Management System) to Raising & closing NRI/RFI (Request for Inspection) and Conducting the Inspection;
•Raising MRIR (Material Receiving Inspection Report) for all the Construction Materials & Conducting Inspection of Received Material with the Clients;
•Conducting and Performing all the onshore civil Inspection & supervise for them i.e. Earth Improvement activity (Dynamic Compaction), Soil Improvement (CPT, PMT & Surcharge load Test), Reinforcement & Formwork inspection, Concreting, setting out & Marking of Level for formwork, Block/Masonry work for heavy building structures like Pump House, Transition Structures, DAF & DMF Building, Filter Water System, Chemical Storage Building, R.O. Plant Etc. according to Method of Statement (MS), ITP and relevant Drawing;
•Conducting and Performing all the Offshore Inspection on each activity according to the ITP and Method Statements during the Construction of Breakwaters, Temporary Jetty, Outfall Structure, Seawater Intake Pumping Station and Discharge Transition Structure.
•Prepare and established quality forms and checklist as inspection verifying documentations;
•Establish relevant QA/QC project register for monitoring and traceability of documents;
•Review Request for Inspection (RFI) packages prior to submission to clients engineer for approval/ Inspection;
•Monitor and coordinate equipment and device calibration;
•Review the quality report submittals prior to submission to the client’s engineer’s approval;
•Coordinate and witness in major relevant testing or inspection activities such as trial mix and rocks sampling;
•Task to establish Archive and Filing System in Coordination with the Project Document Controller in preparations for Internal, Client and Third Party (TUV) Audits for ISO:9001 certification;
•Responsible for Materials Receiving Inspection for GRP Pipes Delivered and its approvals;
•Attend, Witness and Liaise during Materials Sampling and Testing for the followings:
•Backfilling Materials;
•Quarry Runs, Toe Materials and Armour Rocks;
•Inspect and ensure Dredging works for Intake Channel & Discharge Channel comply with approved IFC Drawings, Method Statement and Inspection Test Plan;
•Attend, Witness and Liaise during Hydrographic Survey of Dredged Trenches;
•Inspect and ensure Soil Improvement works comply with approved method statement and Inspection Test Plan;
•Attend, Witness and Liaise during FDT Testing (Using NDG & Sand cone Method) for Backfilling Works;
•Inspect and ensure Offshore Pipe Installation works & Steel Structures Works (Installation of Grating, Railing, Cladding Materials etc.) Waterproofing Work for Foundation & Walls and Roof Water Proofing System & Interior Installation for Building’s Tiles, Door, Window, glasses and all accessories according to MS, ITP and relevant Drawing;
•Inspect and ensure for all concrete works of Heavy Precast Structures like Diffuser Structures, Outfall Structures, Oil boom precast block, Petrol Bridge Precast and Manhole etc. comply with approved drawings, approved materials, approved Method Statement and Inspection Test Plan;
•Attend, Witness and Liaise during Hydrographic Survey for approval of Installed GRP Pipes;
•Inspect and ensure Breakwater works comply with approved method statement and Inspection Test Plan;
•To coordinate with construction crew for ongoing civil/structural activities, including but not limited to excavation, backfilling, compaction, rebar inspection, formwork inspection, Field Density Test, concrete pouring, asphalting, etc.
•QC inspection, monitoring quality at every stage of work, controlling site management, attend casting of all concrete works;
•Inspect and ensure Painting Inspection (DFT Test and Pull-off Test for Civil and Steel Structures) according Method Statement (MS), Inspection & Test Plan (ITP) and relevant Drawing;
•Conducting Handing over project walk down work ECC (Erection Clearance Certificate), SCC (Safety Clearance Certificate), MCC (Mechanical Clearance Certificate), and all clearance certificate raising conducting inspection and closing activities and clearing Punch list item with RFI and supervision and Inspection for them and closing of all item accordingly client requirement.
•Implement the inspection flow system between the construction team, Consultants BPJV and Clients EGA Engineer;
•Assists in the preparation of quality documentation, including the Inspection & Test Plans (ITPs) and in the review of construction documents for compliance with project quality requirements related to civil works.
•Monitors all measurement & testing instruments employed for Civil works, and that they are functional and calibrated.
•Advises the QC Manager of non-conformance occurrences and where necessary, raises a Non-conformance Report for non-compliant work, and monitors the closeout and effectiveness of the correction and corrective action undertaken.
•Where required, assists the QC Manager in undertaking periodic audits, including those of sub-contractors and suppliers, in particular technical compliance audits in their field of specialization.
•Attends and witnesses all Client verification of work (inspection, test and the like) on site, and coordinates close out of any and all outstanding issues related to Civil works.
•Supervised Sub-Contractors construction work activities
•Conduct tool box talks prior to start of every activity like Concreting works, Blockworks works, plastering, tiling works, painting works, waterproofing system, GRC panel installation etc.
•Raising MRIR (Material Receiving Inspection Report) for all the Construction Materials & Conducting Inspection of Received Material with the Clients;
•Develop Project Quality Plan in relation to project specifications & Develop written procedures for quality control/quality assurance
•Ensuring the implementation of the Quality Management Systems (QMS) and the Project Quality Plan (PQP) to maintain the quality at the project
•Maintaining and control the quality records for the project through document control section
•Surveillance for the Verification & Checking of Calibrated Equipment & its Certifications
•Take the preventive action in order to avoid the Non-conformities to avoid delays in work and take necessary action to solve any problems
•Coordinate and perform inspection WIR and test activities in accordance with relevant ITP, ensuring that completed work is conformant to relevant specification and approved drawings and ready for final inspection by Consultant
•Responsible for coordinating and managing manpower, material, equipment, schedule, quality assurance and control, contract and safety requirements
•Preparing and issuing monthly reports for all inspection activities at site, issue of quality plans, procedures and forms prompted by quality deficiencies, non-conformances, and client complaints or approved staff proposals to achieve continual improvement
•Ensure the documentation generated by the inspections, tests and survey meets the requirements of the inspection test plan
•Issuing weekly reports of quality issues including Key performance indicators KPI’s

الخلفية التعليمية

الثانوية العامة أو ما يعادلها, CONSTRUCTION QUALITY MANAGEMENT’ (CCQM)
  • في Al Sharay PU college of science
  • أكتوبر 2020

, Bus stand road,

دبلوم عالي, CONSTRUCTION QUALITY MANAGEMENT’ (CCQM)
  • في Bangalore University
  • أكتوبر 2020

بكالوريوس, CONSTRUCTION QUALITY MANAGEMENT’ (CCQM)
  • في University Visveswaraya College of Engineering(UVCE)
  • يناير 2015

courses: Internal Auditor (ISO 9001:

بكالوريوس, CONSTRUCTION QUALITY MANAGEMENT’ (CCQM)
  • في National Institute of Construction Management and Research (NICMAR)
  • مارس 2014

in ‘

الثانوية العامة أو ما يعادلها, CONSTRUCTION QUALITY MANAGEMENT’ (CCQM)
  • في National Institute of Construction Quality Management (NICMAR)
  • يناير 2014

الثانوية العامة أو ما يعادلها, CONSTRUCTION QUALITY MANAGEMENT’ (CCQM)
  • في Pre-University College
  • يناير 2007

(12th)

الثانوية العامة أو ما يعادلها, CONSTRUCTION QUALITY MANAGEMENT’ (CCQM)
  • في SSLC
  • يناير 2005

(10th)

Specialties & Skills

Structural
Engineering
ENGINEERING
MICROSOFT WORKS
QUALITY CONTROL
MATERIALS MANAGEMENT
OIL PAINTING
CALIBRATION

اللغات

العربية
متمرّس
الانجليزية
متمرّس
الهندية
متمرّس
الأوردو
متمرّس

الهوايات

  • playing cricket