Mohammed Atif Mohammed Atia EL-Shazly, Senior Electrical QC Engineer @ Enppi (Engineering for the Petroleum and Process Industries)

Mohammed Atif Mohammed Atia EL-Shazly

Senior Electrical QC Engineer @ Enppi (Engineering for the Petroleum and Process Industries)

EGYPTIAN REFINERY COMPANY - ERC REFINERY PROJECT

Location
Egypt - Cairo
Education
Bachelor's degree, Bachelors in Electrical Engineering
Experience
14 years, 10 Months

Share My Profile

Block User


Work Experience

Total years of experience :14 years, 10 Months

Senior Electrical QC Engineer @ Enppi (Engineering for the Petroleum and Process Industries) at EGYPTIAN REFINERY COMPANY - ERC REFINERY PROJECT
  • Egypt - Cairo
  • My current job since December 2014

• Prepare, check and review all Electrical work procedures and inspection test plan according to project requirements and client specifications
• Adhere to project specifications, drawings, data and construction instructions for all Electrical Works
• Keep the site quality control records coordinator informed on matters relating to quality control
• Monitor and Control the mark-up for the construction drawings required developing the as-built drawings
• Establish with the site personnel, practices on testing and turnover of the various systems and assist in securing the necessary client acceptance documentation for record.
• Witness the per-commissioning checks as required and maintain check out records
• Ensure the full implementation of company manuals, procedures and work instructions in accordance with the company / project quality system.

Electrical QC Engineer @ Enppi (Engineering for the Petroleum and Process Industries) at BAPETCO COMPANY - ASSIL&KARAM PROJECT
  • Egypt
  • June 2014 to December 2014

Prepare all Electrical work procedures and inspection test plan according to project requirements and client specifications
• Adhere to project specifications, drawings, data and construction instructions for all Electrical Works
• Keep the site quality control records coordinator informed on matters relating to quality control
• Monitor and Control the mark-up for the construction drawings required developing the as-built drawings
• Establish with the site personnel, practices on testing and turnover of the various systems and assist in securing the necessary client acceptance documentation for record.
• Witness the per-commissioning checks as required and maintain check out records
• Ensure the full implementation of company manuals, procedures and work instructions in accordance with the company / project quality system.

Electrical Site Engineer (Supervision) @ Enppi (Engineering for the Petroleum and Process Industries at PhPC (PHARAONIC PETROLEUM COMPANY)- WEST HARBOR EXPANSION PROJECT
  • Egypt - Port Said
  • March 2013 to June 2014

Solve the problems occurred on site.
Electrical panels installation according to layout
Cable laying, cables glanding and cables termination according to cable schedule and interconnection wiring diagram.
Installation of lighting poles, normal and emergency fixtures and junction boxes.
Installation of Lightning protection system.
Installation of Earthing system.

Electrical Site Engineer (Supervision) @ Enppi (Engineering for the Petroleum and Process Industries at SUMED Company - EXPANSION OF AIN SUKHNA STORAGE PROJECT
  • Egypt - Suez
  • October 2012 to March 2013

Solve the problems occurred on site.
Electrical panels installation according to layout
Cable laying, cables glanding and cables termination according to cable schedule and interconnection wiring diagram.
Installation of lighting poles, normal and emergency fixtures and junction boxes.
Installation of Lightning protection system.
Installation of Earthing system.

Electrical Site engineer @ Enppi (Engineering for the Petroleum and Process Industries) at KPC Company (KHALDA PETROLEUM COMPANY) - KALABSHA PROJECT
  • Egypt
  • December 2010 to October 2012

• Work with main contractor in the technical services, Site electrical engineering department to solve the problems occurs in the site and were sent to me by Request For Information "RFI" Report, also review all electrical documents to find any problems in engineering to solve it if possible and if not to address this problem to the engineering department in main office.
• Reviewing of Plot plan, Single line diagram, Isometric drawings, P&ID, electrical panels drawing, Cable drum schedule, cables schedule, interconnection wiring diagram, switchgear vendor documents, Heat Tracing drawings, installation details drawings, lighting system, lightning protection system and earthing system .
• Installation of electrical panels ( Switchgear, uninterrupted power supply, battery charger, soft starter, local control panels, interposing relay panel, and distribution panels), etc.
• Issue inspection and test reports, carry out these inspections with electrical quality control engineers and work to cover the initiated punch items.
• Assure that site activities as per contract specifications.
• Performing request for inspection to already finished activities.
• Familiar with the technical office duties and responsibilities.
• Issuing weekly of site reports for all electrical site activity.
• Site coordinator.

- Manger operating at Egypt Railway for Integration Services
  • Egypt
  • August 2009 to December 2010

- A washing station works by PLC in addition to the treatment plant for the washing water to be used again and reduce wastage of water
- Washing station consists of the group stages contain engines and water pumps, brushes and alkaline and acidic materials for cleaning and some Blowers to dry.
- Treatment consists of several stages to separate the impurities and sediment from the water and then passing on the filters and some chemicals to produce water can which be used again in the laundry.

Education

Bachelor's degree, Bachelors in Electrical Engineering
  • at High Institute of Technology
  • September 2009

Specialties & Skills

Electrical Engineering
Electrical Maintenance
Electrical Installation
Oil and Gas
computer hardware & Software Maintenance
programmer of microcontroller using assembly language
Microsoft Applications and Office.
ORCAD, MATLA,Basic, Pascal, C++, MATLAB, visual basic

Languages

English
Expert

Memberships

the Egyptian Engineering Syndicate
  • Egyptian Engineering Syndicate
  • November 2009

Training and Certifications

Electrical field Maintenance Engineer in East Esh El- Mellaha Marine Field (Training)
Training Institute:
MAGAWISH PETROLEUM CO.
Date Attended:
June 2009
Testing electronics board (Training)
Training Institute:
Military Factory of Electronics
Date Attended:
August 2005